{"id":37082,"date":"2018-10-07T08:47:17","date_gmt":"2018-10-07T05:47:17","guid":{"rendered":"http:\/\/infois.ro\/?p=37082"},"modified":"2018-10-08T08:54:00","modified_gmt":"2018-10-08T05:54:00","slug":"continua-lucrarile-de-modernizare-a-soselei-nationale","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=37082","title":{"rendered":"Continu\u0103 lucr\u0103rile de modernizare a \u015eoselei Na\u0163ionale"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2018\/10\/lucrari-soseaua-nationala.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-37083\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2018\/10\/lucrari-soseaua-nationala.jpg\" alt=\"\" width=\"291\" height=\"194\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2018\/10\/lucrari-soseaua-nationala.jpg 640w, https:\/\/infois.ro\/wp-content\/uploads\/2018\/10\/lucrari-soseaua-nationala-300x200.jpg 300w\" sizes=\"(max-width: 291px) 100vw, 291px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Echipele Viarom Construct SRL vor relua s\u0103pt\u0103m\u00e2na viitoare lucr\u0103rile de modernizare a \u015eoselei Na\u021bionale, pe tronsonul cuprins \u00eentre Podu Ro\u0219 \u0219i sp\u0103l\u0103toria auto K9. Lucr\u0103rile fac parte din proiectul de modernizare a zonei Splai Bahlui \u2013 Mal Drept, fiind executate de asocierea Viarom Construct SRL \u2013 Conest SA. Valoarea total\u0103 a proiectului este de aproximativ 30,7 milioane de lei. Investi\u021bia vizeaz\u0103 aproximativ \u015fase kilometri de artere, fiind prev\u0103zut\u0103 reabilitarea carosabilului pe traseul dintre Podul de Piatr\u0103 \u015fi podul Sf\u00e2ntul Ioan, dar \u015fi refacerea \u015eoselei Na\u0163ionale, pe sectorul dintre Podu Ro\u015f \u015fi Podul de Piatr\u0103. \u00cen alt\u0103 ordine de idei, potrivit reprezentan\u0163ilor Prim\u0103riei, echipele Conest SA se apropie de finalizarea lucr\u0103rilor de modernizare a re\u021belei de termoficare din Podu Ro\u0219. \u00cen cadrul proiectului de reabilitare a sistemului de termoficare \u00een municipiul Ia\u015fi sunt incluse dou\u0103 contracte de lucr\u0103ri: cel privind reabilitarea re\u0163elei de termoficare primare (de transport) \u015fi cel privind reabilitarea re\u0163elei de termoficare secundare (de distribu\u0163ie). Valoarea total\u0103 a celor dou\u0103 contracte este de aproximativ 68 milioane de lei, f\u0103r\u0103 TVA, c\u00e2\u0219tig\u0103toarea licita\u021biei fiind asocierea SC Conest SA \u2013 SC Construc\u021bii Erba\u0219u SA \u2013 SC Consix Construc\u021bii SRL \u2013 SC IPCT Instala\u021bii SRL. Primul proiect are termen de finalizare data de 30 iunie 2019, iar cel de-al doilea \u2013 30 august 2019. \u00cen total este vizat un traseu de 25,6 de kilometri (76,2 kilometri de conducte). Proiectul \u201eReabilitarea sistemului de termoficare \u00een Municipiul Ia\u0219i, \u00een vederea conform\u0103rii cu stardardele de mediu privind emisiile poluante \u00een atmosfer\u0103 \u0219i pentru cre\u0219terea eficien\u021bei energetice \u00een alimentarea cu c\u0103ldur\u0103 urban\u0103\u201d este confinan\u021bat \u00een propor\u021bie de 85% din fonduri europene, 13% din fonduri de la bugetul de stat \u0219i 2% din fonduri de la bugetul local al Municipiului Ia\u0219i.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Echipele Viarom Construct SRL vor relua s\u0103pt\u0103m\u00e2na viitoare lucr\u0103rile de modernizare a \u015eoselei Na\u021bionale, pe&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=37082\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":37083,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,2124,40,3553,3112,11287,11288],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/37082"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=37082"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/37082\/revisions"}],"predecessor-version":[{"id":37084,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/37082\/revisions\/37084"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/37083"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=37082"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=37082"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=37082"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}