{"id":46668,"date":"2020-03-30T07:24:35","date_gmt":"2020-03-30T04:24:35","guid":{"rendered":"http:\/\/infois.ro\/?p=46668"},"modified":"2020-03-30T07:24:35","modified_gmt":"2020-03-30T04:24:35","slug":"incep-lucrarile-de-modernizare-a-caii-de-rulare-a-tramvaielor-din-zona-tudor-vladimirescu","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=46668","title":{"rendered":"\u00cencep lucr\u0103rile de modernizare a c\u0103ii de rulare a tramvaielor din zona Tudor Vladimirescu"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2020\/03\/tramvaie-tudor.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-46669\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2020\/03\/tramvaie-tudor.jpg\" alt=\"\" width=\"350\" height=\"247\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2020\/03\/tramvaie-tudor.jpg 640w, https:\/\/infois.ro\/wp-content\/uploads\/2020\/03\/tramvaie-tudor-300x212.jpg 300w\" sizes=\"(max-width: 350px) 100vw, 350px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Luni, 30 martie, vor demara lucr\u0103rile de modernizare a c\u0103ii de rulare a tramvaielor de pe bulevardul Tudor Vladimirescu, \u00eentre intersec\u0163ia din Buc\u0219inescu \u0219i Leroy Merlin. Lucr\u0103rile de reabilitare a tronsonului liniei de tramvai cuprind urm\u0103toarele activit\u0103\u021bi: execu\u021bia lucr\u0103rilor de construc\u021bii \u0219i instala\u021bii aferente liniei de tramvai pe traseul Buc\u0219inescu \u2013 bulevardul Tudor Vladimirescu \u2013 intersec\u021bie Calea Chi\u0219in\u0103ului (lungime: 2.444 metri \u2013 cale simpl\u0103 de rulare); reabilitarea celor dou\u0103 peroane din sta\u021bia Tudor Vladimirescu, reabilitarea podului Tudor Vladimirescu (suprafa\u021b\u0103: 1.196 metri p\u0103tra\u021bi) \u0219i construirea a dou\u0103 sta\u021bii de tramvai. \u201cPentru prima dat\u0103 \u00een Ia\u0219i va fi introdus\u0103 o band\u0103 dedicat\u0103 pentru tramvai, care va fi delimitat\u0103 fizic \u00een teren cu butoni stradali solari, care nu vor \u00eempiedica dep\u0103\u0219irea \u00een caz de urgen\u021b\u0103. Aceast\u0103 solu\u021bie tehnic\u0103 ar putea aplicat\u0103 \u0219i la alte tronsoane de tramvai care urmeaz\u0103 s\u0103 fie reabilitate: zona T\u00e2rgu Cucu \u2013 Cinci Drumuri, Podu Ro\u0219 \u2013 \u021aes\u0103tura \u0219i Doi B\u0103ie\u021bi \u2013 Dancu\u201d, precizeaz\u0103 reprezentan\u0163ii municipalit\u0103\u0163ii, care daug\u0103 c\u0103 proiectul general include \u0219i achizi\u021bionarea a \u0219apte tramvaie noi. Lucr\u0103rile sunt executate de Asocierea Conest SA Ia\u0219i &#8211; Mari Vila Com SRL Bucure\u0219ti, contra unei sume de 34.475.207,68 lei, inclusiv TVA (aproximativ 7,24 milioane de euro), valoarea total\u0103 a proiectului, de 114,197,308.33 lei (aproape 24 de milioane de euro), fiind asigurat\u0103 prin Programul Opera\u021bional Regional (POR) \u2013 Axa 4.1 al Uniunii Europene. Deschiderea \u0219antierului pe bd. Tudor Vladimirescu devine posibil\u0103 odat\u0103 cu finalizarea lucr\u0103rilor de modernizare a c\u0103ii de rulare a tramvaielor \u0219i carosabilului pe bd. \u021au\u021bora, \u00eentre Podu Ro\u0219 \u0219i bd. Prim\u0103verii. Lucr\u0103rile la calea de rulare sunt finan\u021bate tot prin Programul Opera\u021bional Regional \u2013 Axa 4.1, \u201eReabilitarea infrastructurii, \u00een valoare de 114.359.729,95 lei (aproape 24 de milioane de euro). Proiectul presupune reabilitarea infrastructurii \u0219i suprastructurii c\u0103ii de rulare tramvai pe trei tronsoane: Cinci Drumuri \u2013 strada P\u0103durii \u2013 strada Nicori\u021b\u0103, Pia\u021ba Podu Ro\u0219 \u2013 intersec\u021bie cu bulevardul Prim\u0103verii \u0219i bulevardul Virgil S\u0103hleanu \u2013 intersec\u021bie cu bulevardul Metalurgiei \u2013 rond \u021au\u021bora, precum \u0219i achizi\u021bionarea a cinci tramvaie. Proiectul privind reabilitarea infrastructurii de tramvai \u00een municipiul Ia\u0219i \u2013 reorganizarea circula\u021biei pe bulevardul Tudor Vladimirescu, implic\u0103 o serie de modific\u0103ri \u00een traficul rutier. Lucr\u0103rile, programate s\u0103 aib\u0103 loc p\u00e2n\u0103 pe 30 noiembrie, se vor executa pe timp de zi, \u00een intervalul orar 8.00 \u2013 17.00, \u00een zona DN 24 km 193+678 &#8211; 