{"id":63034,"date":"2022-06-06T18:55:51","date_gmt":"2022-06-06T15:55:51","guid":{"rendered":"http:\/\/infois.ro\/?p=63034"},"modified":"2022-06-07T09:01:45","modified_gmt":"2022-06-07T06:01:45","slug":"primele-tramvaie-bozankaya-au-iesit-incepand-de-astazi-la-strada","status":"publish","type":"post","link":"http:\/\/infois.ro\/?p=63034","title":{"rendered":"Primele tramvaie Bozankaya au ie\u0219it, \u00eencep\u00e2nd de ast\u0103zi, la strad\u0103"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/bozankaya-la-statia-tutora.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-63035\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/bozankaya-la-statia-tutora.jpg\" alt=\"\" width=\"391\" height=\"299\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/bozankaya-la-statia-tutora.jpg 640w, http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/bozankaya-la-statia-tutora-300x230.jpg 300w\" sizes=\"(max-width: 391px) 100vw, 391px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">\u00cen prezen\u021ba primarului Mihai Chirica, luni, 6 iunie, a fost inaugurat Centrul intermodal de transport din Rond \u021au\u021bora, precum \u0219i punerea \u00een func\u021biune a primului tramvai Bozankaya, achizi\u021bionat de municipalitate prin intermediul fondurilor puse la dispozi\u021bie de Uniunea European\u0103. La eveniment au participat, de asemenea, reprezentan\u021bii Companiei de Transport Public (CTP) \u0219i cei ai companiei turce\u0219ti Bozankaya, \u00een frunte cu Emrah Dal \u2013 vicepre\u0219edinte, Yi\u011fit Belin \u2013 director de v\u00e2nz\u0103ri, \u0219i Ula\u015f Be\u015ftepe \u2013 manager de proiect.<\/p>\n<p style=\"text-align: justify;\">\u201cEste vorba despre un dublu eveniment, redeschiderea circula\u021biei tramvaielor \u00een Zona Industrial\u0103 \u0219i punerea \u00een func\u021biune a tramvaielor noi fabricate \u00een Turcia. Avem toate autoriza\u021biile necesare \u00een acest sens, vom porni mai \u00eent\u00e2i cu cinci unit\u0103\u021bi de transport, dup\u0103 care le vom introduce pe trasee \u0219i pe celelalte dou\u0103, care se afl\u0103 \u00een depoul CTP. Restul vagoanelor, p\u00e2n\u0103 la 16, urmeaz\u0103 s\u0103 fie aduse la Ia\u0219i p\u00e2n\u0103 \u00een luna mai a anului viitor. Totodat\u0103, inaugur\u0103m ast\u0103zi \u0219i noua linie de tramvai din Zona Industrial\u0103, care \u0219ti\u021bi bine c\u00e2t de distrus\u0103 era. Am reu\u0219it s\u0103 aducem la bun sf\u00e2r\u0219it investi\u021bia, care const\u0103 \u00een cale de rulare nou\u0103, \u00eenlocuire linie de contact \u0219i toate echipamentele de siguran\u021b\u0103 nou-nou\u021be. Investi\u021bia, doar pentru aceast\u0103 zon\u0103, se ridic\u0103 la 20 de milioane de euro, finan\u021barea fiind asigurat\u0103 de c\u0103tre Uniunea European\u0103\u201d, a declarat primarul Mihai Chirica.<a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/mihai-chirica-bozankaya.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-63036 alignright\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/mihai-chirica-bozankaya.jpg\" alt=\"\" width=\"390\" height=\"260\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/mihai-chirica-bozankaya.jpg 640w, http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/mihai-chirica-bozankaya-300x200.jpg 300w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">\u0218eful municipalit\u0103\u021bii a anun\u021bat c\u0103 odat\u0103 cu introducerea tramvaielor noi, unit\u0103\u021bile vechi, cu durat\u0103 mare de func\u021bionare, vor fi retrase treptat de pe trasee.<\/p>\n<p style=\"text-align: justify;\">\u201cDin analiza pe care am f\u0103cut-o cu colegii de la CTP, dup\u0103 ce toate tramvaiele noi vor ajunge la Ia\u0219i vom retrage din circula\u021bie 30 de tramvaie tip B, GT2 \u0219i GT4. \u00cen acela\u0219i timp vom urm\u0103ri \u0219i ce se va \u00eent\u00e2mpla anul viitor \u00een cadrul Planului Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR) \u0219i sunt sigur c\u0103 vom mai g\u0103si oportunit\u0103\u021bi pentru a completa parcul de tramvaie cu echipamente noi. \u00cen ceea ce prive\u0219te parcul de autobuze, sper\u0103m ca p\u00e2n\u0103 la sf\u00e2r\u0219itul lunii septembrie s\u0103 ajung\u0103 la Ia\u0219i primul lot de 20 de autobuze produse \u00een Polonia, complet electrice\u201d, a subliniat edilul.<\/p>\n<p style=\"text-align: justify;\">\u201cSuntem o fabric\u0103 cu 1.100 de angaja\u021bii \u0219i aproximativ 250 de designeri. Designul realizat pentru tramvaiele livrate municipiului Ia\u0219ului este unul specific doar acestui ora\u0219. D\u0103m o importan\u021b\u0103 foarte mare ca designul interior s\u0103 fie unul c\u00e2t mai confortabil \u0219i tocmai de aceea ne-am str\u0103duit s\u0103 \u00eendeplinim toate cerin\u021bele \u00eenscrise \u00een caietul de sarcini, ca acest lucru s\u0103 fie \u00een conformitate cu cerin\u021bele beneficiarului. Tramvaiul are o lungime de 30 de metri \u0219i un motor de genera\u021bie nou\u0103, ecologic\u201d, a precizat Emrah Dal, vicepre\u0219edinte al firmei Bozankaya.