{"id":23444,"date":"2016-05-18T06:44:06","date_gmt":"2016-05-18T03:44:06","guid":{"rendered":"http:\/\/infois.ro\/?p=23444"},"modified":"2016-05-18T06:44:06","modified_gmt":"2016-05-18T03:44:06","slug":"proiect-european-in-valoare-de-250-milioane-lei-finalizat-cu-succes","status":"publish","type":"post","link":"http:\/\/infois.ro\/?p=23444","title":{"rendered":"Proiect european \u00een valoare de 250 milioane lei, finalizat cu succes"},"content":{"rendered":"<p style=\"text-align: justify;\"><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2016\/05\/caf.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-23445\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2016\/05\/caf.jpg\" alt=\"caf\" width=\"303\" height=\"202\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2016\/05\/caf.jpg 640w, http:\/\/infois.ro\/wp-content\/uploads\/2016\/05\/caf-300x200.jpg 300w\" sizes=\"(max-width: 303px) 100vw, 303px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Prim\u0103ria Municipiului Ia\u0219i a finalizat proiectul european <strong><em>\u201eReabilitarea sistemului de termoficare \u00een municipiul Ia\u015fi \u00een vederea conform\u0103rii cu standardele de mediu privind emisiile \u00een atmosfer\u0103 \u015fi pentru cre\u015fterea eficien\u0163ei energetice \u00een alimentarea cu c\u0103ldur\u0103 urban\u0103\u201d<\/em><\/strong>. Valoarea proiectului a fost de <strong>aproximativ 250 milioane lei<\/strong>, iar lucr\u0103rile s-au desf\u0103\u0219urat cu finan\u021bare european\u0103 prin Programul Opera\u021bional Sectorial de Mediu &#8211; Axa prioritar\u0103 3.<\/p>\n<p style=\"text-align: justify;\"><strong>Primele centrale din Rom\u00e2nia conforme cu standardele de mediu obligatorii \u00een Europa<\/strong><\/p>\n<p style=\"text-align: justify;\">Investi\u021biile realizate pentru echipamentele \u0219i instala\u021biile de la CET Tudor \u0219i CET Holboca fac din cele dou\u0103 centrale de produc\u021bie primele din Rom\u00e2nia conforme cu standardele de mediu impuse de Uniunea European\u0103 tuturor statelor membre \u00eencep\u00e2nd cu 2016. \u201e<em>\u00cen acest moment, furnizarea apei calde \u0219i a c\u0103ldurii pentru ie\u0219eni, din punct de vedere al protec\u021biei mediului, este securizat\u0103<\/em>\u201d, a declarat primarul interimar <strong>Mihai Chirica<\/strong>.<\/p>\n<p style=\"text-align: justify;\">Din punct de vedere financiar, Veolia va acoperi cea mai mare parte din contribu\u021bia bugetului local la proiectul european prin redeven\u021ba suplimentar\u0103. Aceast\u0103 sum\u0103 reprezint\u0103 costurile de construc\u021bii \u0219i montaj pentru toate cele 6 lucr\u0103ri derulate cu finan\u021bare european\u0103: Veolia va suporta cca 85% din contribu\u021bia total\u0103 a Municipalit\u0103\u021bii. Practic, bugetul local acoper\u0103 doar valoarea elementelor de asisten\u021b\u0103 tehnic\u0103 pentru contractele de lucrari, obligatorii conform regulilor europene.<\/p>\n<p style=\"text-align: justify;\"><strong>Continu\u0103 investi\u021biile \u00een modernizarea termofic\u0103rii centralizate din Ia\u0219i<\/strong><\/p>\n<p style=\"text-align: justify;\">Sistemul centralizat de termoficare va fi modernizat \u00een continuare, at\u00e2t cu fondurile operatorului, c\u00e2t \u0219i cu fonduri europene \u0219i de la bugetul local.<\/p>\n<p style=\"text-align: justify;\">\u00cen ultimii 3 ani, Veolia a investit cca 28 milioane lei, pentru ca alte 11 milioane lei s\u0103 fie investite de operator \u00een anul 2016. \u00cen paralel, Prim\u0103ria Ia\u0219i a lansat licita\u021bia public\u0103 pentru lucr\u0103ri aferente noii aplica\u021bii cu finan\u021bare european\u0103 pe Programul Opera\u021bional pentru Infrastructura Mare POIM 2014 &#8211; 2020, \u00een valoare de 28 milioane euro. \u201e<em>P\u00e2n\u0103 acum, tot cu fonduri europene, am \u00eenlocuit 11 km din Magistrala 2 de termoficare. Prin noua aplica\u021bie, vom \u00eenlocui 25 km re\u021bele primare \u0219i 50 km re\u021bele secundare. Primele magistrale reabilitate vor fi pe Bulevardul Mangeron \u0219i \u0218oseaua Na\u021bional\u0103, iar primele conducte secundare \u00eenlocuite vor fi la PT 1 Nicolina \u0219i PT 25 T\u0103t\u0103ra\u0219i <\/em>\u201d, a declarat primarul interimar <strong>Mihai Chirica<\/strong>. La r\u00e2ndul s\u0103u, operatorul va \u00eenlocui din fonduri proprii 5 km de re\u021bele anul acesta, dup\u0103 ce \u00een ultimii 3 ani a \u00eenlocuit 12 km de re\u021bele primare \u0219i secundare.<\/p>\n<p style=\"text-align: justify;\">\u00a0<strong>Sistemul centralizat de termoficare din Ia\u0219i \u2013 unul dintre cele mai performante din \u021bar\u0103<\/strong><\/p>\n<p style=\"text-align: justify;\">\u00a0Ie\u0219enii beneficiaz\u0103 de ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103 \u00een sistem centralizat la un grad de continuitate \u00een furnizare de 97%, printre cele mai ridicate din \u021bar\u0103. Avariile sunt rezolvate \u00een timp record, echipele de interven\u021bii func\u021bion\u00e2nd 7 zile din 7, 24 de ore din 24, iar combustibilul pentru iarn\u0103 este asigurat \u00een totalitate \u00eenc\u0103 \u00eenainte de \u00eenceperea sezonului de \u00eenc\u0103lzire.