{"id":15865,"date":"2015-02-11T08:40:24","date_gmt":"2015-02-11T06:40:24","guid":{"rendered":"http:\/\/infois.ro\/?p=15865"},"modified":"2015-02-11T08:40:24","modified_gmt":"2015-02-11T06:40:24","slug":"autostrada-est-vest-inclusa-in-varianta-finala-a-master-planului-general-de-transport-al-romaniei","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=15865","title":{"rendered":"Autostrada Est-Vest, inclus\u0103 \u00een varianta final\u0103 a Master Planului General de Transport al Rom\u00e2niei"},"content":{"rendered":"<p style=\"text-align: justify;\"><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2015\/02\/autostrada1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-15866\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/cache\/2015\/02\/autostrada1\/3837719884.jpg\" alt=\"autostrada\" width=\"442\" height=\"256\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Ministerul Transporturilor (MT) a dat publicit\u0103\u021bii mar\u021bi, 10 februarie, varianta revizuit\u0103 a Master Planului General de Transport al Rom\u00e2niei. Potrivit documentului, Autostrada Est &#8211; Vest (Ungheni &#8211; Ia\u0219i &#8211; Tg. Neam\u021b &#8211; Ditr\u0103u &#8211; Tg. Mure\u0219) a fost inclus\u0103 \u00een varianta final\u0103 a Master Planului. Astfel, tronsonul T\u00e2rgu Mure\u0219 &#8211; T\u00e2rgu Neam\u021b va fi construit ca autostrad\u0103 fazat\u0103 (adic\u0103, \u00een prim\u0103 faz\u0103 drum expres, \u00eembun\u0103t\u0103\u021bit ulterior la statutul de autostrad\u0103), \u00een loc de drum expres. Tronsonul T\u00e2rgu Neam\u021b &#8211; Ia\u0219i &#8211; Ungheni va fi construit ca autostrad\u0103 cu dou\u0103 benzi pe sens, \u00een loc de drum expres. Un alt drum din Moldova, respectiv Bac\u0103u \u2013 Pa\u0219cani va fi construit \u00een regim de autostrad\u0103, cu dou\u0103 benzi pe sens, \u00een loc de drum expres. Astfel, Ia\u0219ul va fi conectat at\u00e2t cu vestul \u021b\u0103rii (prin Autostrada Est &#8211; Vest), c\u00e2t \u0219i cu sudul \u021b\u0103rii (prin Autostrada Ia\u0219i &#8211; Pa\u0219cani &#8211; Bac\u0103u). \u00cen total, pentru perioada 2014-2020, Ministerul Transporturilor \u0219i-a propus realizarea a 1.301 km de autostrad\u0103, cu 645 km mai mul\u021bi dec\u00e2t \u00een varianta ini\u021biala a Mater Planului), investi\u021bia ridic\u00e2ndu-se la 26,48 miliarde euro, din care peste jum\u0103tate doar pentru autostr\u0103zi. \u00cen afar\u0103 de tronsoanele de autostrad\u0103 T\u00e2rgu Mure\u0219 &#8211; T\u00e2rgu Neam\u021b, T\u00e2rgu Neam\u021b &#8211; Ia\u0219i \u2013 Ungheni \u0219i Bac\u0103u \u2013 Pa\u0219cani, \u00een document mai figureaz\u0103 tronsonul Sibiu \u2013 Pite\u0219ti, dup\u0103 ce \u00een varianta anterioar\u0103, acesta era prev\u0103zut drept drum expres. Tot regim de autostrad\u0103 va avea \u0219i cel de-al doilea inel al centurii Capitalei, \u00een timp ce statut de drum expres vor avea segmentele Dej &#8211; Beclean \u2013 Bistri\u0219a, \u00een loc de drum regiotrans, \u00een varianta ini\u021bial\u0103 a Master Planului, Bucure\u0219ti \u2013 Alexandria (la fel) \u0219i Alexandria &#8211; Craiova\u00a0(la fel). Ca noutate, \u00een varianta revizuit\u0103 a Master Planului General de Transport apare leg\u0103tura dintre Aeroportul Interna\u021bional \u201dHenri Coanda\u201d \u0219i Autostrada 3 (Bucure\u0219ti \u2013 Ploie\u0219ti), care urmeaz\u0103 s\u0103 fie construit\u0103 ca drum expres, \u00een condi\u021biile \u00een care acest tronson nu fusese inclus \u00een prima variant\u0103 a documentului \u00eentocmit de Ministerul Transporturilor.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ministerul Transporturilor (MT) a dat publicit\u0103\u021bii mar\u021bi, 10 februarie, varianta revizuit\u0103 a Master Planului General&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=15865\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,41],"tags":[74,2755,40,3682,1648],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/15865"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15865"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/15865\/revisions"}],"predecessor-version":[{"id":15867,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/15865\/revisions\/15867"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15865"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15865"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15865"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}