{"id":29166,"date":"2017-06-09T06:14:59","date_gmt":"2017-06-09T03:14:59","guid":{"rendered":"http:\/\/infois.ro\/?p=29166"},"modified":"2017-06-09T06:14:59","modified_gmt":"2017-06-09T03:14:59","slug":"o-noua-etapa-in-implementarea-proiectul-smid","status":"publish","type":"post","link":"http:\/\/infois.ro\/?p=29166","title":{"rendered":"O nou\u0103 etap\u0103 \u00een implementarea proiectul SMID"},"content":{"rendered":"<p style=\"text-align: justify;\"><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2013\/09\/deseuri.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-7128\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2013\/09\/deseuri.jpg\" alt=\"\" width=\"292\" height=\"219\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2013\/09\/deseuri.jpg 640w, http:\/\/infois.ro\/wp-content\/uploads\/2013\/09\/deseuri-300x225.jpg 300w\" sizes=\"(max-width: 292px) 100vw, 292px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Ministerul Dezvolt\u0103rii Regionale, Administra\u0163iei Publice \u0219i Fondurilor Europene a aprobat etapa a doua a contractului\u00a0 de finan\u0163are pentru proiectul \u201cSistem de management integrat al de\u015feurilor \u00een jude\u0163ul Ia\u015fi&#8221;, informeaz\u0103 Biroul de pres\u0103 al CJ Ia\u015fi, \u00eentr-un comunicat de pres\u0103. Pentru aceast\u0103 etap\u0103, respectiv \u201cFazarea proiectului Sistem de management integrat al de\u0219eurilor \u00een jude\u021bul Ia\u0219i\u201d, a fost alocat\u0103 suma de 36.747.256 lei, din care 564.524 lei reprezinta contribu\u0163ia Consiliului Jude\u0163ean Ia\u015fi. &#8220;\u00cen aceast\u0103 faz\u0103 a proiectului vor fi finalizate lucr\u0103rile la sta\u0163ia de tratare mecano-biologic\u0103 de la \u0162u\u0163ora \u0219i va fi extinsa sta\u021bia de sortare de aici. Se vor achizi\u021biona instala\u0163ii, \u0219i echipamente specifice de lucru \u0219i se vor efectua lucr\u0103ri exterioare. Totodat\u0103, sta\u0163ia de transfer de la B\u0103l\u0163i, sta\u0163ia de sortare \u015fi cea de transfer de la Ruginoasa vor fi finalizate \u00een aceast\u0103 etap\u0103, iar actualul depozit\u00a0 de la H\u00e2rl\u0103u, care nu se mai incadreaz\u0103 \u00een normele europene va fi \u00eenchis&#8221;, se precizeaz\u0103 \u00een comunicatul CJ Ia\u015fi. Valoarea total\u0103 a proiectului \u201cSistem de management integrat al de\u0219eurilor \u00een jude\u021bul Ia\u0219i\u201d este de 247.899.718 lei f\u0103r\u0103 TVA, iar \u00een prima etap\u0103 au fost investi\u021bi deja 173.890.271 lei, f\u0103r\u0103 TVA, termenul de implementare fiind 31 octombrie 2018.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ministerul Dezvolt\u0103rii Regionale, Administra\u0163iei Publice \u0219i Fondurilor Europene a aprobat etapa a doua a contractului\u00a0&#8230; <a class=\"meta-more\" href=\"http:\/\/infois.ro\/?p=29166\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":7128,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[395,40,1583,8215],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/29166"}],"collection":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=29166"}],"version-history":[{"count":1,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/29166\/revisions"}],"predecessor-version":[{"id":29167,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/29166\/revisions\/29167"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/7128"}],"wp:attachment":[{"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=29166"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=29166"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=29166"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}