<\/p>\n<p style=\"text-align: justify;\"><strong><br \/>\n<\/strong><strong>Ce s-a realizat \u00een cadrul proiectului european finalizat:<\/strong><\/p>\n<ol style=\"text-align: justify;\">\n<li><strong><em> Instalatia de denoxare de la CET Holboca:<\/em><\/strong><\/li>\n<\/ol>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; Instala\u021bie cu sistem OFA (aer deasupra focului) \u0219i injec\u021bie de uree<\/p>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; Nivelul maxim al NOx: 200 mg\/Nm3<\/p>\n<ol style=\"text-align: justify;\" start=\"2\">\n<li><strong><em> Instala\u021bia de desulfurare de la CET Holboca \u2013 <\/em><\/strong>desulfurarea cel mai rapid realizat\u0103 din Europa:<\/li>\n<\/ol>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; Pe \u0219antier au fost prezente \u00een medie 130 de persoane pe zi: executan\u021bi, Prim\u0103rie, Veolia<\/p>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; Indicatorii de sulf din emisiile de ardere: limita impus\u0103 de politicile europene de mediu este de\u00a0\u00a0\u00a0 200 mg\/Nm3; constructorul a garantat 50; iar la testele de performan\u021b\u0103 s-a ajuns la recordul de 6 mg\/Nm3<\/p>\n<ol style=\"text-align: justify;\" start=\"3\">\n<li><strong><em> Instala\u021bia de captare \u00een stare uscat\u0103 a zgurii \u0219i cenu\u0219ii de la CET Holboca:<\/em><\/strong><\/li>\n<\/ol>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; Capacitate: 6 tone\/or\u0103 \u00een dou\u0103 vase de colectare; 550 ml de conducte de transport al cenu\u0219ii<\/p>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; Dou\u0103 silozuri de depozitare (1500 mc), filtre pentru despr\u0103fuire \u0219i sistem de desc\u0103rcare telescopic<\/p>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; Dou\u0103 transportoare \u0219i un siloz de 100 mc de depozitare a zgurii<\/p>\n<ol style=\"text-align: justify;\" start=\"4\">\n<li><strong><em> Reabilitarea cazanelor de apa fierbinte CAF 1 si CAF 3 de la CET Tudor:<\/em><\/strong><\/li>\n<\/ol>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; CAF-ul 1 a fost redimensionat la 50 Gcal\/h pentru a putea fi utilizat \u00een timpul verii, atunci c\u00e2nd se furnizeaz\u0103 doar ap\u0103 cald\u0103 c\u0103tre clien\u021bi<\/p>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; CAF-ul 3 este un cazan de 100 Gcal\/h folosit ca echipament de rezerv\u0103 \u00een timpul iernii<\/p>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; Ambele CAF-uri sunt complet automatizate: cantitatea de combustibil este permanent monitorizat\u0103 online pentru a se asigura respectarea limitelor de emisii \u00een atmosfer\u0103<\/p>\n<ol style=\"text-align: justify;\" start=\"5\">\n<li><strong><em> Reabilitarea pompelor de termoficare de la CET 1 si CET 2:<\/em><\/strong><\/li>\n<\/ol>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; \u0218ase pompe cu tura\u021bie variabil\u0103 \u0219i dou\u0103 pompe cu tura\u021bie fix\u0103<\/p>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; Func\u021bionare eficient\u0103 pentru o cantitate optim\u0103 de combustibil utilizat \u0219i, prin urmare, pentru a proteja mediul \u00eenconjur\u0103tor<\/p>\n<ol style=\"text-align: justify;\" start=\"6\">\n<li><strong><em> \u00cenlocuirea a 11 km din magistrala 2 de termoficare:<\/em><\/strong><\/li>\n<\/ol>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; Vechile conducte clasice au fost \u00eenlocuite cu \u021bevi noi preizolate \u00een zonele: Tudor Vladimirescu, T\u0103t\u0103ra\u015fi, Buc\u015finescu &#8211; Independen\u0163ei, Buc\u015finescu &#8211; Centrul Civic<\/p>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; Timpi de execu\u021bie optimiza\u021bi \u00een interesul ie\u0219enilor: nicio oprire a furniz\u0103rii energiei termice pentru realizarea lucr\u0103rilor nu a dep\u0103\u0219it 72 de ore<\/p>\n<p style=\"text-align: justify;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 &#8211; Mai pu\u021bin combustibil necesar \u00een procesul de produc\u021bie \u0219i, astfel, mai pu\u021bine emisii \u00een atmosfer\u0103.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Prim\u0103ria Municipiului Ia\u0219i a finalizat proiectul european \u201eReabilitarea sistemului de termoficare \u00een municipiul Ia\u015fi \u00een&#8230; <a class=\"meta-more\" href=\"http:\/\/infois.ro\/?p=23444\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":23445,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,41],"tags":[74,40,515,493,3916],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/23444"}],"collection":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=23444"}],"version-history":[{"count":1,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/23444\/revisions"}],"predecessor-version":[{"id":23446,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/23444\/revisions\/23446"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/23445"}],"wp:attachment":[{"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=23444"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=23444"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=23444"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}