{"id":42982,"date":"2019-08-27T06:16:08","date_gmt":"2019-08-27T03:16:08","guid":{"rendered":"http:\/\/infois.ro\/?p=42982"},"modified":"2019-08-27T06:16:08","modified_gmt":"2019-08-27T03:16:08","slug":"firme-din-turcia-si-polonia-concureaza-pentru-a-aduce-tramvaie-noi-la-iasi","status":"publish","type":"post","link":"http:\/\/infois.ro\/?p=42982","title":{"rendered":"Firme din Turcia \u015fi Polonia concureaz\u0103 pentru a aduce tramvaie noi la Ia\u015fi"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2019\/05\/tramvai.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-41513\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2019\/05\/tramvai.jpg\" alt=\"\" width=\"338\" height=\"224\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2019\/05\/tramvai.jpg 640w, http:\/\/infois.ro\/wp-content\/uploads\/2019\/05\/tramvai-300x199.jpg 300w\" sizes=\"(max-width: 338px) 100vw, 338px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Pe baza fondurilor europene prin Programul Opera\u021bional Regional &#8211; Axa 4.1 (Reducerea emisiilor de carbon \u00een municipiile re\u0219edin\u021b\u0103 de jude\u021b prin investi\u021bii bazate pe planurile de mobilitate urban\u0103 durabil\u0103), Prim\u0103ria Municipiului Ia\u0219i organizeaz\u0103 o licita\u021bie pentru achizi\u021bionarea a 16 tramvaie cu lungimea de minim 26 de metri. Prevederea bugetar\u0103 a licita\u021biei este de 142.721.280 lei, f\u0103r\u0103 TVA (aproximativ 30,23 milioane de euro), adic\u0103 maxim 1,89 milioane de euro, f\u0103r\u0103 TVA, pentru fiecare tramvai. \u00a0Termenul de depunere a ofertelor la aceast\u0103 licita\u021bie a fost \u015funi, 26 august, ora 15.00. La licita\u021bie au depus oferte dou\u0103 companii str\u0103ine, care s-au ar\u0103tat interesate de toate cele trei loturi, corespunz\u0103toare a trei proiecte, \u00een care a fost \u00eemp\u0103r\u021bit\u0103 procedura: Bozankaya Otomotiv Mak. Iml. Ith. Ve Ihr. A.\u015e. (Turcia) \u0219i Pojazdy Szynowe Pesa Bydgoszcz Sp\u00f3lka Akcyjna (Polonia). Achizi\u021bia celor 16 tramvaie face parte trei din proiecte cu finan\u021bare european\u0103 derulate de Prim\u0103ria Municipiului Ia\u0219i care privesc \u0219i lucr\u0103ri de modernizare a liniilor de tramvai, refacere a carosabilului \u0219i trotuarelor, construirea de sta\u021bii, amenajarea de locuri de parcare \u0219i spa\u021bii verzi etc. pe mai multe tronsoane. \u00cen cadrul celor trei proiecte municipalitatea a organizat patru licita\u021bii, din care trei pentru lucr\u0103ri de construc\u021bii, iar cea de-a patra pentru mijloacele de transport. Astfel, proiectul \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i \u2013 Reorganizarea circula\u021biei pe bulevardul Tudor Vladimirescu\u201d are o valoare total\u0103 de 114,197,308.33 lei (aproximativ 24 de milioane de euro) \u0219i prevede execu\u021bia lucr\u0103rilor de construc\u021bii \u0219i instala\u021bii aferente liniei de tramvai intersec\u021bie Buc\u0219inescu \u2013 bulevardul Tudor Vladimirescu \u2013 intersec\u021bie Calea Chi\u0219in\u0103ului (lungime: 2.444 metri \u2013 cale simpl\u0103 de rulare), reabilitarea celor dou\u0103 peroane din sta\u021bia Tudor Vladimirescu, reabilitarea podului Tudor Vladimirescu (suprafa\u021b\u0103: 1.196 metri p\u0103tra\u021bi), construirea a dou\u0103 sta\u021bii de tramvai, precum \u0219i achizi\u021bia a \u0219apte tramvaie. Contractul de lucr\u0103ri a fost semnat deja cu\u00a0 asocierea Conest SA Ia\u0219i &#8211; Mari Vila Com SRL Bucure\u0219ti, contra unei sume de 34.475.207,68 lei, inclusiv TVA (aproximativ 7,24 milioane de euro). Proiectul \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i\u201d are o valoare total\u0103 de 114.359.729,95 lei (aproape 24 milioane de euro) \u0219i presupune reabilitarea infrastructurii \u0219i suprastructurii c\u0103ii de rulare tramvai pe trei tronsoane: Cinci Drumuri \u2013 strada P\u0103durii \u2013 strada Nicori\u021b\u0103, Pia\u021ba Podu Ro\u0219 \u2013 intersec\u021bie cu bulevardul Prim\u0103verii \u0219i bulevardul Virgil S\u0103hleanu \u2013 intersec\u021bie cu bulevardul Metalurgiei \u2013 rond \u021au\u021bora, precum \u0219i achizi\u021bionarea a cinci tramvaie. Licita\u021bia pentru lucr\u0103ri a avut o prevedere bugetar\u0103 de 44.356.437,96 lei, f\u0103r\u0103 TVA (aproape 9,4 milioane de euro) \u0219i a atras tot oferta asocierii Conest SA Ia\u0219i &#8211; Mari Vila Com SRL Bucure\u0219ti. \u00cen fine, proiectul \u201eReabilitarea infrastructurii de tramvai Ia\u0219i \u2013 Dancu\u201d are o valoare total\u0103 de 104.022.632 lei (circa 22 milioane de euro) \u0219i vizeaz\u0103 reabilitarea infrastructurii de tramvai Ia\u0219i \u2013 Dancu, reabilitarea podului Ciurchi II \u0219i achizi\u021bionarea a patru tramvaie. Licita\u021bia pentru lucr\u0103ri a avut o prevedere financiar\u0103 de prevedere bugetar\u0103 de 45.035.176,97 lei (aproape 9,4 milioane de euro) \u0219i a primit o ofert\u0103 din partea asocierii Mari Vila Com SRL Bucure\u0219ti &#8211; Conest SA Ia\u0219i. Valoarea total\u0103 a celor trei proiecte este 332.579.670,28 lei (aproximativ 70,46 milioane de euro). P\u00e2n\u0103 \u00een prezent Prim\u0103ria Municipiului Ia\u0219i a semnat contractele de finan\u021bare nerambursabil\u0103 pentru proiectele \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i \u2013 Reorganizarea circula\u021biei pe bulevardul Tudor Vladimirescu\u201d (114,197,308.33 lei, circa 24 de milioane de euro) \u0219i \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i\u201d (114.359.729,95 lei, aproape 24 de milioane de euro). \u00cen alt\u0103 ordine de idei, nu mai pu\u021bin de \u0219ase companii sau asocieri de firme au depus pe 12 august oferte la licita\u021bia pentru livrarea de autobuze electrice de 12 metri pentru \u0219apte municipii din \u021bar\u0103, din care 20 pentru Ia\u0219i. Licita\u021bia organizat\u0103 de Ministerul Dezvolt\u0103rii Regionale \u0219i Administra\u021biei Publice se bazeaz\u0103 tot pe ob\u021binerea fondurilor europene prin Programul Opera\u021bional Regional &#8211; Axa 4.1. Procedura a avut o valoare de circa 365.000.000 lei \u0219i vizeaz\u0103, \u00een total, achizi\u021bia a 131 de autobuze electrice de 12 metri, precum \u0219i construirea a 39 de sta\u021bii de \u00eenc\u0103rcare rapid\u0103 \u0219i a 131 de sta\u021bii de \u00eenc\u0103rcare lent\u0103. Cele 131 de autobuze sunt repartizate astfel: Ia\u015fi (20 autobuze, \u0219ase sta\u0163ii de \u00eenc\u0103rcare rapid\u0103 \u015fi 20 de sta\u0163ii de \u00eenc\u0103rcare lent\u0103, toate \u00een valoare de 55,5 milioane lei), Pite\u015fti (40 autobuze, 110,5 milioane lei), T\u00e2rgu Mure\u015f (32 autobuze, 89 milioane lei), Suceava (15 autobuze, 41,4 milioane lei), Sibiu (nou\u0103 autobuze, 25,1 milioane lei) \u015fi Sighetu Marma\u0163iei (\u0219apte autobuze, 19,4 milioane lei). \u00a0Firmele \u0219i asocierile care au ofertat pentru toate cele \u0219apte municipii sunt