<\/p>\n<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/bozankaya-probe.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-63037\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/bozankaya-probe.jpg\" alt=\"\" width=\"391\" height=\"261\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/bozankaya-probe.jpg 640w, http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/bozankaya-probe-300x200.jpg 300w\" sizes=\"(max-width: 391px) 100vw, 391px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">\u201cTramvaiele ofer\u0103 condi\u021bii fire\u0219ti pentru secolul \u00een care ne afl\u0103m, \u00een sensul c\u0103 au podeaua joas\u0103, aer condi\u021bionat, sistem de informare a c\u0103l\u0103torilor, sistem modern de validare a biletelor de c\u0103l\u0103torie. Pentru \u00eenceput, vagoanele vor circula pe traseele 5, 7 \u0219i 8, cu men\u021biunea c\u0103 traseul 7 va fi modificat, urm\u00e2nd ca de ast\u0103zi s\u0103 circule prin Podu Ro\u0219, astfel \u00eenc\u00e2t s\u0103 acopere toate axele de deplasare at\u00e2t pentru cei care vin din afara ora\u0219ului c\u00e2t \u0219i pentru cei care ies de la serviciu de la unit\u0103\u021bile aflate \u00een Zona Industrial\u0103\u201d, a afirmat Cristian Stoica, directorul general al CTP Ia\u0219i.<\/p>\n<p style=\"text-align: justify;\">Licita\u021bia pentru achizi\u021bia celor 16 tramvaie Bozankaya a fost \u00eemp\u0103r\u021bit\u0103 \u00een trei loturi, corespunz\u0103toare a trei proiecte cu finan\u021bare european\u0103 care includ \u0219i lucr\u0103ri de modernizare a liniilor de tramvai. Valoarea total\u0103 a achizi\u021biei celor 16 tramvaie este de 140.964.270 lei, f\u0103r\u0103 TVA (167.747.481,3 lei, cu TVA), adic\u0103 circa 33,8 milioane de euro. Valoarea total\u0103 a celor trei proiecte men\u021bionate este 332.579.670,28 lei (aproximativ 67,2 milioane<\/p>\n<p style=\"text-align: justify;\">Cele 16 unit\u0103\u021bi au o lungime de circa 30 de metri \u0219i o capacitate de transport total\u0103 de aproximativ 230 de locuri. Tramvaiele au podea joas\u0103 \u0219i sunt echipate cu instala\u021bie de aer condi\u021bionat, instala\u021bie de \u00eenc\u0103lzire corespunz\u0103toare pentru sezonul rece, sistem de num\u0103rare a c\u0103l\u0103torilor, instala\u021bie audio &#8211; video \u00een interior, anun\u021buri vocale exterioare \u00een sta\u021bii, instala\u021bie pentru echipamentele de ticketing, etc.<a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/bozankaya-la-tutora-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-63039 alignright\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/bozankaya-la-tutora-1.jpg\" alt=\"\" width=\"391\" height=\"293\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/bozankaya-la-tutora-1.jpg 640w, http:\/\/infois.ro\/wp-content\/uploads\/2022\/06\/bozankaya-la-tutora-1-300x225.jpg 300w\" sizes=\"(max-width: 391px) 100vw, 391px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Lucr\u0103rile de amenajare a punctului intermodal de transport de la Rond \u021au\u021bora fac parte din proiectul \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i\u201d, cu o valoare total\u0103 de 114.359.729,95 lei, ce presupune reabilitarea infrastructurii \u0219i a suprastructurii c\u0103ii de rulare a tramvaielor pe trei tronsoane: Podu Ro\u0219 \u2013 intersec\u021bie cu bulevardul Prim\u0103verii (finalizat), Cinci Drumuri \u2013 strada P\u0103durii \u2013 strada Nicori\u021b\u0103 (finalizat) \u0219i bulevardul Virgil S\u0103hleanu \u2013 intersec\u021bie cu bulevardul Metalurgiei \u2013 rond \u021au\u021bora. Proiectul a inclus \u0219i achizi\u021bionarea a cinci tramvaie, parte a lotului de 16 vehicule Bozankaya.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">\n","protected":false},"excerpt":{"rendered":"<p>\u00cen prezen\u021ba primarului Mihai Chirica, luni, 6 iunie, a fost inaugurat Centrul intermodal de transport&#8230; <a class=\"meta-more\" href=\"http:\/\/infois.ro\/?p=63034\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":63039,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,12850,1400,40,3841,846,1625],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/63034"}],"collection":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=63034"}],"version-history":[{"count":1,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/63034\/revisions"}],"predecessor-version":[{"id":63040,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/63034\/revisions\/63040"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/63039"}],"wp:attachment":[{"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=63034"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=63034"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=63034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}