{"id":43283,"date":"2019-09-13T09:32:39","date_gmt":"2019-09-13T06:32:39","guid":{"rendered":"http:\/\/infois.ro\/?p=43283"},"modified":"2019-09-13T09:32:39","modified_gmt":"2019-09-13T06:32:39","slug":"primaria-municipiului-iasi-va-moderniza-drumul-spre-dancu","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=43283","title":{"rendered":"Prim\u0103ria Municipiului Ia\u0219i va moderniza drumul spre Dancu"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2019\/09\/drumul-spre-dancu.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-43284\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2019\/09\/drumul-spre-dancu.jpg\" alt=\"\" width=\"319\" height=\"182\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2019\/09\/drumul-spre-dancu.jpg 640w, https:\/\/infois.ro\/wp-content\/uploads\/2019\/09\/drumul-spre-dancu-300x172.jpg 300w, https:\/\/infois.ro\/wp-content\/uploads\/2019\/09\/drumul-spre-dancu-139x80.jpg 139w, https:\/\/infois.ro\/wp-content\/uploads\/2019\/09\/drumul-spre-dancu-140x80.jpg 140w\" sizes=\"(max-width: 319px) 100vw, 319px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">\u00cen urma apari\u021biei \u00een spa\u021biul public a unor specula\u021bii nefondate, conducerea Prim\u0103riei Municipiului Ia\u0219i face o serie de preciz\u0103ri necesare pentru corecta informare a opiniei publice \u00een ceea ce prive\u0219te proiectul moderniz\u0103rii drumului spre Dancu. \u00cen cadrul Programului Opera\u021bional Regional &#8211; Axa 4 \u201eSprijinirea dezvolt\u0103rii urbane durabile\u201d Municipiului Ia\u0219i i-a fost alocat\u0103 ini\u021bial suma de 58.348.400 euro. Cea mai mare parte a sumei, anume 47.390.570 euro, a fost alocat\u0103 pentru Axa 4.1 \u201eReducerea emisiilor de carbon \u00een municipiile re\u0219edin\u021b\u0103 de jude\u021b prin investi\u021bii bazate pe planurile de mobilitate urban\u0103 durabil\u0103\u201d, restul fondurilor fiind alocate astfel: Axa 4.2 &#8211; 5.263.026 euro, Axa 4.3 &#8211; 2.473.972 euro, Axa 4.4 &#8211; 2.176.395 euro, Axa 4.5 &#8211; 1.044.436 euro. Astfel de aloc\u0103ri au fost acordate \u0219i comunicate tuturor municipiilor din \u021bar\u0103, acestea av\u00e2nd posibilitatea de a-\u0219i stabili, \u00eentre anumite limite, priorit\u0103\u021bile \u00een func\u021bie de specificul local. Dat fiind gradul foarte mic de absorb\u021bie a fondurilor europene la nivel na\u021bional \u0219i experien\u021ba anterioar\u0103 pe alte axe de finan\u021bare european\u0103, Autoritatea de Management a Programului Opera\u021bional Regional (AMPOR), prin Agen\u021bia pentru Dezvoltare Regional\u0103 Nord-Est (ADRNE) a solicitat municipiilor s\u0103 \u00eentocmeasc\u0103 proiecte cu o valoare total\u0103 de p\u00e2n\u0103 la 200% fa\u021b\u0103 de alocarea ini\u021bial\u0103. Angajamentul AMPOR a fost c\u0103, din economii f\u0103cute \u00een urma licita\u021biilor \u0219i prin realoc\u0103ri \u00eentre axele de finan\u021bare, vor fi f\u0103cute supliment\u0103ri consistente ale fondurilor europene, astfel \u00eenc\u00e2t municipiile s\u0103 beneficieze de finan\u021b\u0103ri mai mari fa\u021b\u0103 de cele ini\u021biale. \u00a0La fel ca alte autorit\u0103\u021bi locale, Prim\u0103ria Municipiului Ia\u0219i s-a conformat \u0219i a redactat proiecte cu o valoare semnificativ mai mare fa\u021b\u0103 