{"id":71454,"date":"2023-06-05T09:07:32","date_gmt":"2023-06-05T06:07:32","guid":{"rendered":"http:\/\/infois.ro\/?p=71454"},"modified":"2023-06-06T09:09:41","modified_gmt":"2023-06-06T06:09:41","slug":"lucrarile-la-esplanada-din-fata-teatrului-national-au-intrat-in-ultima-faza-a-descarcarii-arheologice","status":"publish","type":"post","link":"http:\/\/infois.ro\/?p=71454","title":{"rendered":"Lucr\u0103rile la esplanada din fa\u0163a Teatrului Na\u0163ional au intrat \u00een ultima faz\u0103 a desc\u0103rc\u0103rii arheologice"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-65185 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/09\/pe-santierul-tni-4-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/09\/pe-santierul-tni-4-300x200.jpg 300w, http:\/\/infois.ro\/wp-content\/uploads\/2022\/09\/pe-santierul-tni-4.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p style=\"text-align: justify;\">O prim\u0103 etap\u0103 important\u0103, \u00eens\u0103 absolut necesar\u0103 pentru \u00eenceperea lucr\u0103rilor de refacere \u015fi modernizare a esplanadei care face leg\u0103tura \u00eentre Teatrul Na\u0163ional &#8220;Vasile Alecsandri&#8221; \u015fi pietonalul \u015etefan cel Mare \u015fi Sf\u00e2nt, urmeaz\u0103 s\u0103 fie finalizat\u0103 \u00een aceast\u0103 lun\u0103, odat\u0103 cu eliberarea avizului de desc\u0103rcare arheologic\u0103 de c\u0103tre Ministerul Culturii. Este vorba despre lucr\u0103rile executate pe \u015fantierul deschis \u00een zona central\u0103 a ora\u015fului, \u00een fa\u0163a Teatrului Na\u0163ional, care includ refacerea \u00een totalitate a zonei.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">&#8220;Lucr\u0103rile de refacere a esplanadei din fa\u0163a Teatrului Na\u0163ional au intrat \u00een ultima faz\u0103 a desc\u0103rc\u0103rii arheologice. Practic, \u00eencep\u00e2nd de s\u0103pt\u0103m\u00e2na trecut\u0103 s-a dat startul s\u0103p\u0103turilor \u00een zona din fa\u0163a str\u0103zii Agatha B\u00e2rsescu, \u00een fa\u0163a Teatrului Na\u0163ional, de unde s-au scos deja c\u00e2teva sute de metri cubi de p\u0103m\u00e2nt. Sper\u0103m s\u0103 termin\u0103m cu s\u0103p\u0103turile \u00een aceast\u0103 s\u0103pt\u0103m\u00e2n\u0103, dup\u0103 care a\u015ftept\u0103m raportul final din partea Direc\u0163iei Jude\u0163ene de Cultur\u0103 \u00een ceea ce prive\u015fte desc\u0103rcarea arheologic\u0103. S\u0103p\u0103turile pe acest \u015fantier au \u00eenceput pe data de 3 iulie 2022, ele urm\u00e2nd s\u0103 se \u00eencheie \u00een luna iunie 2023, deci este vorba, practic, despre un an &#8211; at\u00e2t a durat etapa desc\u0103rc\u0103rii arheologice pentru acest \u015fantier. Nu ne pl\u00e2ngem, \u00eens\u0103, pentru c\u0103 suntem un ora\u015f istoric, iar astfel de vestigii se g\u0103sesc la orice pas \u00een ora\u015ful nostru&#8221;, a afirmat primarul Mihai Chirica.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">&#8220;\u00cen acest moment, valoarea estimat\u0103 a proiectului este de 14 milioane de lei. Se va reface \u00eentreaga esplanada din fa\u0163a Teatrului Na\u0163ional. Sper\u0103m s\u0103 nu avem influen\u0163e foarte mari cauzate de cre\u015fterea pre\u0163ului la materiale. Finan\u0163area investi\u0163iei este asigurat\u0103 de la bugetul local \u015fi o vom duce p\u00e2n\u0103 la cap\u0103t, astfel \u00eenc\u00e2t s\u0103 piutem reda Ia\u015fului c\u00e2t mai repede aceast\u0103 esplanad\u0103. Sper\u0103m ca iarna care va veni s\u0103 ne g\u0103seasc\u0103 \u00eentr-o oarecare finalizare a lucr\u0103rilor, cel pu\u0163in \u00een privin\u0163a lucr\u0103rilor mari, de infrastructur\u0103, refacerea f\u00e2nt\u00e2nilor arteziene sau structura amfiteatrului, pentru ca, eventual, s\u0103 ne mai r\u0103m\u00e2n\u0103 pentru anul viitor doar realizarea unor placaje sau finis\u0103ri din piatr\u0103 natural\u0103, a\u015fa cum sunt ele prev\u0103zute \u00een proiect&#8221;, a ad\u0103ugat \u015feful municipalit\u0103\u0163ii.