194+881. Acestea vor fi efectuate pe trei tronsoane, dup\u0103 cum urmeaz\u0103:<\/p>\n<p style=\"text-align: justify;\">\n<ol style=\"text-align: justify;\">\n<li>Tronsonul I: intersec\u021bia Buc\u0219inescu \u2013 Podul Tudor Vladimirescu (500 metri)<\/li>\n<\/ol>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Lucr\u0103rile vor consta \u00een demontare fir contact linii, desfacere linii tramvai, demolare structur\u0103 rutier\u0103 existent\u0103, lucr\u0103ri de infrastructur\u0103 linii, montare linii tramvai, refacere carosabil, refacere peroane, \u00eenlocuire st\u00e2lpi, montare fir contact linii, semnalizare \u0219i marcaje rutiere, separator de sens.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Pe durata execu\u021biei lucr\u0103rilor circula\u021bia rutier\u0103 din DN 24 va fi deviat\u0103 astfel:<\/p>\n<p style=\"text-align: justify;\">\n<ol style=\"text-align: justify;\">\n<li>a) pe firul de mers dinspre intersec\u021bia Buc\u0219inescu c\u0103tre podul Tudor Vladimirescu, circula\u021bia rutier\u0103 va fi blocat\u0103, aceasta deviindu-se din intersec\u021bia Buc\u0219inescu pe urm\u0103torul traseu:<\/li>\n<\/ol>\n<p style=\"text-align: justify;\">&#8211; strada Vasile Lupu (tronson 1, cu o lungime de 900 de metri);<\/p>\n<p style=\"text-align: justify;\">&#8211; strada Vasile Lupu (tronson 2, cu o lungime de 1.700 metri);<\/p>\n<p style=\"text-align: justify;\">&#8211; podul Metalurgiei;<\/p>\n<p style=\"text-align: justify;\">&#8211; bulevardul Metalurgiei;<\/p>\n<p style=\"text-align: justify;\">&#8211; Calea Chi\u0219in\u0103ului DN 28 (p\u00e2n\u0103 la intersec\u021bia cu DN 24).<\/p>\n<p style=\"text-align: justify;\">Accesul riveranilor din intersec\u021bia Buc\u0219inescu va fi permis dup\u0103 cum urmeaz\u0103:<\/p>\n<p style=\"text-align: justify;\">pe strada Sm\u00e2rdan;<\/p>\n<p style=\"text-align: justify;\">spre strada T\u0103ietoarei;<\/p>\n<p style=\"text-align: justify;\">ie\u0219ire \u00een bulevardul Dimitrie Mangeron.<\/p>\n<p style=\"text-align: justify;\">\n<ol style=\"text-align: justify;\">\n<li>b) pe firul de mers dinspre podul Tudor Vladimirescu c\u0103tre intersec\u021bia Buc\u0219inescu, circula\u021bia va fi deschis\u0103 traficului rutier, aceasta desf\u0103\u0219ur\u00e2ndu-se cu restric\u021bie de vitez\u0103 de 20 km\/h.<\/li>\n<\/ol>\n<p style=\"text-align: justify;\">\n<ol style=\"text-align: justify;\" start=\"2\">\n<li>Tronsonul II: Podul Tudor Vladimirescu \u2013 Calea Chi\u0219in\u0103ului (620 metri)<\/li>\n<\/ol>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Lucr\u0103rile vor consta \u00een demontare fir contact linii, desfacere linii tramvai, demolare structur\u0103 rutier\u0103 existent\u0103, lucr\u0103ri de infrastructur\u0103 linii, montare linii tramvai, refacere carosabil, \u00eenlocuire st\u00e2lpi, montare fir contact linii, semnalizare \u0219i marcaje rutiere.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Pe timpul execu\u021biei lucr\u0103rilor:<\/p>\n<p style=\"text-align: justify;\">\n<ol style=\"text-align: justify;\">\n<li>a) pe firul de mers dinspre podul Tudor Vladimirescu c\u0103tre Calea Chi\u0219in\u0103ului, circula\u021bia rutier\u0103 va fi blocat\u0103, aceasta deviindu-se astfel:<\/li>\n<\/ol>\n<p style=\"text-align: justify;\">Ruta 1 \u2013 de la podul Tudor Vladimirescu spre:<\/p>\n<ul style=\"text-align: justify;\">\n<li>Splai Bahlui Mal Drept;<\/li>\n<li>bulevardul Prim\u0103verii;<\/li>\n<li>intersec\u021bie cu DN 24.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Ruta 2 \u2013 de la podul Tudor Vladimirescu spre:<\/p>\n<ul style=\"text-align: justify;\">\n<li>bulevardul Chimiei;<\/li>\n<li>podul Metalurgiei;<\/li>\n<li>bulevardul Chimiei.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Ruta 3 \u2013 de la podul Tudor Vladimirescu spre:<\/p>\n<ul style=\"text-align: justify;\">\n<li>bulevardul Chimiei;<\/li>\n<li>bulevardul Metalurgiei;<\/li>\n<li>Calea Chi\u0219in\u0103ului DN 28 (p\u00e2n\u0103 la intersec\u021bia cu DN 24).<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">\n<ol style=\"text-align: justify;\">\n<li>b) pe firul de mers dinspre Calea Chi\u0219in\u0103ului DN 24 c\u0103tre podul Tudor Vladimirescu, circula\u021bia va fi deschis\u0103 traficului rutier, aceasta desf\u0103\u0219ur\u00e2ndu-se cu restric\u021bie de vitez\u0103 de 20 km\/h.