{"id":15533,"date":"2015-01-30T07:01:51","date_gmt":"2015-01-30T05:01:51","guid":{"rendered":"http:\/\/infois.ro\/?p=15533"},"modified":"2015-01-30T07:01:51","modified_gmt":"2015-01-30T05:01:51","slug":"modificari-importante-in-circulatia-mijloacelor-de-transport-in-comun-pe-tronsoanele-tudor-vladimirescu-baza-3-si-podu-ros-baza-3","status":"publish","type":"post","link":"http:\/\/infois.ro\/?p=15533","title":{"rendered":"Modific\u0103ri importante \u00een circula\u021bia mijloacelor de transport \u00een comun pe tronsoanele Tudor Vladimirescu \u2013 Baza 3 \u0219i Podu Ro\u0219 &#8211; Baza 3"},"content":{"rendered":"<p style=\"text-align: justify;\"><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2015\/01\/tramvai2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-15534\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/cache\/2015\/01\/tramvai2\/42074646.jpg\" alt=\"tramvai\" width=\"387\" height=\"290\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">\u00cencep\u00e2nd de s\u0103pt\u0103m\u00e2na viitoare, la Ia\u0219i vor fi reluate lucr\u0103rile de \u00eenlocuire a c\u0103ii de rulare a tramvaielor pe tronsonul cuprins \u00eentre Bulevardul Tudor Vladimirescu \u0219i Baza 3, motiv pentru care circula\u021bia mijloacelor de transport \u00eentre aceste por\u021biuni va fi asigurat\u0103 de autobuze. Acestea vor face leg\u0103tura \u00eentre Rond \u021au\u021bora \u0219i Tudor Vladimirescu , intersec\u021bie cu Calea Chi\u0219in\u0103ului, \u00eenlocuind astfel traseele de tramvai care circulau pe tronsonul cuprins \u00eentre Baza 3 \u0219i Tudor Vladimirescu. De asemenea, tot din cauza lucr\u0103rilor care vor \u00eencepe la calea de rulare, \u00eencep\u00e2nd de luni, 2 februarie, se suspend\u0103 \u0219i circula\u021bia tramvaielor pe tronsonul Baza 3 \u2013 Podu Ro\u0219.\u00a0 \u00a0Astfel, traseul de tramvai nr. 5 Dacia \u2013 Rond \u021au\u021bora va fi \u00eenlocuit cu un alt traseu, denumit 6B, care va face leg\u0103tura \u00eentre Alexandru cel Bun (Dacia) \u015fi zona Tudor Vladimirescu, f\u0103c\u00e2nd inelul cu zona central\u0103, prin zona T\u00e2rgu Cucului. \u201dEste nevoie de aceste modific\u0103ri, pentru a accelera ritmul lucr\u0103rilor pe toate proiectele europene, \u015fi acolo unde g\u0103sim condi\u0163ii de lucru vom da drumul la aceste lucr\u0103ri\u201d, a declarat viceprimarul Mihai Chirica. Lucr\u0103rile de modernizare a re\u0163elei de linii de tramvai \u00een Polul de Cre\u015ftere Ia\u0219i sunt \u00een valoare\u00a0 de 47.442.859,85 lei, f\u0103r\u0103 TVA, fonduri europene nerambursabile, contribu\u021bia de la bugetul propriu al municipiului ridic\u00e2ndu-se la 1.788.608,33 lei (f\u0103r\u0103 TVA). Proiectul, a c\u0103rui durat\u0103 de implementare este de 31 de luni de la data semn\u0103rii contractului de finan\u021bare (luna august 2013), presupune schimbarea liniilor de tramvai de pe un traseu \u00een lungime total\u0103 de 9,9 km din municipiul Ia\u0219i, care include tronsoanele cuprinse \u00eentre fostul Bazar (Bd. Nicolae Iorga) \u2013 \u0162es\u0103tura \u2013 Calea Chi\u015fin\u0103ului \u2013 Metalurgie \u2013 Doi B\u0103ie\u0163i. Investi\u021bia este realizat\u0103 de asocierea dintre Mari Vila Com SRL, Conest SA \u015fi Gr\u0103dinariu Import Export, termenul de finalizare a lucr\u0103rilor fiind data de 28 iunie 2015. Investi\u021bia face parte din cadrul Programului Opera\u021bional Regional (POR), fiind co-finan\u021bat\u0103 de Uniunea European\u0103, prin Fondul European pentru Dezvoltare Regional\u0103.\u00a0 Investi\u021bia are prev\u0103zut\u0103 \u00een contract o garan\u021bie de execu\u021bie de trei ani \u0219i o alt\u0103 garan\u021bie tehnic\u0103 de execu\u021bie, de zece ani, ceea ce \u00eenseamn\u0103 c\u0103, dac\u0103 \u00een urm\u0103torii zece ani de la finalizarea investi\u021biei (luna iunie 2015) apar disfunc\u021bionalit\u0103\u021bi \u00een utilizarea c\u0103ii de rulare a tramvaielor, acestea vor fi suportate, \u00een \u00eentregime, de c\u0103tre constructor. \u00cen acest moment, la nivelul municipiului, Ia\u015fi calea de rulare tramvai are o lungime de 77,748 km (cale simpl\u0103), din care 28,674 km moderniza\u0163i \u0219i 3,629 km \u00een curs de modernizare.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00cencep\u00e2nd de s\u0103pt\u0103m\u00e2na viitoare, la Ia\u0219i vor fi reluate lucr\u0103rile de \u00eenlocuire a c\u0103ii de&#8230; <a class=\"meta-more\" href=\"http:\/\/infois.ro\/?p=15533\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":15534,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,2361,395,40,4782,1625,1593],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/15533"}],"collection":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15533"}],"version-history":[{"count":1,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/15533\/revisions"}],"predecessor-version":[{"id":15535,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/15533\/revisions\/15535"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/15534"}],"wp:attachment":[{"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15533"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15533"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15533"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}