{"id":36146,"date":"2018-08-10T06:36:20","date_gmt":"2018-08-10T03:36:20","guid":{"rendered":"http:\/\/infois.ro\/?p=36146"},"modified":"2018-08-10T06:36:20","modified_gmt":"2018-08-10T03:36:20","slug":"reabilitarea-caii-de-rulare-a-tramvaielor-din-municipiu-realizata-cu-fonduri-europene-nerambursabile","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=36146","title":{"rendered":"Reabilitarea c\u0103ii de rulare a tramvaielor din municipiu, realizat\u0103 cu fonduri europene nerambursabile"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2015\/04\/linii-tramvai.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-17020\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2015\/04\/linii-tramvai.jpg\" alt=\"\" width=\"332\" height=\"252\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2015\/04\/linii-tramvai.jpg 600w, https:\/\/infois.ro\/wp-content\/uploads\/2015\/04\/linii-tramvai-300x228.jpg 300w\" sizes=\"(max-width: 332px) 100vw, 332px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Trei din cele cinci proiecte preg\u0103tite de Prim\u0103rie pentru a fi finan\u021bate cu fonduri europene nerambursabile prin Programul Opera\u0163ional Regional (POR) 2014 \u2013 2020 \u00een cadrul Axei prioritar\u0103 4 \u201eSprijinirea dezvolt\u0103rii urbane durabile\u201d &#8211; Prioritatea de investi\u021bii 4e &#8211; \u201ePromovarea unor strategii cu emisii sc\u0103zute de dioxid de carbon pentru toate tipurile de teritorii, \u00een special pentru zonele urbane, inclusiv promovarea mobilit\u0103\u021bii urbane multimodale durabile \u0219i a m\u0103surilor de adaptare relevante pentru atenuare\u201d &#8211; Obiectivul specific 4.1 \u201eReducerea emisiilor de carbon \u00een municipiile re\u0219edin\u021b\u0103 de jude\u021b prin investi\u021bii bazate pe planurile de mobilitate urban\u0103 durabil\u0103&#8221;, vor fi supuse spre aprobare vineri, \u00een \u015fedin\u0163a extraordinar\u0103 a Consiliului Local. Este vorba despre trei proiecte de hot\u0103r\u00e2re privind aprobarea documenta\u021biei de autorizare a lucr\u0103rilor de interven\u021bie, a indicatorilor tehnico &#8211; economici \u0219i a proiectelor tehnice de execu\u021bie, precum \u0219i aprobarea proiectelor \u0219i a bugetelor aferente proiectelor privind \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i\u201d (care include trei tronsoane de cale de rulare din diverse zone ale ora\u0219ului), \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i \u2013 Reorganizarea circula\u021biei pe bulevardul Tudor Vladimirescu\u201d \u0219i \u201eSistem alternativ de mobilitate urban\u0103 utiliz\u00e2nd sta\u021bii de \u00eenchiriere a bicicletelor &#8211; Ia\u0219i VeloCity\u201d. La acestea, pe Axa 4.1 se adaug\u0103 alte dou\u0103 proiecte care sunt \u00een preg\u0103tire \u015fi anume \u201eReabilitarea infrastructurii de tramvai Ia\u0219i &#8211; Dancu (Doi B\u0103ie\u021bi &#8211; strada Aurel Vlaicu &#8211; limit\u0103 Municipiul Ia\u0219i)\u201d (estimat la 8.673.469,39 euro) \u0219i \u201eSistem e-ticketing pentru \u00eembun\u0103t\u0103\u021birea mobilit\u0103\u021bii \u00een Zona Metropolitan\u0103 Ia\u0219i\u201d (estimat la 1.632.653,06 euro), acestea fiind \u00een prezent \u00een etapa realiz\u0103rii proiectelor tehnice. Potrivit primarului Mihai Chirica, prin intermediul Programului Opera\u021bional Regional (POR) &#8211; Axa 4, destinat\u0103 mobilit\u0103\u021bii urbane, Municipiul Ia\u0219i beneficiaz\u0103 de o sum\u0103 total\u0103 rezervat\u0103 de 58,3 milioane de euro, sum\u0103 care va constitui una dintre sursele principale de dezvoltare ale ora\u015fului \u00een urm\u0103torii ani. Proiectele vor fi depuse spre evaluare \u00eencep\u00e2nd din luna august. Proiectul \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i\u201d presupune reabilitarea infrastructurii \u0219i suprastructurii c\u0103ii de rulare tramvai pe trei tronsoane, astfel: * \u201eCinci Drumuri &#8211; strada P\u0103durii &#8211; strada Nicori\u021b\u0103\u201d: Prevede efectuarea de lucr\u0103ri de construc\u021bii \u0219i instala\u021bii aferente liniei de tramvai Cinci Drumuri &#8211; strada P\u0103durii &#8211; strada Nicori\u021b\u0103 (lungime: 1.334,60 metri), realizarea elementelor componente necesare func\u021bion\u0103rii c\u0103ii de rulare tramvai, construirea a dou\u0103 sta\u021bii de transport public, reabilitarea str\u0103zii P\u0103durii (lungime carosabil: 325 metri), precum \u0219i reabilitarea de trotuare pe lungimea liniei de tramvai (suprafa\u021b\u0103: 1.864 metri p\u0103tra\u021bi); * \u201ePia\u021ba Podu Ro\u0219 &#8211; Intersec\u021bie cu bulevardul Prim\u0103verii\u201d: Include efectuarea de lucr\u0103ri de construc\u021bii \u0219i instala\u021bii aferente liniei de tramvai Pia\u021ba Podu Ro\u0219 &#8211; intersec\u021bie cu Bulevardul Prim\u0103verii (lungime: 914 metri de linie simpl\u0103), realizarea elementelor componente necesare func\u021bion\u0103rii