<\/li>\n<\/ol>\n<p style=\"text-align: justify;\">\n<ol style=\"text-align: justify;\" start=\"3\">\n<li>Tronsonul III: Podul Tudor Vladimirescu peste r\u00e2ul Bahlui + rampe acces<\/li>\n<\/ol>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Lucr\u0103rile vor consta \u00een desfacerea c\u0103ii de rulare existente pe jum\u0103tate de cale, desfacerea rampelor de acces existente pe jum\u0103tate de cale, repara\u021bii la nivelul tablierului \u0219i suprastructurii, consolidarea podului la nivelul infrastructurii, execu\u021bia c\u0103ii pe pod pe jum\u0103tate de cale, refacerea rampelor de acces pe jum\u0103tate de cale, desfacerea c\u0103ii de rulare existente pe jum\u0103tate de cale, desfacerea rampelor de acces existente pe jum\u0103tate de cale, repara\u021bii la nivelul tablierului \u0219i suprastructurii, consolidarea podului la nivelul infrastructurii, execu\u021bia c\u0103ii pe pod pe jum\u0103tate de cale, refacerea rampelor de acces pe jum\u0103tate de cale, desfacerea c\u0103ii existente pe liniile de tramvai, execu\u021bia liniilor de tramvai, repara\u021bii la nivelul albiei, semnalizare \u0219i marcaje rutiere.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Restric\u021biile de circula\u021bie pe pod se vor impune corespunz\u0103tor cu lucr\u0103rile specifice de reabilitare a podului. Traficul rutier se va desf\u0103\u0219ura cu o restric\u021bie de 5 km\/h, circula\u021bia desf\u0103\u0219ur\u00e2ndu-se \u00een ambele sensuri pe jum\u0103tate din calea podului.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Modific\u0103ri \u00een circula\u021bia mijloacelor de transport \u00een comun<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">\u00cenceperea lucr\u0103rilor pe bd. Tudor Vladimirescu va aduce schimb\u0103ri \u0219i \u00een circula\u021bia mijloacelor de transport public. \u00centruc\u00e2t, de luni, 30 martie, vor fi impuse restric\u021bii de circula\u021bie a autovehiculelor pe tronsonul cuprins \u00eentre Buc\u0219inescu \u0219i CET pe sensul de mers c\u0103tre CET, traseele 42, 43, 46 \u0219i 47 vor fi deviate. Pentru \u00eenceput, sensul de mers CET \u2013 Buc\u0219inescu nu va fi afectat.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Din T\u00e2rgu Cucu, pe sensul de mers c\u0103tre CUG I, traseele 42 \u0219i 43 vor avea urm\u0103torul parcurs: T\u00e2rgu Cucu \u2013 str. A. Panu \u2013 Podu Ro\u0219 \u2013 bd. Socola \u2013 Casa Sindicatelor \u2013 Frigorifer \u2013 Continental \u2013 CUG I.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">De asemenea, din T\u00e2rgu Cucu, pe sensul de mers c\u0103tre Bucium, traseul 46 va avea urm\u0103torul parcurs: T\u00e2rgu Cucu \u2013 str. A. Panu \u2013 Podu Ro\u0219 \u2013 bd. Socola \u2013 Casa Sindicatelor \u2013 Frigorifer \u2013 Centrofarm \u2013 Bucium.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">\u00cen ceea ce prive\u0219te traseul 47, pe sensul de mers c\u0103tre Dacia, de la Spitalul de Copii \u201eSf. Maria\u201d, traseul 47 va avea urm\u0103torul parcurs: Spitalul de Copii \u201eSf. Maria\u201d \u2013 str. Elena Doamna \u2013 str. A. Panu \u2013 Podu Ro\u0219 \u2013 Pasaj Nicolina \u2013 Spitalul de Recuperare \u2013 Dacia.<\/p>\n<p style=\"text-align: justify;\">\n","protected":false},"excerpt":{"rendered":"<p>Luni, 30 martie, vor demara lucr\u0103rile de modernizare a c\u0103ii de rulare a tramvaielor de&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=46668\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":46669,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,2763,40,3614,13199,2936],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/46668"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=46668"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/46668\/revisions"}],"predecessor-version":[{"id":46670,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/46668\/revisions\/46670"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/46669"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=46668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=46668"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=46668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}