{"id":12729,"date":"2014-08-17T13:51:20","date_gmt":"2014-08-17T10:51:20","guid":{"rendered":"http:\/\/infois.ro\/?p=12729"},"modified":"2014-08-17T13:51:20","modified_gmt":"2014-08-17T10:51:20","slug":"santierul-nicolae-iorga-doi-baieti-avanseaza-conform-planificarii","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=12729","title":{"rendered":"\u0218antierul Nicolae Iorga \u2013 Doi B\u0103ie\u021bi avanseaz\u0103 conform planific\u0103rii"},"content":{"rendered":"<p style=\"text-align: justify;\"><a class=\"highslide\" onclick=\"return vz.expand(this)\" href=\"http:\/\/infois.ro\/wp-content\/uploads\/2014\/08\/linii-tramvai.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-12730\" title=\"linii tramvai\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/cache\/2014\/08\/linii-tramvai\/2070912893.jpg\" alt=\"\" width=\"330\" height=\"220\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Lucr\u0103rile la \u0219antierul Nicolae Iorga \u2013 Doi B\u0103ie\u021bi, incluse \u00een proiectul care prevede modernizarea re\u0163elei de linii de tramvai \u00een polul de cre\u015ftere al municipiului Ia\u0219i, decurge conform planific\u0103rii stabilite de constructor, \u00een urm\u0103toarele dou\u0103 s\u0103pt\u0103m\u00e2ni urm\u00e2nd s\u0103 fie \u00eencheiate o serie de lucr\u0103ri aflate \u00een prezent \u00een ultima etap\u0103 \u0219i s\u0103 fie deschise altele noi. Astfel, pe \u015fantierul proiectului european de modernizare a liniilor de tramvai de pe traseul Nicolae Iorga \u2013 Doi B\u0103ie\u0163i se afl\u0103 \u00een curs de finalizare mai multe lucr\u0103ri din zona bulevardul Prim\u0103verii \u2013 Calea Chi\u015fin\u0103ului \u2013 bulevardul Metalurgiei. Astfel, dup\u0103 cum dau asigur\u0103ri reprezentan\u021bii municipalit\u0103\u021bii, \u00een aproximativ dou\u0103 s\u0103pt\u0103m\u00e2ni, c\u0103ile de rulare a tramvaielor vor fi finalizate pe bulevardul Prim\u0103verii. Tot \u00een maximum dou\u0103 s\u0103pt\u0103m\u00e2ni se estimeaz\u0103 a fi terminate \u0219i lucr\u0103rile de asfaltare de pe b-dul Metalurgiei. Pe tronsonul Calea Chi\u015fin\u0103ului \u2013 Dalkia se lucreaz\u0103 intens \u00een aceste zile la montarea schimb\u0103torilor de cale, iar peste dou\u0103 s\u0103pt\u0103m\u00e2ni va fi demarat un nou front de lucru, const\u00e2nd \u00een montarea liniilor de tramvai pe Calea Chi\u015fin\u0103ului. Proiectul \u201dModernizarea re\u0163elei de linii de tramvai \u00een polul de cre\u015ftere\u201d urmeaz\u0103 s\u0103 fie finalizat \u00een iulie 2015, acesta presupun\u00e2nd modernizarea \u015fi \u00eenlocuirea c\u0103ii de rulare a tramvaielor pe b-dul Nicolae Iorga (\u00eentre sta\u0163ia de tramvai \u201dBazar\u201d \u015fi b-dul Socola) \u2013 B-dul Prim\u0103verii (\u00eentre b-dul Socola \u015fi intersec\u0163ia cu Calea Chi\u015fin\u0103ului \u015fi str. \u0162es\u0103tura) \u2013 Calea Chi\u015fin\u0103ului (\u00eentre intersec\u0163ia dintre Calea Chi\u015fin\u0103ului cu str. \u0162es\u0103tura \u015fi b-dul Metalurgiei) \u2013 B-dul Metalurgiei (\u00eentre intersec\u0163ia cu Calea Chi\u015fin\u0103ului \u015fi strada V. Lupu) \u2013 Strada Vasile Lupu (de la intersec\u0163ia cu strada Ciurchi p\u00e2n\u0103 la b-dul Chimiei). Printre beneficiile pe care le va aduce aceast\u0103 modernizare se num\u0103r\u0103 reducerea timpului de c\u0103l\u0103torie, datorit\u0103 cre\u015fterii vitezei de circula\u0163ie a tramvaielor de la 25 km\/h la 35 km\/h pe noua infrastructur\u0103, \u00eembun\u0103t\u0103\u0163irea condi\u0163iilor de siguran\u0163\u0103 pentru c\u0103l\u0103tori prin construirea de zece peroane noi, montarea a zece \u00a0copertine pentru sta\u0163iile de tramvai, montarea de band\u0103 de cauciuc pentru ghidarea persoanelor cu dizabilit\u0103\u0163i, precum \u0219i \u00eembun\u0103t\u0103\u0163irea parametrilor de mediu prin reducerea noxelor, zgomotului \u015fi vibra\u0163iilor.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lucr\u0103rile la \u0219antierul Nicolae Iorga \u2013 Doi B\u0103ie\u021bi, incluse \u00een proiectul care prevede modernizarea re\u0163elei&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=12729\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":12730,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,3441,395,40,5423,296,3112,2849],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/12729"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12729"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/12729\/revisions"}],"predecessor-version":[{"id":12731,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/12729\/revisions\/12731"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/12730"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12729"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12729"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12729"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}