{"id":12768,"date":"2014-08-21T20:15:19","date_gmt":"2014-08-21T17:15:19","guid":{"rendered":"http:\/\/infois.ro\/?p=12768"},"modified":"2014-08-21T20:15:19","modified_gmt":"2014-08-21T17:15:19","slug":"aeroportul-international-iasi-are-cea-mai-moderna-pista-din-romania-2","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=12768","title":{"rendered":"Aeroportul Interna\u0163ional Ia\u015fi are cea mai modern\u0103 pist\u0103 din Rom\u00e2nia"},"content":{"rendered":"<p style=\"text-align: justify;\"><a class=\"highslide\" onclick=\"return vz.expand(this)\" href=\"http:\/\/infois.ro\/wp-content\/uploads\/2014\/08\/pista-aeroport-iasi1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-12769\" title=\"pista-aeroport-iasi\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/cache\/2014\/08\/pista-aeroport-iasi1\/963767568.jpg\" alt=\"\" width=\"360\" height=\"240\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Ast\u0103zi a avut loc inaugurarea noii piste a Aeroportului Interna\u0163ional Ia\u015fi. Cel mai important proiect al Jude\u0163ului Ia\u015fi a devenit realitate la doar un an dup\u0103 \u00eenceperea lucr\u0103rilor. Evenimentul a fost precedat de o scurt\u0103 slujb\u0103 religioas\u0103 \u015fi un scurt cuv\u00e2nt adresat de c\u0103tre \u00cenalt Preasfin\u0163ia Sa Tofan, Mitropolitul Moldovei \u015fi Bucovinei, \u015fi Preasfin\u0163itul Petru Gherghel Episcopul Romano-Catolic al Diecezei de Ia\u015fi. Programul a mai inclus prezentarea proiectului, aterizarea primului zbor oficial pe noua pist\u0103 (cursa TAROM Roma \u2013 Ia\u015fi), un spectacol aviatic sus\u0163inut de c\u0103tre echipa de acroba\u0163ie Hawks of Romania \u015fi c\u00e2teva momente artistice sus\u0163inute de trupa Amadeus.<\/p>\n<p style=\"text-align: justify;\">La evenimentul de ast\u0103zi au participat Ioan Rus, ministrul Transporturilor, ambasadori \u015fi membri ai corpului diplomatic, parlamentari, primari, reprezentan\u0163i ai celor mai importante firme din Regiunea de Nord-Est, reprezentan\u0163i ai b\u0103ncilor \u015fi ai agen\u0163iilor de turism, membri ai comunit\u0103\u0163ii academice \u015fi ai societ\u0103\u0163ii civile, lideri politico-administrativi etc. \u201e<em>Ast\u0103zi am inaugurat cel mai important proiect al Ia\u015fului: noua pist\u0103 de aterizare-decolare a Aeroportului Interna\u0163ional Ia\u015fi. Vechea pist\u0103 va r\u0103m\u00e2ne ca \u015fi cale de rulare, iar pista nou\u0103 va deservi \u00eentreaga zon\u0103 de Nord-Est a Rom\u00e2niei, dar \u015fi Republica Moldova \u015fi Ucraina. Aceast\u0103 realizare este cea care va permite Ia\u015fului s\u0103 se deschid\u0103 cu adev\u0103rat c\u0103tre lume \u015fi s\u0103 redevin\u0103 o adev\u0103rat\u0103 Capital\u0103. Prin acest proiect vom aduce la Ia\u015fi noi investi\u0163ii \u015fi, implicit, noi locuri de munc\u0103. Deschidem cu adev\u0103rat noi orizonturi pe care ast\u0103zi nu ni le putem imagina. To\u0163i banii pe care i-am cheltuit p\u00e2n\u0103 acum pentru construc\u0163ia pistei se vor returna foarte rapid din bugetul Comisiei Europene, Consiliul Jude\u0163ean Ia\u015fi c\u00e2\u015ftig\u00e2nd un proiect cu finan\u0163are nerambursabil\u0103 \u00een valoare total\u0103 de 56,7 milioane de euro<\/em>\u201d, a declarat Cristian Adomni\u021bei, pre\u0219edintele Consiliului Jude\u021bean Ia\u0219i.<\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 13px;\">Pre\u015fedintele Consiliului de Administra\u0163ie al Aeroportului Interna\u0163ional Ia\u015fi, Marius Bodea, a f\u0103cut o scurt\u0103 trecere \u00een revist\u0103 a proiectului \u00eenceput anul trecut. \u201e<\/span><em style=\"font-size: 13px;\">A fost volum imens de lucr\u0103ri, \u00een condi\u0163ii severe \u015fi \u00eentr-un timp foarte scurt. S-au excavat trei milioane de metri cubi de p\u0103m\u00e2nt \u015fi au fost muta\u0163i \u00eentr-un alt loc doar pentru a asigura planeitatea pistei. Am \u00eenaintat pe un teren minat, cu capturi de muni\u0163ie de r\u0103zboi neexplodat\u0103, care a b\u0103tut orice record din \u0163ar\u0103 la acest capitol. \u00cen plus, toate lucr\u0103rile s-au