{"id":17941,"date":"2015-06-05T15:37:52","date_gmt":"2015-06-05T12:37:52","guid":{"rendered":"http:\/\/infois.ro\/?p=17941"},"modified":"2015-06-05T15:37:52","modified_gmt":"2015-06-05T12:37:52","slug":"cel-mai-nou-terminal-al-aeroportului-international-iasi-va-fi-dat-in-folosinta-in-luna-august","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=17941","title":{"rendered":"Cel mai nou terminal al Aeroportului Interna\u021bional Ia\u0219i va fi dat \u00een folosin\u021b\u0103 \u00een luna august"},"content":{"rendered":"<p style=\"text-align: justify;\"><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2015\/06\/terminal-t3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-17942\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2015\/06\/terminal-t3.jpg\" alt=\"terminal-t3\" width=\"347\" height=\"231\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2015\/06\/terminal-t3.jpg 600w, https:\/\/infois.ro\/wp-content\/uploads\/2015\/06\/terminal-t3-300x200.jpg 300w\" sizes=\"(max-width: 347px) 100vw, 347px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Graficul lucr\u0103rilor la \u0219antierul deschis la Aeroportul Interna\u021bional Ia\u0219i privind construc\u021bia celui de-al treilea terminal respect\u0103 programarea convenit\u0103 ini\u021bial \u00eentre autoritatea contractant\u0103, respectiv Consiliul Jude\u021bean (CJ) Ia\u0219i) \u0219i constructor. Aceasta este concluzia la care au ajuns consilierii jude\u021beni ie\u0219eni, care au efectuat vineri, 5 iunie, o vizit\u0103 la lucru la \u0219antierul de la Aeroport. \u201dConcluzia general\u0103 a fost c\u0103 lucr\u0103rile evolueaz\u0103 foarte bine \u0219i c\u0103, de\u0219i \u00een luna martie au fost trei s\u0103pt\u0103m\u00e2ni de precipita\u021bii care au f\u0103cut foarte dificile lucr\u0103rile de terasament \u0219i funda\u021bii, graficul este respectat\u201d, a declarat pre\u0219edintele interimar al CJ Ia\u0219i, Victorel Lupu. Potrivit acestuia, terminalul 3 al Aeroportului Interna\u021bional Ia\u0219i va fi dat spre folosin\u0163\u0103 \u00een luna august 2015, dup\u0103 ce lucrarea va fi predat\u0103 de c\u0103tre constructor \u0219i dup\u0103 ce noul terminal va primi acredit\u0103rile specifice. Reamintim faptul c\u0103, \u00een urma licita\u021biei organizate de CJ Ia\u0219i, firma care execut\u0103 lucr\u0103rile de construc\u021bie a noului terminal de la Aeroportul Interna\u021bional Ia\u0219i este SC UTI GRUP SA Bucure\u015fti, contractul pentru acest obiectiv av\u00e2nd valoarea de 8,1 milioane de euro, inclusiv TVA. Potrivit reprezentan\u021bilor Consiliului Jude\u021bean Ia\u0219i, lucr\u0103rile de terasamente \u0219i infrastructur\u0103\/rezisten\u021b\u0103 sunt executate \u00een prezent \u00een propor\u021bie de 90%. Pentru acestea s-au excavat aproximativ 12.000 metri cubi de p\u0103m\u00e2nt. Lucr\u0103rile de suprastructur\u0103\/hala metalic\u0103 sunt executate \u00een propor\u021bie de 90%, iar materialele pentru finalizare sunt \u00een \u0219antier. Lucr\u0103rile la acoperi\u0219 s-au finalizat \u00een propor\u021bie de 90%. \u00cencep\u00e2nd din aceast\u0103 lun\u0103 se va lucra pentru montajul instala\u021biilor \u0219i sistemelor la interior \u0219i exterior. Prin acest proiect, Aeroportul Interna\u021bional Ia\u015fi \u00ee\u015fi consolideaz\u0103 pozi\u0163ia \u015fi imaginea de aeroport regional principal al Moldovei \u015fi confirm\u0103 misiunea de\u00a0 deschidere a economic\u0103 a jude\u0163elor din Regiunea de Nord-Est.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Graficul lucr\u0103rilor la \u0219antierul deschis la Aeroportul Interna\u021bional Ia\u0219i privind construc\u021bia celui de-al treilea terminal&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=17941\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":17942,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,465,6313,40,2936,4974],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/17941"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17941"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/17941\/revisions"}],"predecessor-version":[{"id":17943,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/17941\/revisions\/17943"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/17942"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17941"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17941"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}