de cea sigur\u0103. Astfel, pe Axa 4.1 municipalitatea ie\u0219ean\u0103 a realizat \u0219i depus pentru evaluare cinci proiecte: \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i \u2013 Reorganizarea circula\u021biei pe bulevardul Tudor Vladimirescu\u201d cu o valoare total\u0103 de 114,197,308.33 lei (aproximativ 24 de milioane de euro), \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i\u201d cu o valoare total\u0103 de 114.359.729,95 lei (aproape 24 milioane de euro), \u201eReabilitarea infrastructurii de tramvai Ia\u0219i \u2013 Dancu\u201d cu o valoare total\u0103 de 104.022.632 lei (circa 22 milioane de euro), \u201eSistem alternativ de mobilitate urban\u0103 utiliz\u00e2nd sta\u021bii automate de \u00eenchiriere a bicicletelor \u2013 Ia\u0219i VeloCity\u201d cu o valoare de 22.226.523,64 lei (circa 4,7 milioane de euro) \u0219i \u201eSistem de management al transportului public \u0219i e-ticketing\u201d, cu o valoare de 12.645.900,88 lei (aproape 2,7 milioane de euro), \u00een total aproape 77,5 milioane de euro. Toate aceste proiecte au fost evaluate, au ob\u021binut punctaje peste limita minim\u0103 de 70 de puncte, \u00eens\u0103 doar \u00een cazul primelor dou\u0103 au fost semnate contractele de finan\u021bare european\u0103 cu ADRNE. \u00centre timp, la acelea\u0219i recomand\u0103ri ale AMPOR, prin ADRNE, Prim\u0103ria Municipiului Ia\u0219i a organizat \u0219i licita\u021biile pentru lucr\u0103rile de infrastructur\u0103 \u0219i achizi\u021bia de tramvaie prev\u0103zute \u00een primele trei proiecte enumerate, \u00eens\u0103 procedurile au fost \u00eencheiate doar \u00een cazul primelor dou\u0103. \u00cen ciuda angajamentelor ini\u021biale \u0219i eforturilor de a redacta proiecte, de a le depune \u0219i de a organiza licita\u021biile aferente f\u0103cute de Prim\u0103ria Municipiului Ia\u0219i, la fel ca majoritatea autorit\u0103\u021bilor locale din \u021bar\u0103, AMPOR &#8211; ADRNE a comunicat recent municipiilor c\u0103 finan\u021b\u0103rile disponibile sunt cele ini\u021biale, 47.390.570 euro \u00een cazul Ia\u0219ului pe Axa 4.1, astfel \u00eenc\u00e2t prim\u0103riile trebuie fie s\u0103 renun\u021be la o parte dintre proiectele deja depuse \u0219i evaluate, fie s\u0103 le finan\u021beze singure, cu fonduri din bugetele locale. De altfel, pe 21 august, la sediul ADRNE din Piatra Neam\u021b a avut loc o \u0219edin\u021b\u0103 a conducerii Agen\u021biei cu primarii celor \u0219ase municipii re\u0219edin\u021b\u0103 de jude\u021b din regiune care beneficiaz\u0103 de fonduri prin Axa 4, ace\u0219tia convenind atunci s\u0103 trimit\u0103 AMPOR o solicitare de aprobare a unei supracontract\u0103ri pentru Axa 4 din Programul Opera\u021bional Regional care s\u0103 permit\u0103 realizarea proiectelor a c\u0103ror valoare excede alocarea ini\u021bial\u0103. Potrivit analizei f\u0103cute \u00een cadrul \u0219edin\u021bei de la ADRNE, \u00een cazul Municipiului Ia\u0219i pe Axa 4.1 alocarea ini\u021bial\u0103 a fost de 225.536.463, 97 lei, \u00een timp ce valoarea proiectelor depuse a fost de 298.833.720,71 lei, adic\u0103 132,5% fa\u021b\u0103 de alocarea ini\u021bial\u0103. \u00cen condi\u021biile \u00een care AMPOR nu va suplimenta finan\u021barea european\u0103, a\u0219a cum s-a angajat \u00een fa\u021ba municipiilor, aceasta \u00eenseamn\u0103 c\u0103, pentru a realiza proiectele men\u021bionate, Prim\u0103ria Municipiului Ia\u0219i va trebui s\u0103 aloce din fonduri proprii \u00eenc\u0103 73.297.256,74 lei (circa 15.5 milioane de euro). Concret, \u00een loc s\u0103 contribuie la finan\u021barea unui proiect precum \u201eReabilitarea infrastructurii de tramvai Ia\u0219i \u2013 Dancu\u201d cu 2% din valoarea total\u0103, Municipiul Ia\u0219i va trebui practic s\u0103 finan\u021beze proiectul aproape integral. <em>\u201eSitua\u021bia este general\u0103 la nivelul municipiilor nu doar din Regiunea Nord-Est, ci din \u00eentreaga \u021bar\u0103, \u0219i demonstreaz\u0103 \u00eenc\u0103 o dat\u0103 incompeten\u021ba \u0219i iresponsabilitatea Guvernului Rom\u00e2niei, cu efecte din cele mai dramatice asupra municipiilor, polii de cre\u0219tere \u0219i dezvoltare ai \u021b\u0103rii. Guvernan\u021bii ne-au promis supliment\u0103ri de fonduri, am investit timp, bani \u0219i resurse umane pentru a scrie proiecte, am organizat \u0219i licita\u021biile aferente, pentru ca acum s\u0103 ni se spun\u0103 c\u0103 Guvernul a ajuns la fundul sacului \u0219i nu este \u00een stare s\u0103 onoreze angajamentul pe care \u0219i l-a luat \u00een fa\u021ba noastr\u0103, a primarilor, \u0219i, mai ales, \u00een fa\u021ba milioanelor de rom\u00e2ni din municipiile din Rom\u00e2nia. \u00cen ciuda b\u0103t\u0103ii de joc strig\u0103toare la cer a Guvernului fa\u021b\u0103 de comunit\u0103\u021bile locale, a\u0219a cum am declarat \u0219i \u00een ultima \u0219edin\u021b\u0103 a Consiliului Local, nu vom renun\u021ba la proiectul de modernizare a c\u0103ii de rulare a tramvaielor \u0219i drumului spre Dancu. Ne vom \u00eemprumuta dac\u0103 trebuie, vom face sacrificii, dar ne vom onora promisiunea fa\u021b\u0103 de locuitorii Ia\u0219ului \u0219i ai comunei Holboca!\u201d<\/em>, a declarat primarul Mihai Chirica. Proiectul \u201eReabilitarea infrastructurii de tramvai Ia\u0219i \u2013 Dancu\u201d vizeaz\u0103 reabilitarea infrastructurii de tramvai \u0219i a drumului rutier Ia\u0219i \u2013 Dancu, reabilitarea podului Ciurchi II \u0219i achizi\u021bionarea a patru tramvaie.<\/p>\n<p style=\"text-align: right;\"><strong>Biroul de Pres\u0103 al Prim\u0103riei Municipiului Ia\u0219i<\/strong><\/p>\n<p style=\"text-align: justify;\">\n","protected":false},"excerpt":{"rendered":"<p>\u00cen urma apari\u021biei \u00een spa\u021biul public a unor specula\u021bii nefondate, conducerea Prim\u0103riei Municipiului Ia\u0219i face&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=43283\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":43284,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[12625,74,1629,5435,40,3614,2353,3112,515],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/43283"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=43283"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/43283\/revisions"}],"predecessor-version":[{"id":43285,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/43283\/revisions\/43285"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/43284"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=43283"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=43283"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=43283"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}