Bozankaya Otomotiv din Turcia, New Kopel Car Import din Israel, Anadolu Automobil Rom (importator ISUZU), Solaris Bus &amp; Coach din Polonia \u015fi Golden Dragon Bus din China, la licita\u021bie mai fiind \u00eenscris\u0103 \u0219i compania Sor Libchavy din Cehia, care a depus \u00eens\u0103 o ofert\u0103 doar pentru Sibiu. \u00cen Ia\u0219i, cele 20 de autobuze electrice de 12 metri vor deservi rutele 28 (Triumf &#8211; Podu Ro\u015f &#8211; Mircea cel B\u0103tr\u00e2n &#8211; Dacia) \u015fi 36 (Dacia &#8211; Gar\u0103 &#8211; Copou &#8211; Breazu). P\u00e2n\u0103 pe 23 septembrie, dup\u0103 o nou\u0103 am\u00e2nare, Ministerul Dezvolt\u0103rii Regionale \u0219i Administra\u021biei Publice a\u0219teapt\u0103 oferte la o licita\u021bie care vizeaz\u0103 achizi\u021bia a 70 de autobuze electrice cu lungimea de 10 metri, pentru patru municipii din \u021bar\u0103: Ia\u015fi (24 de autobuze, \u0219apte sta\u021bii de \u00eenc\u0103rcare rapid\u0103 \u0219i 24 de sta\u021bii de \u00eenc\u0103rcare lent\u0103, \u00een valoare total\u0103 de 54,5 milioane lei), Jude\u021bul Neam\u0163 (21 autobuze, 48,1 milioane lei), T\u00e2rgu Mure\u015f (15 autobuze, 34,4 milioane lei) \u015fi Tulcea (10 autobuze, 22,8 milioane lei). Valoarea total\u0103 a achizi\u0163iei se ridic\u0103 la circa 160.000.000 lei. Cele 24 de autobuze electrice de 10 metri vor fi folosite \u00een transportul public din Ia\u0219i astfel: 14 pe ruta 42 (Copou &#8211; CUG) \u0219i 10 pe traseul 52 (Pia\u0163a Alexandru cel Bun &#8211; Pasaj Octav B\u0103ncil\u0103 &#8211; Copou). Pe 15 iulie, dup\u0103 mai multe am\u00e2n\u0103ri, a avut loc deschiderea ofertelor primite \u00een cadrul licita\u021biei pentru achizi\u021bionarea a 16 tramvaie cu lungimea de circa 30 de metri destinate transportului public din municipiul Ia\u0219i. La licita\u021bie a fost primit\u0103 o singur\u0103 ofert\u0103, din partea produc\u0103torului polonez PESA Bydgoszcz. Organizatorul achizi\u021biei este Ministerul Dezvolt\u0103rii Regionale \u0219i Administra\u021biei Publice, iar beneficiarul Municipiul Ia\u0219i. Valoarea total\u0103 estimat\u0103 a contractului este 184.000.000 lei, f\u0103r\u0103 TVA (aproximativ 38,73 milioane de euro), adic\u0103 maxim circa 2,42 milioane de euro, f\u0103r\u0103 TVA, pentru fiecare tramvai. Durata contractului este de 24 de luni, din care perioada de livrare de opt luni. Cele 16 tramvaie sunt destinate rutelor 1, 3, 7, 8 \u0219i 13.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pe baza fondurilor europene prin Programul Opera\u021bional Regional &#8211; Axa 4.1 (Reducerea emisiilor de carbon&#8230; <a class=\"meta-more\" href=\"http:\/\/infois.ro\/?p=42982\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":41513,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,395,40,8856,12563,1625],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/42982"}],"collection":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=42982"}],"version-history":[{"count":1,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/42982\/revisions"}],"predecessor-version":[{"id":42983,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/42982\/revisions\/42983"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/41513"}],"wp:attachment":[{"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=42982"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=42982"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=42982"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}