{"id":44290,"date":"2019-11-12T09:14:46","date_gmt":"2019-11-12T07:14:46","guid":{"rendered":"http:\/\/infois.ro\/?p=44290"},"modified":"2019-11-12T09:14:46","modified_gmt":"2019-11-12T07:14:46","slug":"incepand-cu-anul-viitor-la-iasi-vor-circula-tramvaie-noi","status":"publish","type":"post","link":"http:\/\/infois.ro\/?p=44290","title":{"rendered":"\u00cencep\u00e2nd cu anul viitor, la Ia\u0219i vor circula tramvaie noi"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2019\/11\/tramvaie-turcesti-la-iasi.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-44291\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2019\/11\/tramvaie-turcesti-la-iasi.jpg\" alt=\"\" width=\"343\" height=\"223\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2019\/11\/tramvaie-turcesti-la-iasi.jpg 640w, http:\/\/infois.ro\/wp-content\/uploads\/2019\/11\/tramvaie-turcesti-la-iasi-300x195.jpg 300w\" sizes=\"(max-width: 343px) 100vw, 343px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">\u00cen prezen\u0163a primarului Mihai Chirica \u015fi a directorului de export al companiei turce\u015fti Bozankaya, Yigt Belin, la Ia\u015fi a fost semnat luni, 11 noiembrie, contractul privind achizi\u021bionarea de c\u0103tre Municipiul Ia\u015fi a unui num\u0103r de 16 tramvaie noi. \u00cen urma licita\u0163iei organizate de Ministerul Dezvolt\u0103rii Regionale \u015fi Administra\u0163iei Publice, compania turceasc\u0103 Bozankaya a fost declarat\u0103 c\u00e2\u015ftig\u0103toare \u00een fa\u0163a polonezilor de la Pesa. Turcii urmeaz\u0103 astfel s\u0103 livreze municipiului Ia\u015fi, \u00een urm\u0103toarele 48 de luni, un num\u0103r de 16 tramvaie noi, la un pre\u0163 total de 140,8 milioane de lei (aproximativ 30 de milioane de euro). De remarcat c\u0103, recent, turcii de la Bozakaya au c\u00e2\u015ftigat o licita\u0163ie similar\u0103 organizat\u0103 tot de MDRAP la Timi\u015foara.\u00a0 Tramvaiele vor avea o lungime de 26 metri \u0219i vor avea, printer altele, \u015fi aer condi\u0163ionat. Contractul face parte din Programul Opera\u021bional Regional \u00a0(POR) \u2013 Axa 4.1 &#8211; reducerea emisiilor de carbon \u00een municipiile re\u0219edin\u021b\u0103 de jude\u021b prin investi\u021bii bazate pe planurile de mobilitate urban\u0103 durabil\u0103. Prevederea bugetar\u0103 a licita\u021biei s-a ridicat la 142.721.280 lei, f\u0103r\u0103 TVA (aproximativ 30,23 milioane de euro), adic\u0103 maximum 1,89 milioane de euro, f\u0103r\u0103 TVA, pentru fiecare tramvai. Pe l\u00e2ng\u0103 acest proiect, Prim\u0103ria municipiului Ia\u015fi mai are depuse alte trei proiecte cu finan\u0163are european\u0103 nerambursabil\u0103 privind modernizarea c\u0103ii de rulare a tramvaielor, refacerea carosabilului \u0219i a trotuarelor, construirea de noi sta\u021bii pentru mijloacele de transport \u00een comun, precum \u015fi amenajarea de noi locuri de parcare \u0219i spa\u021bii verzi pe mai multe tronsoane de circula\u0163ie a mijloacelor de transport \u00een comun.\u00a0 Astfel, proiectul \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i \u2013 Reorganizarea circula\u021biei pe bulevardul Tudor Vladimirescu\u201d, cu o valoare total\u0103 de 114,197,308.33 lei (aproximativ 24 de milioane de euro), prevede execu\u021bia lucr\u0103rilor de construc\u021bii \u0219i instala\u021bii aferente liniei de tramvai intersec\u021bie Buc\u0219inescu \u2013 bulevardul Tudor Vladimirescu \u2013 intersec\u021bie Calea Chi\u0219in\u0103ului (lungime: 2.444 metri \u2013 cale simpl\u0103 de rulare), reabilitarea