<\/p>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-62515 alignright\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/05\/esplanada-tni-4-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/05\/esplanada-tni-4-300x168.jpg 300w, http:\/\/infois.ro\/wp-content\/uploads\/2022\/05\/esplanada-tni-4.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p style=\"text-align: justify;\">Potrivit proiectului, durata estimat\u0103 de execu\u021bie a lucr\u0103rilor este de 12 luni. \u00cen final, terenul amenajat va avea o suprafa\u021b\u0103 de 9.744 metri p\u0103tra\u021bi, din care 7.200 de metri p\u0103tra\u021bi spa\u021bii verzi. Lucr\u0103rile includ amenajarea, sistematizarea vertical\u0103 \u0219i refunc\u021bionalizarea zonei ca spa\u021biu cultural cu exploatarea c\u00e2t mai eficient\u0103 a spa\u021biului existent, p\u0103strarea compozi\u021biei existente a ansamblului cu componente de personalizare \u0219i interven\u021bii \u00een noi amenaj\u0103ri \u0219i complet\u0103ri cu elemente de mobilier urban, realizarea \u0219i montarea de elemente constructive (teatru de var\u0103 \u00een aer liber, foi\u0219or, panou pentru expozi\u021bii, f\u00e2nt\u00e2n\u0103 interactiv\u0103, f\u00e2nt\u00e2ni cu cascad\u0103, f\u00e2nt\u00e2ni de ap\u0103 potabil\u0103, graden\u0103 circular\u0103, toalete ecologice cu autocur\u0103\u021bare), amenajarea de spa\u021bii verzi, repozi\u021bionare arbori, trasee de circula\u021bii pietonale, iluminat exterior parc etc. Lucr\u0103rile vor include, de asemenea, demolarea f\u00e2nt\u00e2nilor existente \u0219i realizarea unor f\u00e2nt\u00e2ni \u0219i construc\u021bii anexe \u00een conformitate cu normele \u0219i exigen\u021bele actuale \u00een construc\u021bii. Totodat\u0103, vor fi modernizate aleile \u0219i trotuarele, iar instala\u021biile \u0219i finisajele vor fi ref\u0103cute integral.<\/p>\n<p style=\"text-align: justify;\">\n","protected":false},"excerpt":{"rendered":"<p>O prim\u0103 etap\u0103 important\u0103, \u00eens\u0103 absolut necesar\u0103 pentru \u00eenceperea lucr\u0103rilor de refacere \u015fi modernizare a&#8230; <a class=\"meta-more\" href=\"http:\/\/infois.ro\/?p=71454\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":62515,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,16253,12380,40,4782],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/71454"}],"collection":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=71454"}],"version-history":[{"count":1,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/71454\/revisions"}],"predecessor-version":[{"id":71455,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/71454\/revisions\/71455"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/62515"}],"wp:attachment":[{"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=71454"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=71454"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=71454"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}