{"id":37215,"date":"2018-10-15T09:15:28","date_gmt":"2018-10-15T06:15:28","guid":{"rendered":"http:\/\/infois.ro\/?p=37215"},"modified":"2018-10-15T09:15:28","modified_gmt":"2018-10-15T06:15:28","slug":"semnaturi-pentru-a8-si-a7","status":"publish","type":"post","link":"http:\/\/infois.ro\/?p=37215","title":{"rendered":"Semn\u0103turi pentru A8 \u0219i A7"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2018\/06\/autostrada.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-35441\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2018\/06\/autostrada.jpg\" alt=\"\" width=\"445\" height=\"303\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2018\/06\/autostrada.jpg 640w, http:\/\/infois.ro\/wp-content\/uploads\/2018\/06\/autostrada-300x205.jpg 300w\" sizes=\"(max-width: 445px) 100vw, 445px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">\u201eAsocia\u021biile \u201d\u00cempreun\u0103 pentru A8\u201d \u0219i \u201dMoldova Vrea Autostrad\u0103\u201d demareaz\u0103 campania civic\u0103 de str\u00e2ngere de semn\u0103turi pentru construirea autostr\u0103zilor A8 \u0219i A7, infrastructur\u0103 ce reprezint\u0103 o condi\u021bie obligatorie pentru dezvoltarea durabil\u0103 economic\u0103 \u0219i social\u0103 a Moldovei \u0219i recuperarea decalajului fa\u021b\u0103 de restul \u021b\u0103rii.<\/p>\n<p style=\"text-align: justify;\">Facem apel la to\u021bi\u00a0locuitorii regiunii, la to\u021bi moldovenii, la to\u021bi rom\u00e2nii din \u021bar\u0103 \u0219i din\u00a0Diaspora, s\u0103 se al\u0103ture acestei AC\u021aIUNI pentru a for\u021ba Guvernul Rom\u00e2niei s\u0103 deblocheze\u00a0construirea acestor autostr\u0103zi cu fondurile nerambursabile oferite de ani de\u00a0zile de Uniunea European\u0103.<\/p>\n<p style=\"text-align: justify;\">\u00cempreun\u0103 vom pune presiune\u00a0pe decidentul politic care am\u00e2n\u0103 construirea A8 \u0219i A7 de aproape 11 ani \u0219i cerem imperativ:<\/p>\n<ol style=\"text-align: justify;\">\n<li><strong>Construirea Autostr\u0103zii A8,<\/strong><strong>Ungheni \u2013 Ia\u0219i \u2013 Pa\u0219cani &#8211; T\u00e2rgu Neam\u021b \u2013 Ditr\u0103u \u2013\u00a0T\u00e2rgu Mure\u0219 p\u00e2n\u0103 la 01 Decembrie 2026<\/strong><\/li>\n<\/ol>\n<p style=\"text-align: justify;\">1.<u>TRONSONUL UNGHENI \u2013 IA\u0218I \u2013 PA\u0218CANI &#8211; T\u00c2RGU NEAM\u021a &#8211; finalizare 01 Decembrie 2024<\/u><\/p>\n<ol style=\"text-align: justify;\">\n<li>a) Trecerea proiectului acestui tronson de la Comisia Na\u021bional\u0103 de Strategie \u0219i\u00a0Prognoz\u0103 \u00eenapoi la CNAIR \u0219i Ministerul Transporturilor.<\/li>\n<li>b) Renun\u021barea la\u00a0realizarea acestui tronson prin sistemul Parteneriat Public Privat (PPP).<\/li>\n<li>c) Realizarea Studiilor de\u00a0Fezabilitate \u0219i Proiectare prin finan\u021bare din fonduri europene \u0219i cofinan\u021bare de la Bugetul Na\u021bional p\u00e2n\u0103 la 15 Octombrie 2020.<\/li>\n<li>d) Realizarea construc\u021biei\u00a0prin finan\u021bare din fonduri europene \u0219i cofinan\u021bare de la Bugetul Na\u021bional p\u00e2n\u0103 la 01 Decembrie 2024.<\/li>\n<\/ol>\n<p style=\"text-align: justify;\">2.<u>TRONSONUL T\u00c2RGU NEAM\u021a- DITR\u0102U &#8211; finalizare 01 Decembrie 2026<\/u><\/p>\n<ol style=\"text-align: justify;\" start=\"2020\">\n<li>a) Realizarea Studiilor de\u00a0Fezabilitate \u0219i Proiectare prin finan\u021bare din fonduri europene \u0219i cofinan\u021bare de la Bugetul Na\u021bional p\u00e2n\u0103 la 15 Octombrie 2020.<\/li>\n<li>b) Realizarea construc\u021biei\u00a0prin finan\u021bare din fonduri europene \u0219i cofinan\u021bare de la Bugetul Na\u021bional p\u00e2n\u0103 la 01 Decembrie 2026.