{"id":44352,"date":"2019-11-14T14:50:42","date_gmt":"2019-11-14T12:50:42","guid":{"rendered":"http:\/\/infois.ro\/?p=44352"},"modified":"2019-11-14T14:50:42","modified_gmt":"2019-11-14T12:50:42","slug":"un-nou-contract-semnat-de-consiliul-judetean-in-cadrul-axei-rutiere-iasi-suceava","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=44352","title":{"rendered":"Un nou contract semnat de Consiliul Jude\u021bean \u00een cadrul Axei Rutiere Ia\u0219i- Suceava"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2019\/11\/harta-axa-iasi-suceava.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-44237\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2019\/11\/harta-axa-iasi-suceava.jpg\" alt=\"\" width=\"352\" height=\"252\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2019\/11\/harta-axa-iasi-suceava.jpg 640w, https:\/\/infois.ro\/wp-content\/uploads\/2019\/11\/harta-axa-iasi-suceava-300x215.jpg 300w\" sizes=\"(max-width: 352px) 100vw, 352px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Pre\u015fedintele Consiliului Jude\u0163ean Ia\u015fi, Maricel Popa, a anun\u0163at joi c\u0103 cel de-al doilea contract de execu\u021bie pentru Axa Rutier\u0103 Ia\u0219i-Suceava urmeaz\u0103 s\u0103 fie semnat s\u0103pt\u0103m\u00e2na viitoare, \u00een prezen\u0163a reprezentan\u021bilor administra\u0163iei jude\u0163ene \u015fi a firmei c\u00e2\u0219tig\u0103toare a licita\u021biei, respectiv Asocierea S.C. ALPENSIDE S.R.L.\u00a0 Bucure\u0219ti\u2013 S.C. GENERAL TRUST ARGE\u0218 S.R.L. Pite\u0219ti. Este vorba despre Lotul 1- DJ 282 limita Ia\u0219i \u2013 Rediu \u2013 Movileni \u2013 Gropni\u021ba \u2013 DJ 281D, \u00een lungime de 29,584 km, proiect \u00een valoare de 60.361.648,98 lei1 (12,7 milioane euro), f\u0103r\u0103 TVA. Durata de execu\u021bie a lucr\u0103rilor este de 24 de luni de la emiterea ordinului de \u00eencepere, iar perioada de garan\u021bie este de 60 luni de la data recep\u021biei. \u00a0Pentru jude\u021bul Ia\u015fi, execu\u021bia lucr\u0103rilor a fost \u00eemp\u0103r\u021bit\u0103 \u00een trei loturi, dup\u0103 cum urmeaz\u0103:\u00a0Lotul 1 &#8211; DJ 282 Limita Ia\u0219i \u2013 Rediu \u2013 Movileni \u2013 Gropni\u021ba \u2013 DJ 281D, \u00een lungime de 29,584 km, Lotul 2 -DJ 281D de la Coarnele Caprei &#8211; Focuri \u2013 Gropni\u021ba, \u0219i DJ 281B Coarnele Caprei \u2013 Belce\u0219ti (DJ 281) \u00een lungime de 22,001 km \u015fi, respectiv, Lotul 3- DJ 281 de la Belce\u0219ti \u2013 Cepleni\u021ba \u2013 DN 28B \u0219i DJ 281 de la DN 28B \u2013 Scobin\u021bi \u2013 Lespezi \u00een lungime de 40,610 km. \u201dS\u0103pt\u0103m\u00e2na trecut\u0103 am semnat contractul pentru execu\u021bia lucr\u0103rilor pentru cei 22 de kilometri de pe lotul 2 \u0219i am promis c\u0103 nu va mai trece mult timp p\u00e2n\u0103 c\u00e2nd vom concretiza execu\u021bia \u0219i la Lotul 1. Iat\u0103 c\u0103 am ajuns \u0219i la semnarea documenta\u021biei care, practic, va fi urmat\u0103, dup\u0103 un ordin de \u00eencepere, de demararea lucr\u0103rilor. Nu va putea spune nimeni c\u0103 nu se va mai face nimic pentru c\u0103 suntem \u00een prag de iarn\u0103 \u0219i asta pentru c\u0103 vorbim de lucr\u0103ri ce pot fi executate \u0219i \u00een anotimpul rece\u201d, a declarat pre\u015fedintele CJ Ia\u015fi, Maricel Popa, \u00eentr-o conferin\u0163\u0103 de pres\u0103 care a avut loc joi la sediul institu\u0163iei. Proiectul \u201dRegiunea Nord- Est- Axa rutier\u0103 strategic\u0103 1: Ia\u0219i-Suceava\u201d face parte din Planul de Dezvoltare Regional\u0103 Nord \u2013 Est 2014 \u2013 2020, Axa prioritar\u0103 6: \u00cembun\u0103t\u0103\u021birea infrastructurii rutiere de importan\u021b\u0103 regional\u0103, Prioritatea de investi\u021bii 6.1: Stimularea mobilit\u0103\u021bii regionale prin conectarea nodurilor secundare \u0219i ter\u021biare la infrastructura TEN-T, inclusiv a nodurilor multimodale, este implementat \u00een parteneriat cu jude\u021bul Suceava \u0219i prevede reabilitarea a aproape 170 km de drum de pe teritoriul celor dou\u0103 jude\u021be, din care 92 km \u00een jude\u021bul Ia\u0219i. Valoarea total\u0103 a proiectului este de 486.783.115,25 lei (103 milioane de Euro) inclusiv TVA. Pe teritoriul jude\u021bului Ia\u0219i, comunele care vor beneficia de noul proiect sunt: Rediu, Movileni, Gropni\u021ba, Coarnele Caprei, Cotnari, Focuri, Belce\u0219ti, Cepleni\u021ba, Scobin\u021bi, Lespezi, Sire\u021bel.<\/p>\n<p style=\"text-align: justify;\"><strong>\u00a0<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>\u00a0<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>\u00a0<\/strong><\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">\n","protected":false},"excerpt":{"rendered":"<p>Pre\u015fedintele Consiliului Jude\u0163ean Ia\u015fi, Maricel Popa, a anun\u0163at joi c\u0103 cel de-al doilea contract de&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=44352\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":44237,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,12513,11281,40,12822],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/44352"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=44352"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/44352\/revisions"}],"predecessor-version":[{"id":44353,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/44352\/revisions\/44353"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/44237"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=44352"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=44352"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=44352"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}