{"id":36462,"date":"2018-09-06T06:27:31","date_gmt":"2018-09-06T03:27:31","guid":{"rendered":"http:\/\/infois.ro\/?p=36462"},"modified":"2018-09-06T06:27:31","modified_gmt":"2018-09-06T03:27:31","slug":"reteaua-de-distributie-a-energiei-electrice-in-zona-metropolitana-a-municipiului-iasi-extinsa-cu-zece-kilometri","status":"publish","type":"post","link":"http:\/\/infois.ro\/?p=36462","title":{"rendered":"Re\u0163eaua de distribu\u0163ie a energiei electrice \u00een zona metropolitan\u0103 a municipiului Ia\u015fi, extins\u0103 cu zece kilometri"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2018\/09\/retea-energie-electrica.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-36463\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2018\/09\/retea-energie-electrica.jpg\" alt=\"\" width=\"271\" height=\"186\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2018\/09\/retea-energie-electrica.jpg 640w, http:\/\/infois.ro\/wp-content\/uploads\/2018\/09\/retea-energie-electrica-300x206.jpg 300w\" sizes=\"(max-width: 271px) 100vw, 271px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Delgaz Grid anun\u0163\u0103 finalizarea primei etape a investi\u0163iilor planificate pentru dezvoltarea re\u0163elelor de distribu\u0163ie a energiei electrice din zona metropolitan\u0103 a municipiului Ia\u015fi. Reprezentan\u0163ii companiei precizeaz\u0103 c\u0103 au fost realiza\u0163i aproximativ 2,5 km de re\u0163ea subteran\u0103 de medie tensiune \u00eentre sta\u0163ia de transformare a energiei Galata, din municipiul Ia\u015fi, \u015fi localitatea Valea Ad\u00e2nc\u0103, din comuna Miroslava, unde a fost amplasat un nou post de transformare. Totodat\u0103, au fost montate at\u00e2t \u00een sta\u0163ia de transformare, c\u00e2t \u015fi la noul post, echipamente SCADA, ce permit comanda \u015fi controlul instala\u0163iilor de la distan\u0163\u0103. Compania mai anun\u0163\u0103 c\u0103 \u00een c\u00e2teva zile vor fi finalizate \u015fi lucr\u0103rile din cea de-a doua etap\u0103 de investi\u0163ii, urm\u00e2nd ca instala\u0163iile s\u0103 fie puse \u00een func\u0163iune p\u00e2n\u0103 la mijlocul acestei luni. \u00cen cadrul acestor lucr\u0103ri, cu o valoare de aproximativ dou\u0103 milioane de lei, a fost realizat\u0103 o re\u0163ea subteran\u0103 de medie tensiune de circa 7,5 km \u00eentre sta\u0163ia de transformare Manta Ro\u015fie din municipiu \u015fi zona Bucium. &#8220;Realizarea acestor lucr\u0103ri face posibil\u0103, \u00eencep\u00e2nd din aceast\u0103 s\u0103pt\u0103m\u00e2n\u0103, at\u00e2t reluarea procedurilor de racordare la re\u0163ea \u00een cazul documenta\u0163iilor deja depuse, c\u00e2t \u015fi satisfacerea solicit\u0103rilor viitoare&#8221;, se precizeaz\u0103 \u00eentr-un comunicat al Delgaz Grid. Solicit\u0103rile \u00eenso\u0163ite de documentele necesare pentru racordarea la re\u0163eaua de distribu\u0163ie a energiei pot fi depuse \u015fi online, acces\u00e2nd pagina de internet https:\/\/delgaz.ro. Delgaz Grid a demarat \u00een prim\u0103vara acestui an lucr\u0103ri de investi\u0163ii de aproximativ 12 milioane de lei \u00een sistemul de distribu\u0163ie a energiei electrice ce deserve\u015fte zona metropolitan\u0103 din estul \u015fi sud-estul municipiului Ia\u015fi. Investi\u0163iile vizeaz\u0103 cre\u015fterea capacit\u0103\u0163ii re\u0163elei de a prelua noi consumatori \u015fi presupun montarea etapizat\u0103 a unei noi re\u0163ele de medie tensiune cu o lungime de peste 20 km \u015fi a c\u00e2torva zeci de transformatoare. \u00cen acela\u015fi timp, prin realizarea acestor lucr\u0103ri va cre\u015fte \u015fi calitatea serviciului de distribu\u0163ie \u00een zonele vizate, precum \u015fi siguran\u0163a \u00een alimentarea clien\u0163ilor.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Delgaz Grid anun\u0163\u0103 finalizarea primei etape a investi\u0163iilor planificate pentru dezvoltarea re\u0163elelor de distribu\u0163ie a&#8230; <a class=\"meta-more\" href=\"http:\/\/infois.ro\/?p=36462\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":36463,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,41],"tags":[74,8936,333,40,4782,7420,10835],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/36462"}],"collection":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=36462"}],"version-history":[{"count":1,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/36462\/revisions"}],"predecessor-version":[{"id":36464,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/36462\/revisions\/36464"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/36463"}],"wp:attachment":[{"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=36462"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=36462"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=36462"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}