desf\u0103\u015furat sub trafic aerian continuu. Este o performan\u0163\u0103 pentru binele comunit\u0103\u0163ii. Tot ce s-a \u00eent\u00e2mplat aici poate fi preluat ca model de referin\u0163\u0103. Am fost contemporani poate cu cea mai mare desf\u0103\u015furare de for\u0163e de lucru \u015fi mobilizare a acestora din istoria recent\u0103 a construc\u0163iilor din Rom\u00e2nia. Fiecare metru din aceast\u0103 nou\u0103 pist\u0103 ne duce spre locul \u00een care merit\u0103m s\u0103 fim, spre punctul unde n\u0103zuin\u0163ele fire\u015fti de bun\u0103stare economic\u0103 vor deveni certitudini. Orice aeroport care a dezvoltat o infrastructur\u0103 aerian\u0103 modern\u0103 a schimbat \u00een bine \u015fi \u00een mod durabil destinul acelei comunit\u0103\u0163i<\/em><span style=\"font-size: 13px;\">\u201d, a declarat Marius Bodea.<\/span><\/p>\n<p style=\"text-align: justify;\">Lucr\u0103rile la noua pist\u0103 (flexibil\u0103) de la Aeroportul Ia\u0219i au \u00eenceput pe data de 7 august 2013. Asocierea Max Boegl Rom\u00e2nia, SC Vega &#8217;93 SRL \u0219i SC UTI Grup SA a c\u00e2\u0219tigat licita\u021bia privind execu\u021bia lucr\u0103rilor pentru realizarea suprafe\u021belor de mi\u0219care aferente unei piste noi cu lungimea de 2.400 metri. Valoarea contractului este de aproximativ 139 milioane de lei, f\u0103r\u0103 TVA. Termenul ini\u0163ial de finalizare era de 25 de luni, \u00een acest termen inclus\u0103 \u0219i proiectarea. Lucr\u0103rile includ realizarea pistei de decolare \u2013 aterizare, c\u0103ii de rulare, extinderii platformei \u0219i a drumului perimetral, instala\u021biei de balizaj, canaliz\u0103rii pentru ape pluviale, precum \u0219i a serviciilor de proiectare pentru toate cele men\u021bionate anterior.<\/p>\n<p style=\"text-align: justify;\">\u00cen luna decembrie a anului 2013 Consiliul Jude\u021bean Ia\u0219i a depus o cerere de finan\u0163are european\u0103 pentru dezvoltarea \u015fi modernizarea Aeroportului Interna\u0163ional Ia\u015fi. Proiectul are o valoare total\u0103 de 56,7 milioane de euro, obiectivele majore propuse a fi realizate fiind proiectarea \u015fi execu\u0163ia lucr\u0103rilor pentru realizarea suprafe\u0163elor de mi\u015fcare aferente unei piste noi, cu lungimea de 2.400 metri (contract aflat \u00een derulare), extinderea suplimentar\u0103 a platformei parcare aeronave \u015fi construc\u0163ia unui nou terminal de pasageri, de trei ori mai mare dec\u00e2t cel existent. \u00cen luna feburarie a acestui an, proiectul a fost declarat eligibil de c\u0103tre Autoritatea de Management a Programului Opera\u021bional Sectorial \u2013 Transport (AM POS-T). La sf\u00e2r\u015fitul lunii mai, AM POS-T a trimis la Bruxelles aplica\u0163ia Aeroportului Interna\u0163ional Ia\u015fi. La mai pu\u0163in de 24 de ore dup\u0103 ce a fost transmis\u0103 de AM POS-T la Bruxelles, Comisia European\u0103 a comunicat admisibilitatea cererii de finan\u0163are depuse pentru dezvoltarea \u015fi modernizarea Aeroportului Interna\u0163ional Ia\u015fi. S\u0103pt\u0103m\u00e2na aceasta va fi depus\u0103 \u00a0la AM POS-T prima cerere de rambursare a pl\u0103\u0163ilor deja efectuate.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ast\u0103zi a avut loc inaugurarea noii piste a Aeroportului Interna\u0163ional Ia\u015fi. Cel mai important proiect&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=12768\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":12769,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,465,5481,520,3841,5325,5480,2835],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/12768"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12768"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/12768\/revisions"}],"predecessor-version":[{"id":12770,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/12768\/revisions\/12770"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/12769"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12768"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12768"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12768"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}