{"id":37348,"date":"2018-10-22T14:23:27","date_gmt":"2018-10-22T11:23:27","guid":{"rendered":"http:\/\/infois.ro\/?p=37348"},"modified":"2018-10-22T14:23:27","modified_gmt":"2018-10-22T11:23:27","slug":"municipalitatea-alaturi-de-locuitorii-din-zona-soselei-barnova","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=37348","title":{"rendered":"Municipalitatea, al\u0103turi de locuitorii din zona \u0219oselei B\u00e2rnova"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2018\/10\/sos-iasi-barnova.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-37349\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2018\/10\/sos-iasi-barnova.jpg\" alt=\"\" width=\"294\" height=\"392\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2018\/10\/sos-iasi-barnova.jpg 640w, https:\/\/infois.ro\/wp-content\/uploads\/2018\/10\/sos-iasi-barnova-225x300.jpg 225w\" sizes=\"(max-width: 294px) 100vw, 294px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Reprezentan\u021bii Prim\u0103riei Municipiului Ia\u0219i, \u00een frunte cu viceprimarul Radu Botez, au avut \u00een aceast\u0103 diminea\u021b\u0103, \u00een Sala \u201eVasile Pogor\u201d, o \u00eent\u00e2lnire cu un grup de locuitori revolta\u021bi din zona \u0219oselei Ia\u0219i &#8211; B\u00e2rnova. Cet\u0103\u021benii au organizat un protest \u00eempotriva ritmului lent al lucr\u0103rilor pe care DelGaz Grid SA le execut\u0103 pe aceast\u0103 arter\u0103, \u00een lipsa finaliz\u0103rii acestora municipalitatea afl\u00e2ndu-se \u00een imposibilitatea de a \u00eencepe modernizarea \u0219oselei. Ca \u0219i \u00een alte ocazii, reprezentan\u021bii municipalit\u0103\u021bii au \u00eencercat s\u0103 explice contextul care a generat aceast\u0103 situa\u021bie, care provoac\u0103 nemul\u021bumirea justificat\u0103 a cet\u0103\u021benilor. Astfel, \u00een urma unei licita\u021bii, pe 21 august 2017, municipalitatea a semnat cu asocierea Viarom Construct SRL &#8211; Conest SA un contract de modernizare a \u0219oselei B\u00e2rnova. Pe 25 august 2017 a fost emis \u0219i ordinul de \u00eencepere a lucr\u0103rilor, acestea av\u00e2nd ca termen de finalizare luna august a anului 2019. Municipalitatea a notificat furnizorii de utilit\u0103\u021bi (ApaVital SA pentru ap\u0103 \u0219i canalizare, respectiv DelGaz Grid SA pentru electricitate \u0219i gaz) s\u0103 \u00ee\u0219i finalizeze propriile investi\u021bii \u0219i lucr\u0103ri care afecteaz\u0103 calea rutier\u0103. Este de subliniat faptul c\u0103 modernizarea \u0219oselei nu poate \u00eencepe dec\u00e2t dup\u0103 ce toate interven\u021biile la re\u021belele de utilit\u0103\u021bi sunt \u00eencheiate, cu at\u00e2t mai mult cu c\u00e2t proiectul tehnic prevede realizarea unui drum betonat, pe care urm\u0103toarele interven\u021bii nu vor mai fi permise. De asemenea, trebuie men\u021bionat c\u0103 la momentul emiterii ordinului de \u00eencepere a lucr\u0103rilor, furnizorii de utilit\u0103\u021bi nu anun\u021baser\u0103 c\u0103 au investi\u021bii programate. Ulterior, at\u00e2t ApaVital SA, c\u00e2t \u0219i DelGaz Grid SA, au anun\u021bat municipalitatea c\u0103 inten\u021bionez\u0103 s\u0103 realizeze investi\u021bii proprii pe \u0219oseaua B\u00e2rnova \u0219i au solicitat certificat de urbanism \u0219i autoriza\u021bie de construire \u00een acest scop. Astfel, ini\u021bial, DelGaz Grid SA, cea ale c\u0103rei interven\u021bii au afectat mai puternic trama stradal\u0103, \u0219i-a asumat un grafic de lucr\u0103ri potrivit c\u0103ruia acestea ar fi trebuit \u00eencheiate pe 30 iunie 2018. Acest grafic a \u00eenso\u021bit o autoriza\u021bie de construire eliberat\u0103 de municipaitate \u00een luna aprilie a acestui an \u0219i care viza o investi\u021bie \u00een \u00eenlocuirea de conducte \u015fi bran\u015famente, \u00eenso\u021bit\u0103 de obliga\u021bia realiz\u0103rii lucr\u0103rilor de refacere a infrastructurii rutiere afectate. \u201e\u00cen urma notific\u0103rilor trimise de Prim\u0103rie referitor la evidentele \u00eent\u00e2rzieri, DelGaz Grid SA a solicitat municipalit\u0103\u021bii o prelungire a termenelor, noul grafic de lucr\u0103ri fix\u00e2nd data finaliz\u0103rii lucr\u0103rilor, inclusiv a celor de repara\u021bii, la 1 noiembrie. Cum nici noul grafic nu a fost respectat de DelGaz Grid SA, municipalitatea a trimis furnizorului alte notific\u0103ri pentru a accelera ritmul lucr\u0103rilor. \u00cen