{"id":42012,"date":"2019-06-19T13:06:59","date_gmt":"2019-06-19T10:06:59","guid":{"rendered":"http:\/\/infois.ro\/?p=42012"},"modified":"2019-06-19T13:06:59","modified_gmt":"2019-06-19T10:06:59","slug":"au-inceput-lucrarile-de-modernizare-a-soselei-iasi-voinesti","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=42012","title":{"rendered":"Au \u00eenceput lucr\u0103rile de modernizare a \u015eoselei Ia\u0219i \u2013 Voine\u0219ti"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2019\/06\/modernizare-iasi-voinesti.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-42013\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2019\/06\/modernizare-iasi-voinesti.jpg\" alt=\"\" width=\"336\" height=\"181\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2019\/06\/modernizare-iasi-voinesti.jpg 640w, https:\/\/infois.ro\/wp-content\/uploads\/2019\/06\/modernizare-iasi-voinesti-300x162.jpg 300w\" sizes=\"(max-width: 336px) 100vw, 336px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">SC Enviro Construct SRL, firma care a fost declarat\u0103 c\u00e2\u015ftig\u0103toare a licita\u0163iei organizat\u0103 de Prim\u0103rie pentru executarea lucr\u0103rilor de reabilitare \u015fi modernizare a \u015eoselei Ia\u015fi \u2013 Voine\u015fti, \u015fi-a intrat deja \u00een p\u00e2ine, odat\u0103 cu excavarea complet\u0103 a tramei stradele pe ambele sensuri de circula\u0163ie a tronsonului \u00een lungime total\u0103 de 3,4 kilometri. Lucr\u0103rile sunt executate de \u00een cadrul unui contract \u00een valoare de 6.311.904 de lei, f\u0103r\u0103 TVA (7.511.165,76 lei, cu TVA) \u0219i vor dura maximum 24 de luni. \u201eIndicatorii tehnico-economici aproba\u021bi de Consiliul Local prev\u0103d c\u0103 \u00eentreg proiectul dureaz\u0103 24 de luni. Proiectul de modernizare a \u0219oselei Ia\u0219i &#8211; Voine\u0219ti nu cuprinde \u00eens\u0103 doar tronsonul unde se lucreaz\u0103 \u00een prezent, ci lucr\u0103ri p\u00e2n\u0103 \u00een Calea Gal\u0103\u021bii, aproximativ trei kilometri de unde se lucreaz\u0103 \u00een prezent. \u00cen etapa a doua, proiectul se va lega cu \u0219oseaua Nicolina, inclusiv cu supral\u0103rgirea acestei \u0219osele pe diverse por\u021biuni \u00een vedere construirii unor benzi de stocaj sau de viraj de dreapta. Deci este un proiect mai complex dec\u00e2t pare. Oricum, dup\u0103 discu\u021biile cu constructorul, am siguran\u021ba c\u0103 lucr\u0103rile vor fi mult mai accelerate dec\u00e2t cum sunt prev\u0103zute \u00een contract \u0219i cred c\u0103 vom termina mai devreme\u201d, a declarat primarul Mihai Chirica. Potrivit acestuia, cel mai greu tronson este cel avut \u00een vedere \u00een acest moment de constructor, care presupune o excavare complet\u0103 a tramei stradale pe ambele fire, \u00een condi\u021bii de trafic. \u201cEste o lucrare dificil\u0103, \u00eentruc\u00e2t ea nu presupune interzicerea total\u0103 a traficului. Probabil c\u0103 pe parcursul lucr\u0103rilor vor fi \u0219i momente c\u00e2nd vom fi nevoi\u021bi s\u0103 interzicem, temporar, traficul \u00een zon\u0103, cu devierea acestuia pe \u0219oseaua de centur\u0103, dar acest lucru doar \u00een momentul \u00een care vom ajunge cu lucr\u0103rile \u00een acele faze de execu\u021bie. Cert este c\u0103 lucr\u0103rile au \u00eenceput, constructorul are tot ceea ce \u00eei trebuie din punct de vedere tehnic, documenta\u021bii \u0219i aprob\u0103ri, echipamente \u0219i sursa de finan\u021bare asigurat\u0103 \u0219i \u00eel vom urm\u0103ri \u00eendeaproape\u201d, a subliniat \u015feful municipalit\u0103\u0163ii ie\u015fene.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SC Enviro Construct SRL, firma care a fost declarat\u0103 c\u00e2\u015ftig\u0103toare a licita\u0163iei organizat\u0103 de Prim\u0103rie&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=42012\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":42013,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,3905,40,846,3112,12347],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/42012"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=42012"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/42012\/revisions"}],"predecessor-version":[{"id":42014,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/42012\/revisions\/42014"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/42013"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=42012"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=42012"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=42012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}