{"id":71332,"date":"2023-05-29T17:03:50","date_gmt":"2023-05-29T14:03:50","guid":{"rendered":"http:\/\/infois.ro\/?p=71332"},"modified":"2023-05-30T09:08:09","modified_gmt":"2023-05-30T06:08:09","slug":"lucrarile-la-noul-terminal-al-aeroportului-sunt-finalizate-in-proportie-de-35","status":"publish","type":"post","link":"http:\/\/infois.ro\/?p=71332","title":{"rendered":"Lucr\u0103rile la noul terminal al  Aeroportului sunt finalizate \u00een propor\u0163ie de 35%"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-71333 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-1-390x260.jpg\" alt=\"\" width=\"390\" height=\"260\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-1-390x260.jpg 390w, http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-1.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\">Stadiul de execu\u0163ie a lucr\u0103rilor la noul terminal T4 de la Aeroportul Ia\u015fi se apropie de 35%, a anun\u0163at pre\u015fedintele Consiliului Jude\u0163ean (CJ) Ia\u015fi, Costel Alexe, dup\u0103 vizita pe care a efectuat-o \u00een aceast\u0103 diminea\u0163\u0103 pe \u015fantier, \u00eempreun\u0103 cu secretarul de stat \u00een Ministerul Investi\u021biilor \u0219i Proiectelor Europene (MIPE), <a href=\"https:\/\/www.facebook.com\/profile.php?id=100063562645331&amp;__cft__%5b0%5d=AZXD4Ctp2VRryXA4LXI4PX_zGNl_DLtl26Y8AZSom3c6qte5u5GTXkjAo9gCeSS2NMFtTP60j2esnRjR6z1NA0svxCbg-F2vSE2Fn07ydDyNJIiJ70RbtwCfGl2JgLOUQ6SMvGgNPzsECXXQRrruBu7A44fqX_Ns5II_l3dBfVoQz6TZOyGZC4KjGaHPfPDpKb_dftWBfpopU8bLeK7ADvwT&amp;__tn__=-%5dK-R\">Ovidiu C\u00eempean<\/a>.<\/p>\n<p style=\"text-align: justify;\">&#8221;Totul decurge conform graficului de lucru, o veste \u00eembucur\u0103toare. \u00cen acela\u0219i timp, m\u0103 bucur enorm c\u0103 firma care a c\u00e2\u0219tigat contractul de execu\u021bie lucreaz\u0103 cu mul\u021bi subcontractori locali: \u0219apte subcontractori din Moldova, dintre care cinci sunt din Ia\u0219i. Economia local\u0103 \u0219i Ia\u0219ul au numai de c\u00e2\u0219tigat \u00een urma implement\u0103rii acestui proiect, iar aeroportul va fi unul dintre principalii piloni de dezvoltare a jude\u021bului&#8221;, a declarat pre\u0219edintele Consiliului Jude\u0163ean (CJ) Ia\u015fi, \u00a0Costel Alexe.<\/p>\n<p style=\"text-align: justify;\">Potrivit \u015fefului administra\u0163iei jude\u0163ene, lucr\u0103rile la noul terminal sunt \u00een grafic, ele urm\u00e2nd s\u0103 fie finalizate la termenul stabilit la semnarea contractului.<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-71334 alignright\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-5-390x260.jpg\" alt=\"\" width=\"390\" height=\"260\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-5-390x260.jpg 390w, http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-5.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\">Viitorul terminal va fi construit cu o amprent\u0103 la sol de peste un hectar, pe trei niveluri (subsol, parter, etaj), \u0219i va avea o suprafa\u021b\u0103 desf\u0103\u0219urat\u0103 de 31.210 mp, pe o lungime de 200 de metri \u0219i o ad\u00e2ncime de 50 de metri. T4 va fi ridicat \u00een continuarea terminalului T3, urm\u00e2nd s\u0103 fie \u00a0legat de acesta printr-o galerie. Proiectul presupune, de asemenea, reconfigurarea c\u0103ilor de acces c\u0103tre aeroport \u0219i m\u0103rirea capacit\u0103\u021bii de parcare auto la sol, de la 350 la 500 de locuri. \u00cen acela\u0219i proiect este inclus\u0103 \u0219i realizarea unui parc de panouri fotovoltaice.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">\u00cen final, terminalul va permite procesarea unui num\u0103r de 3,3 milioane de pasageri anual, dublu fa\u021b\u0103 de capacitatea actual\u0103 a aeroportului. \u00cen perioadele de v\u00e2rf, terminalul T4 va putea asigura realizarea formalit\u0103\u0163ilor pentru un num\u0103r de 950 de pasageri pe or\u0103. Vor exista \u0219apte por\u021bi pentru \u201cPlec\u0103ri\u201d \u0219i trei por\u021bi pentru \u201cSosiri\u201d, cu fluxuri bidirec\u021bionale, iar \u00eembarcarea pasagerilor se va face prin aviobridge-uri. \u00cen prim\u0103 faz\u0103, vor fi amenajate trei astfel de poduri suspendate.<\/p>\n<p style=\"text-align: justify;\">Construc\u0163ia terminalul T4 este asigurat\u0103 de SC STRABAG SRL, firm\u0103 declarat\u0103 c\u00e2\u015ftig\u0103toare a licita\u0163iei organizat\u0103 de Aeroportul Ia\u015fi, valoarea investi\u0163iei ridic\u00e2ndu-se la 328 milioane de lei, f\u0103r\u0103 TVA.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-71337\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-4-390x260.jpg\" alt=\"\" width=\"390\" height=\"260\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-4-390x260.jpg 390w, http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-4.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-71336\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-3-390x260.jpg\" alt=\"\" width=\"390\" height=\"260\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-3-390x260.jpg 390w, http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-3.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-71335 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-2-390x260.jpg\" alt=\"\" width=\"390\" height=\"260\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-2-390x260.jpg 390w, http:\/\/infois.ro\/wp-content\/uploads\/2023\/05\/terminalul-t4-35-la-suta-2.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Stadiul de execu\u0163ie a lucr\u0103rilor la noul terminal T4 de la Aeroportul Ia\u015fi se apropie&#8230; <a class=\"meta-more\" href=\"http:\/\/infois.ro\/?p=71332\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":71334,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,41],"tags":[74,1394,40,2353,15692],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/71332"}],"collection":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=71332"}],"version-history":[{"count":1,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/71332\/revisions"}],"predecessor-version":[{"id":71338,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/71332\/revisions\/71338"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/71334"}],"wp:attachment":[{"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=71332"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=71332"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=71332"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}