{"id":19274,"date":"2015-09-05T07:44:13","date_gmt":"2015-09-05T04:44:13","guid":{"rendered":"http:\/\/infois.ro\/?p=19274"},"modified":"2015-09-05T07:44:13","modified_gmt":"2015-09-05T04:44:13","slug":"o-noua-platforma-pentru-pasageri-data-in-folosinta-la-aeroportul-international-iasi","status":"publish","type":"post","link":"http:\/\/infois.ro\/?p=19274","title":{"rendered":"O nou\u0103 platform\u0103 pentru pasageri, dat\u0103 \u00een folosin\u021b\u0103 la Aeroportul Interna\u021bional Ia\u0219i"},"content":{"rendered":"<p style=\"text-align: justify;\"><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2015\/09\/platforma-pasageri.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-19275\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2015\/09\/platforma-pasageri.jpg\" alt=\"platforma-pasageri\" width=\"338\" height=\"225\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2015\/09\/platforma-pasageri.jpg 600w, http:\/\/infois.ro\/wp-content\/uploads\/2015\/09\/platforma-pasageri-300x200.jpg 300w\" sizes=\"(max-width: 338px) 100vw, 338px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">\u00cencep\u00e2nd de s\u0103pt\u0103m\u00e2na viitoare, opera\u021biunile de \u00eembarcare-debarcare a pasagerilor de pe Aeroportul Interna\u021bional Ia\u0219i se transfer\u0103 pe prima suprafa\u021b\u0103 finalizat\u0103 din platforma nou\u0103 a aeroportului. Potrivit reprezentan\u021bilor Aeroportului Interna\u021bional Ia\u0219i, realizarea noii platforme de \u00eembarcare &#8211; debarcare pentru pasageri presupune, conform graficului de lucr\u0103ri, demolarea vechii platforme a aeroportului. \u201dAdministra\u021bia aeroportuar\u0103 a ales s\u0103 nu \u00eentrerup\u0103 opera\u021biunile aeriene \u0219i s-a procedat la realizarea etapizat\u0103 a noii platforme, astfel \u00eenc\u00e2t s\u0103 poat\u0103 fi dat\u0103 \u00een func\u021biune o prim\u0103 suprafa\u021b\u0103, care s\u0103 preia capacit\u0103\u021bile de procesare. \u00cen paralel, se continu\u0103 lucr\u0103rile de extindere a noii infrastructuri, \u00een zona platformei vechi.\u00a0Acest proces de tranzi\u021bie va presupune modific\u0103ri de fluxuri privind accesul pasagerilor \u00eenspre \u0219i dinspre aeronave, modific\u0103ri ce vor crea un posibil disconfort pasagerilor, care vor fi nevoi\u021bi s\u0103 se deplaseze pe l\u00e2ng\u0103 zona delimitat\u0103 pentru \u0219antierul de construc\u021bie\u201d, se precizeaz\u0103 \u00eentr-un comunicat de pres\u0103 al Aeroportului Interna\u021bional Ia\u0219i. Totodat\u0103, este posibil ca pentru respectarea orarului de zbor al fiec\u0103rei companii aeriene, s\u0103 se procedeze la devansarea orelor de \u00eenchidere a procedurii de check in, pentru ca timpul suplimentar necesar accesului la aeronav\u0103 s\u0103 nu duc\u0103 la decalarea orarului de zbor. \u00cen acest sens, reprezentan\u021bii Aeroportului ie\u0219ean recomand\u0103 pasagerilor s\u0103 \u00ee\u0219i programeze deplasarea spre aeroport, \u00een a\u0219a fel \u00eenc\u00e2t s\u0103 r\u0103spund\u0103 noilor condi\u021bii tranzitorii. \u201dAdministra\u021bia Aeroportului Ia\u0219i adreseaz\u0103 pasagerilor rug\u0103mintea de a \u00een\u021belege nevoia acestui proces de transfer. Rolul investi\u021biei \u0219i al tuturor lucr\u0103rilor este ca opera\u021biunile de \u00eembarcare-debarcare pasageri, precum \u0219i de sta\u021bionare, ori manipulare a aeronavelor, s\u0103 se deruleze \u00een deplin\u0103 siguran\u021b\u0103 \u0219i la cele mai \u00eenalte standarde de confort. &#8220;Suntem \u00een fa\u021ba unei noi reu\u0219ite \u0219i a unei noi