<\/li>\n<li><u>TRONSONUL DITR\u0102U \u2013 T\u00c2RGU MURE\u0218 &#8211; finalizare 01 Decembrie 2025<\/u><\/li>\n<li>a) Realizarea Studiilor de\u00a0Fezabilitate \u0219i Proiectare prin finan\u021bare din fonduri europene \u0219i cofinan\u021bare de la Bugetul Na\u021bional p\u00e2n\u0103 la 15 Octombrie 2020.<\/li>\n<li>b) Realizarea construc\u021biei\u00a0prin finan\u021bare din fonduri europene \u0219i cofinan\u021bare de la Bugetul Na\u021bional p\u00e2n\u0103 la 01 Decembrie 2025.<\/li>\n<li><strong> Construirea Autostr\u0103zii A7, Siret &#8211; Suceava \u2013 Pa\u0219cani &#8211; Bac\u0103u &#8211; Foc\u0219ani &#8211; Buz\u0103u &#8211; Ploie\u0219ti, p\u00e2n\u0103 la 01 Decembrie 2025.<\/strong><\/li>\n<li>Modificarea \u00eencadr\u0103rii construc\u021biei din Drum Expres \u00een Autostrad\u0103, \u00eenc\u0103 din faza de proiectare.<\/li>\n<li>Introducerea \u00een proiect \u0219i a sectorului Siret &#8211; Suceava &#8211; Pa\u0219cani \/A7, acum absent, ceea ce las\u0103 Suceava \u0219i Boto\u0219ani \u00een izolare. Autostrada A7 trebuie s\u0103 se termine la grani\u021ba Rom\u00e2niei cu Ucraina, la Vama Siret;<\/li>\n<\/ol>\n<p style=\"text-align: justify;\">3.Finalizarea Studiilor de Fezabilitate \u0219i Proiectare \u2013 p\u00e2n\u0103 la 15 Octombrie 2020, cu finan\u021bare din fonduri europene \u0219i cofinan\u021bare de la Bugetul Na\u021bional;<\/p>\n<ol style=\"text-align: justify;\" start=\"4\">\n<li>Realizarea construc\u021biei prin finan\u021bare din fonduri europene \u0219i cofinan\u021bare de la Bugetul Na\u021bional p\u00e2n\u0103 la 01 Decembrie 2025.<\/li>\n<\/ol>\n<p style=\"text-align: justify;\"><strong>III) Stabilirea unui dialog opera\u021bional, a unui contact permanent \u00eentre deciden\u021bii politici \u0219i societatea civil\u0103, prin cele dou\u0103 asocia\u021bii civice \u2013 &#8221;\u00cempreun\u0103 pentru A8&#8221; \u0219i &#8221;Moldova Vrea Autostrad\u0103&#8221; \u0219i a unei comisii de monitorizare a proiectelor A8 \u0219i A7.<\/strong><\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Declan\u0219\u0103m, astfel, <strong>AC\u021aIUNEA MOLDOVA \u2013 SEMN\u0102TURI PENTRU A8 \u0218I A7<\/strong> \u0219i \u00eempreun\u0103, to\u021bi locuitorii acestei regiuni \u0219i ai acestei \u021b\u0103ri vom smulge de la acest Guvern de rea-credin\u021b\u0103 ceea ce ni se cuvine: infrastructur\u0103 modern\u0103 \u0219i \u0219ansa unui viitor prosper.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Semnat ast\u0103zi, 14 Octombrie 2018, Ia\u0219i<\/p>\n<p style=\"text-align: justify;\">Asocia\u021biile <strong>&#8221;\u00cempreun\u0103 pentru A8<\/strong>&#8221; Ia\u0219i \u0219i <strong>&#8221;Moldova Vrea Autostrad\u0103&#8217;<\/strong>&#8216; Ia\u0219i<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u201eAsocia\u021biile \u201d\u00cempreun\u0103 pentru A8\u201d \u0219i \u201dMoldova Vrea Autostrad\u0103\u201d demareaz\u0103 campania civic\u0103 de str\u00e2ngere de semn\u0103turi&#8230; <a class=\"meta-more\" href=\"http:\/\/infois.ro\/?p=37215\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":35441,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,41],"tags":[74,2755,11313,2681,40],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/37215"}],"collection":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=37215"}],"version-history":[{"count":1,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/37215\/revisions"}],"predecessor-version":[{"id":37216,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/37215\/revisions\/37216"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/35441"}],"wp:attachment":[{"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=37215"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=37215"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=37215"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}