{"id":27235,"date":"2017-02-03T05:50:53","date_gmt":"2017-02-03T03:50:53","guid":{"rendered":"http:\/\/infois.ro\/?p=27235"},"modified":"2017-02-03T05:50:53","modified_gmt":"2017-02-03T03:50:53","slug":"o-noua-investitie-majora-va-debuta-in-acest-an-la-iasi","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=27235","title":{"rendered":"O nou\u0103 investi\u0163ie major\u0103 va debuta \u00een acest an la Ia\u015fi"},"content":{"rendered":"<p style=\"text-align: justify;\"><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2015\/08\/bahlui1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-18972\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2015\/08\/bahlui1.jpg\" alt=\"\" width=\"286\" height=\"179\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2015\/08\/bahlui1.jpg 600w, https:\/\/infois.ro\/wp-content\/uploads\/2015\/08\/bahlui1-300x187.jpg 300w\" sizes=\"(max-width: 286px) 100vw, 286px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Primarul Mihai Chirica a anun\u0163at joi c\u0103 municipalitatea a finalizat contractul privind \u00eenceperea lucr\u0103rilor de reabilitare \u015fi modernizare a Splai Drept Mal Bahlui, proiect inclus \u00een Axa prioritar\u0103 1 din cadrul Programului Opera\u021bional Regional (POR) al Uniunii Europene. Potrivit edilului, lucr\u0103rile urmeaz\u0103 s\u0103 fie demarate \u00een cursul acestui an. Este vorba despre un proiect \u00een valoare de 25 de milioane de lei, care prevede reabilitarea infrastructurii rutiere \u00een zona industrial\u0103 a municipiului Ia\u0219i \u2013 mal drept Bahlui, respectiv reabilitarea str\u0103zilor, trotuarelor, construc\u0163ia unei piste pentru bicicli\u0219ti \u0219i asigurarea canaliz\u0103rii pentru cablurile electrice, toate cuprinse pe tronsonul Podu de Piatr\u0103 \u2013 Podul \u201dSf. Ioan\u201d, a afirmat primarul. Str\u0103zile care urmeaz\u0103 s\u0103 fie modernizate prin intermediul acestui proeict sunt grupate \u00een mai multe tronsoane, astfel: tronsonul I: \u0218oseaua Na\u021bional\u0103 \u2013 \u00a0Pod Podu Ro\u0219, \u00een locul c\u0103ii ferate a tramvaiului \u2013 se desf\u0103\u0219oar\u0103 paralel cu strada \u0218oseaua Na\u021bional\u0103, pe sectorul cuprins \u00eentre km 0+243,51 \u0219i intersec\u021bia Podu Ro\u0219 \u0219i \u00eenlocuie\u0219te traseul liniei de tramvai existent pe acest traseu. Vor fi amenajate 86 de locuri de parcare \u0219i opt locuri pentru persoanele cu dizabilit\u0103\u021bi. Strada nou\u0103 va avea sens unic de circula\u021bie, \u00eenspre sensul giratoriu din Podu Ro\u0219. Se va amenaja, de asemenea, o sta\u021bie de autobuz cu alveol\u0103; tronsonul II: Podu Ro\u0219 \u2013 Pod Tudor Vladimirescu \u2013 se desf\u0103\u0219oar\u0103 doar \u00eentr-un singur sens, av\u00e2nd direc\u021bia dinspre Podu Ro\u0219 spre Tudor Vladimirescu; tronsonul III: Pod Tudor Vladimirescu \u2013 Pod Metalurgie, \u00een lungul Bulevardului Chimiei); tronsonul IV: Pod Pod Metalurgie \u2013 Pod \u201dSf. Ioan\u201d, \u00een lungul Bulevardului Chimiei &#8211; lucr\u0103ri de ramforsare a p\u0103r\u021bii carosabile, refacerea trotuarelor \u0219i execu\u021bia unor canaliza\u021bii pentru montarea unor cabluri \u00een subteran, pe ambele p\u0103r\u021bi ale str\u0103zii: tronsonul V: Strada \u0218oseaua Na\u021bional\u0103, \u00een lungul str\u0103zii \u0218oseaua Na\u021bional\u0103. Tot joi, primarul Mihai Chirica a anun\u0163at c\u0103 recent a fost finalizat\u0103 licita\u0163ia privind achizi\u0163ia a zece noi copertine pentru peroanele sta\u021biilor de transport public din municipiu, c\u00e2\u0219tig\u0103toarea licita\u021biei fiind SC Grafis Art SRL, iar valoarea ofertei de 168.430 lei. &#8220;Vom monta un set de zece buc\u0103\u021bi, care vor elimina o parte din deficien\u021bele care au fost constatate de c\u0103tre c\u0103l\u0103tori, cu privire \u00een special la protec\u021bia lor \u00een sta\u021biile de transport \u00een comun. Urmeaz\u0103 ca \u00een scurt timp s\u0103 semn\u0103m contratul\u201d, a declarat edilul.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Primarul Mihai Chirica a anun\u0163at joi c\u0103 municipalitatea a finalizat contractul privind \u00eenceperea lucr\u0103rilor de&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=27235\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":18972,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,9041,40,1583,477,9040],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/27235"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=27235"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/27235\/revisions"}],"predecessor-version":[{"id":27236,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/27235\/revisions\/27236"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/18972"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=27235"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=27235"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=27235"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}