provoc\u0103ri. Practic, am reu\u0219it s\u0103 finaliz\u0103m \u0219i prima etap\u0103 a noii platforme de \u00eembarcare-debarcare pasageri, precum \u0219i o nou\u0103 cale de rulare, ce va asigura accesul aeronavelor spre noua platform\u0103, fiind cu \u00eenc\u0103 un pas mai aproape de dezideratul de a avea \u00een final \u00eentreaga infrastructur\u0103 de mi\u0219care a Aeroportului Ia\u0219i. Preocuparea noastr\u0103 de a dezvolta aeroportul a creat premisele multiplic\u0103rii mi\u0219c\u0103rilor de aeronave. \u00cen lipsa acestei etape finalizate, ne-am fi aflat \u00een situatia de a nu mai putea folosi fosta platform\u0103, care pe l\u00e2ng\u0103 caracteristicile de portan\u021b\u0103 redus\u0103 fa\u021b\u0103 de nevoia actual\u0103, se afl\u0103 \u0219i \u00eentr-o stare de degradare ce<br \/>\nputea duce la decizia de sistare a opera\u021biunilor aeriene. Am reusit s\u0103 sincroniz\u0103m perfect toate aceste evolu\u021bii \u0219i \u00een cele din urm\u0103 s\u0103 continu\u0103m dezvoltarea Aeroportului Ia\u0219i \u00een condi\u021bii de maxim\u0103 siguran\u021b\u0103.\u00a0Acest proces de finalizare a noii platforme de \u00eembarcare-debarcare va dura aproximativ 30 de zile, moment ce va coincide cu finalizarea noului terminal T3, care este pozi\u021bionat foarte aproape de zona de \u00eembarcare-debarcare pasageri. Diferen\u021bele \u00eentre fosta infrastructur\u0103 de platform\u0103 \u0219i cea nou\u0103 sunt imense, neexist\u00e2nd nici m\u0103car un singur termen de compara\u021bie. V\u0103z\u00e2nd cifrele de portan\u021b\u0103 a noii platforme, cred c\u0103 ast\u0103zi avem cea mai solid\u0103 \u0219i bine realizat\u0103 platform\u0103 de \u00eembarcare-debarcare din Rom\u00e2nia\u201d,\u00a0a declarat Marius Bodea, pre\u0219edintele Consiliului de Administra\u021bie (CA) al Aeroportului Interna\u021bional Ia\u0219i. Reamintim c\u0103\u00a0Aeroportul Interna\u021bional Ia\u0219i deruleaz\u0103 \u00een prezent Proiectul de Dezvoltare \u0219i Modernizare, \u00een valoare total\u0103 de 56,7 milioane de euro, obiectivele majore realizate \u00een mare parte fiind proiectarea \u0219i execu\u021bia lucr\u0103rilor pentru realizarea suprafe\u021belor de mi\u0219care aferente unei piste noi, cu lungimea de 2.400 metri, extinderea suplimentar\u0103 a platformei parcare aeronave \u0219i construc\u021bia unui nou terminal de pasageri. Din totalul sumei mentionate, 38,7 milioane de euro reprezint\u0103 finan\u021bare european\u0103 nerambursabil\u0103.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00cencep\u00e2nd de s\u0103pt\u0103m\u00e2na viitoare, opera\u021biunile de \u00eembarcare-debarcare a pasagerilor de pe Aeroportul Interna\u021bional Ia\u0219i se&#8230; <a class=\"meta-more\" href=\"http:\/\/infois.ro\/?p=19274\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":19275,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,41],"tags":[74,448,1811,40,4782,3877,6712],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/19274"}],"collection":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=19274"}],"version-history":[{"count":1,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/19274\/revisions"}],"predecessor-version":[{"id":19276,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/19274\/revisions\/19276"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/19275"}],"wp:attachment":[{"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=19274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=19274"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=19274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}