celor dou\u0103 peroane din sta\u021bia Tudor Vladimirescu, reabilitarea podului Tudor Vladimirescu (suprafa\u021b\u0103: 1.196 metri p\u0103tra\u021bi), construirea a dou\u0103 sta\u021bii de tramvai, precum \u0219i achizi\u021bia a \u0219apte tramvaie. Contractul de lucr\u0103ri a fost semnat deja cu asocierea Conest SA Ia\u0219i \u2013 Mari Vila Com SRL Bucure\u0219ti, contra unei sume de 34.475.207,68 lei, inclusiv TVA (aproximativ 7,24 milioane de euro). La r\u00e2ndul s\u0103u, proiectul \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i\u201d, cu o valoare total\u0103 de 114.359.729,95 lei (aproape 24 milioane de euro), presupune reabilitarea infrastructurii \u0219i suprastructurii c\u0103ii de rulare tramvai pe trei tronsoane: Cinci Drumuri \u2013 strada P\u0103durii \u2013 strada Nicori\u021b\u0103, Pia\u021ba Podu Ro\u0219 \u2013 intersec\u021bie cu bulevardul Prim\u0103verii \u0219i bulevardul Virgil S\u0103hleanu \u2013 intersec\u021bie cu bulevardul Metalurgiei \u2013 rond \u021au\u021bora, precum \u0219i achizi\u021bionarea a cinci tramvaie. Licita\u021bia pentru lucr\u0103ri a avut o prevedere bugetar\u0103 de 44.356.437,96 lei, f\u0103r\u0103 TVA (aproape 9,4 milioane de euro) \u0219i a atras tot oferta asocierii Conest SA Ia\u0219i \u2013 Mari Vila Com SRL Bucure\u0219ti. Nu \u00een ultimul r\u00e2nd, proiectul \u201eReabilitarea infrastructurii de tramvai Ia\u0219i \u2013 Dancu\u201d are o valoare total\u0103 de 104.022.632 lei (circa 22 milioane de euro) \u0219i vizeaz\u0103 reabilitarea infrastructurii de tramvai Ia\u0219i \u2013 Dancu, reabilitarea podului Ciurchi II \u0219i achizi\u021bionarea a patru tramvaie. Licita\u021bia pentru lucr\u0103ri a avut o prevedere financiar\u0103 de prevedere bugetar\u0103 de 45.035.176,97 lei (aproape 9,4 milioane de euro) \u0219i a primit o ofert\u0103 din partea asocierii Mari Vila Com SRL Bucure\u0219ti \u2013 Conest SA Ia\u0219i. Valoarea total\u0103 a celor trei proiecte este 332.579.670,28 lei (aproximativ 70,46 milioane de euro). P\u00e2n\u0103 \u00een prezent, Prim\u0103ria Municipiului Ia\u0219i a semnat contractele de finan\u021bare nerambursabil\u0103 pentru proiectele \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i \u2013 Reorganizarea circula\u021biei pe bulevardul Tudor Vladimirescu\u201d (114,197,308.33 lei, circa 24 de milioane de euro) \u0219i \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i\u201d (114.359.729,95 lei, aproape 24 de milioane de euro).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00cen prezen\u0163a primarului Mihai Chirica \u015fi a directorului de export al companiei turce\u015fti Bozankaya, Yigt&#8230; <a class=\"meta-more\" href=\"http:\/\/infois.ro\/?p=44290\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":44291,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,1400,40,846,1625],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/44290"}],"collection":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=44290"}],"version-history":[{"count":1,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/44290\/revisions"}],"predecessor-version":[{"id":44292,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/44290\/revisions\/44292"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/44291"}],"wp:attachment":[{"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=44290"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=44290"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=44290"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}