{"id":84064,"date":"2026-07-01T17:46:57","date_gmt":"2026-07-01T14:46:57","guid":{"rendered":"https:\/\/infois.ro\/?p=84064"},"modified":"2026-07-02T07:51:21","modified_gmt":"2026-07-02T04:51:21","slug":"proiectul-trenului-metropolitan-iasi-a-fost-depus-oficial-pentru-finantare","status":"publish","type":"post","link":"http:\/\/infois.ro\/?p=84064","title":{"rendered":"Proiectul Trenului Metropolitan Ia\u0219i a fost depus oficial pentru finan\u021bare"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-84065 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2026\/07\/tren-metropolitan.jpg\" alt=\"\" width=\"640\" height=\"318\" srcset=\"http:\/\/infois.ro\/wp-content\/uploads\/2026\/07\/tren-metropolitan.jpg 640w, http:\/\/infois.ro\/wp-content\/uploads\/2026\/07\/tren-metropolitan-390x194.jpg 390w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/p>\n<p style=\"text-align: justify;\">Municipalitatea a anun\u021bat c\u0103 proiectul Trenului Metropolitan Ia\u0219i a fost depus oficial pentru finan\u021bare, dosarul urm\u00e2nd s\u0103 intre \u00een etapa de evaluare. Astfel, miercuri, 24 iunie 2026, proiectele de tren metropolitan pentru Ia\u0219i \u0219i Bucure\u0219ti au primit avizul Ministerului Transporturilor &#8211; un pas esen\u021bial pentru accesarea fondurilor europene. \u00centreaga documenta\u021bie a proiectului a fost ini\u021biat\u0103, finan\u021bat\u0103 \u0219i realizat\u0103 de Prim\u0103ria Municipiului Ia\u0219i. Studiul de fezabilitate, \u00een valoare de aproximativ 8 milioane de lei, a fost depus de Asocia\u021bia Metropolitan\u0103 de Transport Public Ia\u0219i (AMPTI) la Ministerul Transporturilor \u0219i Infrastructurii, \u00een vederea ob\u021binerii finan\u021b\u0103rii prin Programul Transporturi 2021\u20132027.<br \/>\n\u201eEste un proiect major pentru mobilitatea \u00eentregii zone metropolitane, iar \u00eempreun\u0103 cu partenerii no\u0219tri din Ministerul Transporturilor, CFR \u0219i Guvern, sunt convins\u0103 c\u0103 \u00eel vom duce la bun sf\u00e2r\u0219it. Mul\u021bumiri AMPTI \u0219i domnului director Eduard Boz pentru efort, coordonare \u0219i mobilizare!\u201d, a declarat primarul Mihai Chirica.<br \/>\nC\u00e2teva informa\u021bii esen\u021biale despre proiect<br \/>\n\u2022 Valoarea total\u0103: 1,26 miliarde lei<br \/>\n\u2022 Material rulant \u0219i echipamente: 234 milioane lei<br \/>\n\u2022 Durata de execu\u021bie: 48 luni<br \/>\n\u2022 Perioada de garan\u021bie: 60 luni<br \/>\n\u2022 Termen-limit\u0103 de implementare: 31 decembrie 2029<br \/>\nProiectul include:<br \/>\n\u2022 construirea a dou\u0103 pasaje rutiere superioare \u0219i a unui pasaj inferior pe amplasament nou,<br \/>\n\u2022 construirea a patru pasaje pietonale inferioare,<br \/>\n\u2022 \u00eenfiin\u021barea a 16 puncte de oprire noi,<br \/>\n\u2022 reabilitarea a 7 sta\u021bii existente,<br \/>\n\u2022 reabilitarea a 8 treceri la nivel, inclusiv cea de la Fortus, unde vor fi montate sisteme moderne de semnalizare; alte dou\u0103 treceri vor fi desfiin\u021bate \u0219i \u00eenlocuite cu pasaje denivelate.<br \/>\nSe va electrifica linia normal\u0103 CET Holboca \u2013 Socola, vor fi modernizate spa\u021biile pentru accesul c\u0103l\u0103torilor \u0219i vor fi ref\u0103cute zonele verzi \u0219i elementele peisagistice din proximitatea infrastructurii.<br \/>\nMaterial rulant<br \/>\n\u2022 achizi\u021bia a 4 rame electrice,<br \/>\n\u2022 amenajarea unei remize pentru garare \u0219i mentenan\u021b\u0103.<br \/>\nTraseele propuse ale Trenului Metropolitan Ia\u0219i<br \/>\n1. Podu Iloaiei \u2013 Ia\u0219i \u2013 Nicolina<br \/>\nOpriri: Podu Iloaiei, Dume\u0219ti, Banu, Le\u021bcani, Le\u021bcani 2, Parc Industrial Le\u021bcani, Parc Industrial Miroslava, Antibiotice, ERA, Canta, Gara Central\u0103, Nicolina.<br \/>\n2. Nicolina \u2013 Criste\u0219ti Jijia<br \/>\nOpriri: Frumoasa, Socola, Vl\u0103diceni, Holboca, Criste\u0219ti Jijia.<br \/>\n3. Nicolina \u2013 B\u00e2rnova<br \/>\nOpriri: Pia\u021ba Sudului, Fortus, Ciurea, Ciurea Dorului, Ciurea \u2013 Prim\u0103rie, Piciorul Lupului. Vezi mai pu\u0163ine<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Municipalitatea a anun\u021bat c\u0103 proiectul Trenului Metropolitan Ia\u0219i a fost depus oficial pentru finan\u021bare, dosarul&#8230; <a class=\"meta-more\" href=\"http:\/\/infois.ro\/?p=84064\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":84065,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,2523,40,3112,14164],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/84064"}],"collection":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=84064"}],"version-history":[{"count":1,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/84064\/revisions"}],"predecessor-version":[{"id":84066,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/84064\/revisions\/84066"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/84065"}],"wp:attachment":[{"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=84064"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=84064"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=84064"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}