c\u0103ii de rulare tramvai, reabilitarea a dou\u0103 peroane ale sta\u021biilor de transport public, construirea a dou\u0103 sta\u021bii de transport public, reabilitarea trotuarelor pe lungimea liniei de tramvai (suprafa\u021b\u0103: 3.320 metri p\u0103tra\u021bi), construirea de piste pentru biciclete pe lungimea trotuarelor (lungime: 914 metri), precum \u0219i reabilitarea spa\u021biului verde (suprafa\u021b\u0103: 899 metri p\u0103tra\u021bi); * \u201eBulevardul Virgil S\u0103hleanu \u2013 Intersec\u021bie cu bulevardul Metalurgiei &#8211; rond \u021au\u021bora\u201d: Prevede realizarea de lucr\u0103ri de construc\u021bii \u0219i instala\u021bii aferente liniei de tramvai cuprins\u0103 \u00eentre bulevardul Metalurgiei \u0219i rond \u021au\u021bora (cap\u0103t zona industrial\u0103) (lungime: 3.472 metri de linie simpl\u0103) \u0219i bucla de \u00eentoarcere (lungime: 210 metri de cale simpl\u0103 de rulare), realizarea elementelor componente necesare func\u021bion\u0103rii c\u0103ii de rulare tramvai, reabilitarea a \u0219ase peroane, construirea a \u0219ase sta\u021bii de transport public, reabilitarea de spa\u021bii verzi (suprafa\u021b\u0103: 5.180 metri p\u0103tra\u021bi), construirea unei sta\u021bii de transfer intermodal\u0103 (lungime: 60,90 metri, l\u0103\u021bime: 22,20 metri, \u00een\u0103l\u021bime: 8,25 metri de la nivelul solului), precum \u0219i achizi\u021bionarea a cinci tramvaie. Valoarea total\u0103 a proiectului este de 114.284.517,70 lei, inclusiv TVA, din care lucr\u0103rile de construc\u021bii &#8211; montaj reprezint\u0103 44.293.234,39 lei, inclusiv TVA. Durata de implementare a proiectului este de 36 de luni, din care 24 de luni durata de execu\u021bie a lucr\u0103rilor. Investi\u021bia va fi e\u0219alonat\u0103 pe trei ani: anul I &#8211; 48.979.079,02 lei, f\u0103r\u0103 TVA, anul II &#8211; 48.979.079,02 lei, f\u0103r\u0103 TVA, iar anul III &#8211; 16.326.359,66 lei, f\u0103r\u0103 TVA. Proiectul \u201eReabilitarea infrastructurii de tramvai \u00een municipiul Ia\u0219i &#8211; Reorganizarea circula\u021biei pe bulevardul Tudor Vladimirescu\u201d presupune reabilitarea infrastructurii \u0219i suprastructurii c\u0103ii de rulare tramvai pe tronsonul cuprins \u00eentre intersec\u021bie Buc\u0219inescu &#8211; bulevardul Tudor Vladimirescu &#8211; intersec\u021bie Calea Chi\u0219in\u0103ului. Lucr\u0103rile de reabilitare a tronsonului liniei de tramvai cuprind urm\u0103toarele activit\u0103\u021bi: execu\u021bia lucr\u0103rilor de construc\u021bii \u0219i instala\u021bii aferente liniei de tramvai intersec\u021bie Buc\u0219inescu &#8211; bulevardul Tudor Vladimirescu &#8211; intersec\u021bie Calea Chi\u0219in\u0103ului (lungime: 2.410 metri &#8211; cale simpl\u0103 de rulare), reabilitarea celor dou\u0103 peroane din sta\u021bia Tudor Vladimirescu, reabilitarea podului Tudor Vladimirescu (suprafa\u021b\u0103: 1.196 metri p\u0103tra\u021bi), construirea a dou\u0103 sta\u021bii de tramvai, precum \u0219i achizi\u021bionare a a \u0219apte tramvaie. &#8220;Lucr\u0103rile pe acest tronson vizeaz\u0103 ridicarea la cot\u0103 a liniei de tramvai \u2013 \u015fti\u0163i c\u0103 este sub cota drumului na\u0163ional -, repara\u0163ia \u015fi \u00eenfiin\u0163area de peroane noi, reabilitarea podului Tudor Vladimirescu, o lucrare foarte important\u0103. De altfel, podul a fost expertizat \u015fi necesit\u0103 interven\u0163ie rapid\u0103\u201d, a declarat primarul Mihai Chirica, ast\u0103zi, \u00eentr-o conferin\u0163\u0103 de pres\u0103. Valoarea total\u0103 a proiectului este de 113.742.261,72 lei, inclusiv TVA, din care lucr\u0103rile de construc\u021bii &#8211; montaj reprezint\u0103 34.144.878,20 lei, inclusiv TVA. Durata de implementare a proiectului este de 24 de luni, din care 18 de luni durata de execu\u021bie a lucr\u0103rilor. Investi\u021bia va fi e\u0219alonat\u0103 pe doi ani: anul I &#8211; 75.828.174,47 lei, inclusiv TVA, iar anul II &#8211; 37.914.087,25 lei, inclusiv TVA.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Trei din cele cinci proiecte preg\u0103tite de Prim\u0103rie pentru a fi finan\u021bate cu fonduri europene&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=36146\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":17020,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,11073,9195,2681,40,3112],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/36146"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=36146"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/36146\/revisions"}],"predecessor-version":[{"id":36147,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/36146\/revisions\/36147"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/17020"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=36146"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=36146"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=36146"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}