ultimul r\u0103spuns oficial, transmis pe 8 octombrie, DelGaz Grid SA a informat Prim\u0103ria c\u0103 la acel moment avea \u00een derulare o procedur\u0103 de achizi\u021bie pentru lucr\u0103rile de refacere a infrastructurii rutiere afectate de lucr\u0103ri \u0219i c\u0103 va respecta termenul de 1 noiembrie. \u00cen cursul zilei de vineri, 19 octombrie, reprezentan\u021bii conducerii DelGaz Grid SA au informat conducerea Prim\u0103riei c\u0103 au \u00eencheiat procedura de achizi\u021bie men\u021bionat\u0103, \u00een valoare de circa 1 milion de lei, \u0219i au promis c\u0103 \u00een cursul zilei de ast\u0103zi, 22 octombrie, vor emite comanda de \u00eencepere a lucr\u0103rilor de repara\u021bii. Potrivit angajamentului conducerii DelGaz Grid SA, aceste lucr\u0103ri ar urma s\u0103 dureze \u00eentre 15 \u0219i 30 de zile, \u00een func\u021bie de condi\u021biile meteorologice\u201d, se precizeaz\u0103 \u00eentr-un comunicat al Biroului de pres\u0103 al Prim\u0103riei Municipiului Ia\u015fi. De men\u0163ionat c\u0103 Prim\u0103ria a propus at\u00e2t ApaVital SA, c\u00e2t \u0219i DelGaz Grid SA, s\u0103 \u00eencheie contracte pentru lucr\u0103rile de repara\u021bii cu Citadin SA, societatea municipalit\u0103\u021bii av\u00e2nd la dispozi\u021bie utilajele \u0219i for\u021ba de munc\u0103 necesare pentru a executa rapid interven\u021biile urgente. ApaVital SA a acceptat oferta, astfel \u00eenc\u00e2t Citadin SA va finaliza repara\u021biile pe por\u021biunile de drum afectate de re\u021beaua de ap\u0103 \u0219i canalizare \u00een urm\u0103toarele trei zile. DelGaz Grid SA a declinat \u00eens\u0103 oferta, prefer\u00e2nd s\u0103 \u00ee\u0219i aleag\u0103 propria firm\u0103 care s\u0103 execute repara\u021biile, ceea ce a generat o nou\u0103 \u00eent\u00e2rziere. \u201ePentru a reduce praful creat de lucr\u0103rile din zon\u0103, Salubris SA va uda \u0219oseaua de trei ori pe zi. Dup\u0103 1 noiembrie, termenul la care DelGaz Grid SA s-a angajat c\u0103 va preda amplasamentul, Prim\u0103ria va amenda furnizorul de utilit\u0103\u021bi pentru fiecare zi de \u00eent\u00e2rziere\u201d, se mai spune \u00een comunicatul Prim\u0103riei Ia\u015fi. Reamintim c\u0103, dup\u0103 finalizarea investi\u021biei \u0219i a lucr\u0103rilor de repara\u021bii executate de DelGaz Grid SA, Prim\u0103ria Municipiului Ia\u0219i va continua modernizarea \u0219oselei Ia\u0219i &#8211; B\u00e2rnova, de la intersec\u021bia cu \u0219oseaua Bucium p\u00e2n\u0103 la limita cu comuna B\u00e2rnova. Vor fi f\u0103cute lucr\u0103ri pe o distan\u021b\u0103 de 2.519 metri, iar valoarea acestora este de 6.193.820 lei, inclusiv TVA. Lucr\u0103rile vor fi executate p\u00e2n\u0103 la finalizarea lor \u00een anul 2019. Modernizarea \u0219oselei Ia\u0219i &#8211; B\u00e2rnova face parte dintr-un program de lucr\u0103ri care include \u015fapte artere rutiere importante din municipiu. Sunt moderniza\u0163i, \u00een total, 6,1 kilometri de carosabil: strada Sm\u00e2rdan (630 metri), \u015foseaua B\u00e2rnova (2.519 metri), strada Petre Vancea (607 metri), bulevardul Prim\u0103verii (602 metri), strada Mo\u015fu (382 metri) \u015fi strada Ogorului (286 metri). Lucr\u0103rile sunt executate de asocierea Viarom Construct SRL &#8211; Conest SA, iar valoarea total\u0103 a contractului este de 12.072.482,99 lei, f\u0103r\u0103 TVA (14.366.254,76 lei, cu TVA).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Reprezentan\u021bii Prim\u0103riei Municipiului Ia\u0219i, \u00een frunte cu viceprimarul Radu Botez, au avut \u00een aceast\u0103 diminea\u021b\u0103,&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=37348\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":37349,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,726,9672,9093,40,9524],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/37348"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=37348"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/37348\/revisions"}],"predecessor-version":[{"id":37350,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/37348\/revisions\/37350"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/37349"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=37348"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=37348"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=37348"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}