{"id":19324,"date":"2015-09-09T09:00:05","date_gmt":"2015-09-09T06:00:05","guid":{"rendered":"http:\/\/infois.ro\/?p=19324"},"modified":"2015-09-09T09:00:05","modified_gmt":"2015-09-09T06:00:05","slug":"licitatia-pentru-realizarea-studiului-de-fezabilitate-privind-constructia-autostrazii-est-vest-a-fost-anulata","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=19324","title":{"rendered":"Licita\u021bia pentru realizarea studiului de fezabilitate privind construc\u021bia autostr\u0103zii Est-Vest a fost anulat\u0103"},"content":{"rendered":"<p style=\"text-align: justify;\"><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2015\/09\/autostrada.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-19325\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2015\/09\/autostrada.jpg\" alt=\"autostrada\" width=\"296\" height=\"190\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2015\/09\/autostrada.jpg 600w, https:\/\/infois.ro\/wp-content\/uploads\/2015\/09\/autostrada-300x192.jpg 300w, https:\/\/infois.ro\/wp-content\/uploads\/2015\/09\/autostrada-470x300.jpg 470w\" sizes=\"(max-width: 296px) 100vw, 296px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Ie\u0219enii vor mai avea de a\u0219teptat p\u00e2n\u0103 c\u00e2nd autostrada care urmeaz\u0103 s\u0103 lege Estul de Vestul \u021b\u0103rii va prinde contur, m\u0103car \u0219i pe h\u00e2rtie. Aflat, mar\u021bi, la Ia\u0219i, ministrul Transporturilor, Iulian Matache, a confirmat faptul c\u0103 licita\u021bia pentru realizarea studiului de fezabilitate privind construc\u021bia autostr\u0103zii Ia\u0219i \u2013 T\u00e2rgu Mure\u0219 a fost anulat\u0103, din cauz\u0103 c\u0103 firmele \u00eenscrise la concurs nu au respectat o serie de condi\u021bii absolut obligatorii. \u201d\u00cen ciuda acestui lucru vreau s\u0103 v\u0103 asigur c\u0103 autostrada Est-Vest, investi\u021bie major\u0103 prev\u0103zut\u0103 \u00een Master Planul General de Transport al Rom\u00e2niei, se va realiza\u201d, a spus oficialul guvernamental. Av\u00e2nd \u00een vedere anularea licita\u021biei privind realizarea studiului de fezabilitate pentru construc\u021bia autostr\u0103zii, Iulian Matache nu a putut oferi o dat\u0103 cert\u0103 la care ar putea \u00eencepe lucr\u0103rile la aceast\u0103 investi\u021bie. Ministerul Transporturilor (MT) a dat publicit\u0103\u021bii \u00een luna februarie a acestui an, varianta revizuit\u0103 a Master Planului General de Transport al Rom\u00e2niei, \u00een care a fost inclus\u0103 \u0219i Autostrada Est \u2013 Vest (Ungheni \u2013 Ia\u0219i \u2013 Tg. Neam\u021b \u2013 Ditr\u0103u \u2013 Tg. Mure\u0219). Potrivit documentului, tronsonul T\u00e2rgu Mure\u0219 \u2013 T\u00e2rgu Neam\u021b ar urma s\u0103 fie construit ca autostrad\u0103 fazat\u0103 (adic\u0103, \u00een prim\u0103 faz\u0103 drum expres, \u00eembun\u0103t\u0103\u021bit ulterior p\u00e2n\u0103 la statutul de autostrad\u0103), \u00een loc de drum expres, \u00een timp ce tronsonul T\u00e2rgu Neam\u021b \u2013 Ia\u0219i \u2013 Ungheni va fi construit ca autostrad\u0103 cu dou\u0103 benzi pe sens, \u00een loc de drum expres, a\u0219a cum era prev\u0103zut \u00een varianta ini\u021bial\u0103 a Master Planului. Un alt drum din Moldova, respectiv Bac\u0103u \u2013 Pa\u0219cani va fi construit \u00een regim de autostrad\u0103, cu dou\u0103 benzi pe sens, \u00een loc de drum expres. Astfel, Ia\u0219ul va fi conectat at\u00e2t cu vestul \u021b\u0103rii (prin Autostrada Est \u2013 Vest), c\u00e2t \u0219i cu sudul \u021b\u0103rii (prin Autostrada Ia\u0219i \u2013 Pa\u0219cani \u2013 Bac\u0103u). \u00cen total, pentru perioada 2014-2020, Ministerul Transporturilor \u0219i-a propus realizarea a 1.301 km de autostrad\u0103, cu 645 km mai mul\u021bi dec\u00e2t \u00een varianta ini\u021biala a Mater Planului), investi\u021bia ridic\u00e2ndu-se la 26,48 miliarde euro, din care peste jum\u0103tate doar pentru autostr\u0103zi. \u00cen afar\u0103 de tronsoanele de autostrad\u0103 T\u00e2rgu Mure\u0219 \u2013 T\u00e2rgu Neam\u021b, T\u00e2rgu Neam\u021b \u2013 Ia\u0219i \u2013 Ungheni \u0219i Bac\u0103u \u2013 Pa\u0219cani, \u00een document mai figureaz\u0103 tronsonul Sibiu \u2013 Pite\u0219ti, dup\u0103 ce \u00een varianta anterioar\u0103, acesta era prev\u0103zut drept drum expres. Tot regim de autostrad\u0103 va avea \u0219i cel de-al doilea inel al centurii Capitalei, \u00een timp ce statut de drum expres vor avea segmentele Dej \u2013 Beclean \u2013 Bistri\u0219a, \u00een loc de drum regiotrans, \u00een varianta ini\u021bial\u0103 a Master Planului, Bucure\u0219ti \u2013 Alexandria (la fel) \u0219i Alexandria \u2013 Craiova\u00a0(la fel). Ca noutate, \u00een varianta revizuit\u0103 a Master Planului General de Transport apare leg\u0103tura dintre Aeroportul Interna\u021bional \u201dHenri Coanda\u201d \u0219i Autostrada 3 (Bucure\u0219ti \u2013 Ploie\u0219ti), care urmeaz\u0103 s\u0103 fie construit\u0103 ca drum expres, \u00een condi\u021biile \u00een care acest tronson nu fusese inclus \u00een prima variant\u0103 a documentului \u00eentocmit de Ministerul Transporturilor.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ie\u0219enii vor mai avea de a\u0219teptat p\u00e2n\u0103 c\u00e2nd autostrada care urmeaz\u0103 s\u0103 lege Estul de&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=19324\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":19325,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,41],"tags":[74,2755,40,846,3907,1648],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/19324"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=19324"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/19324\/revisions"}],"predecessor-version":[{"id":19326,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/19324\/revisions\/19326"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/19325"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=19324"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=19324"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=19324"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}