{"id":48676,"date":"2020-07-10T17:59:23","date_gmt":"2020-07-10T14:59:23","guid":{"rendered":"http:\/\/infois.ro\/?p=48676"},"modified":"2020-07-12T07:02:00","modified_gmt":"2020-07-12T04:02:00","slug":"a-fost-semnat-contractul-privind-inceperea-lucrarilor-de-reabilitare-a-infrastructurii-de-tramvai-iasi-dancu","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=48676","title":{"rendered":"A fost semnat contractul privind \u00eenceperea lucr\u0103rilor de reabilitare a infrastructurii de tramvai Ia\u015fi \u2013 Dancu"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2020\/07\/proiect-iasi-dancu.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-48678\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2020\/07\/proiect-iasi-dancu.jpg\" alt=\"\" width=\"334\" height=\"334\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2020\/07\/proiect-iasi-dancu.jpg 640w, https:\/\/infois.ro\/wp-content\/uploads\/2020\/07\/proiect-iasi-dancu-150x150.jpg 150w, https:\/\/infois.ro\/wp-content\/uploads\/2020\/07\/proiect-iasi-dancu-300x300.jpg 300w, https:\/\/infois.ro\/wp-content\/uploads\/2020\/07\/proiect-iasi-dancu-80x80.jpg 80w, https:\/\/infois.ro\/wp-content\/uploads\/2020\/07\/proiect-iasi-dancu-100x100.jpg 100w\" sizes=\"(max-width: 334px) 100vw, 334px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Primarul Mihai Chirica a semnat \u00een aceast\u0103 s\u0103pt\u0103m\u00e2n\u0103 contractul de lucr\u0103ri de construire aferent proiectului cu finan\u021bare european\u0103 \u201eReabilitarea infrastructurii de tramvai Ia\u0219i &#8211; Dancu\u201d. Potrivit reprezentan\u0163ilor municipalit\u0103\u0163ii, lucr\u0103rile efective vor \u00eencepe \u00een jurul datei de 20 iulie \u0219i vor fi executate \u00een cel mult 28 de luni de asocierea SC Mari Vila Com SRL Bucure\u0219ti \u2013 SC Conest SA Ia\u0219i \u00een cadrul unui contract \u00een valoare de 45.013.688,49 lei, f\u0103r\u0103 TVA (53.566.289,30 lei, cu TVA). Prim\u0103ria Municipiului Ia\u0219i a organizat \u00eenc\u0103 din luna iunie a anului 2019 licita\u021bia de lucr\u0103ri aferente acestui proiect, \u00eens\u0103 semnarea contractului a devenit posibil\u0103 dup\u0103 ce, pe 25 iunie, la Bucure\u0219ti, primarul Mihai Chirica \u0219i ministrul Lucr\u0103rilor Publice, Dezvolt\u0103rii \u0219i Administra\u021biei, Ion \u0218tefan, au semnat contractul de finan\u021bare european\u0103. Proiectul \u201eReabilitarea infrastructurii de tramvai Ia\u0219i &#8211; Dancu\u201d face parte din lista proiectelor municipalit\u0103\u021bii finan\u021bate prin intermediul Programului Opera\u0163ional Regional 2014 &#8211; 2020, Axa Prioritar\u0103 4 \u201eSprijinirea dezvolt\u0103rii urbane durabile\u201d. Valoarea total\u0103 a acestuia este de 104.022.631,88 lei, inclusiv TVA (aproximativ 21,66 milioane de euro), iar durata de implementare de 36 de luni (din care 28 de luni durata de execu\u021bie a lucr\u0103rilor). \u00cen cadrul proiectului \u201eReabilitarea infrastructurii de tramvai Ia\u0219i &#8211; Dancu\u201d vor fi f\u0103cute urm\u0103toarele lucr\u0103ri \/ achizi\u021bii:<\/p>\n<ol style=\"text-align: justify;\">\n<li>Realizarea elementelor componente necesare func\u021bion\u0103rii c\u0103ii de rulare tramvai Ia\u0219i &#8211; Dancu, tronson cuprins \u00eentre intersec\u021bia str\u0103zilor Vasile Lupu \u0219i Aurel Vlaicu \u0219i limita intravilanului Municipiului Ia\u0219i (\u00een lungime de 2.460 metri cale dubl\u0103): infrastructur\u0103, suprastructur\u0103, re\u021bea fir contact \u0219i modernizarea elementelor de siguran\u021b\u0103 a circula\u021biei tramvaielor (semnalistic\u0103 vertical\u0103 \u0219i orizontal\u0103, modernizarea trecerilor de pietoni, crearea de facilit\u0103\u021bi pentru persoanele cu dizabilit\u0103\u021bi)<\/li>\n<li>Reabilitarea podului Ciurchi II<\/li>\n<li>Construirea a opt sta\u021bii de transport public pentru tramvaie<\/li>\n<li>Reabilitarea trotuarelor pe lungimea liniei de tramvai cu o suprafa\u021b\u0103 de aproximativ 9.350 metri p\u0103tra\u021bi<\/li>\n<li>Reabilitarea zonelor verzi pe o suprafa\u021b\u0103 de 1.775 metri p\u0103tra\u021bi<\/li>\n<li>Achizi\u021bionarea a patru tramvaie.<\/li>\n<\/ol>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Cele patru tramvaie prev\u0103zute \u00een acest proiect fac parte dintr-un lot de 16 tramvaie pentru care Prim\u0103ria Municipiului Ia\u0219i a semnat, pe 11 noiembrie 2019, contractul de furnizare cu compania turceasc\u0103 Bozankaya Otomotiv Mak. Iml. Ith. Ve Ihr. A.\u015e. Valoarea total\u0103 a achizi\u021biei celor 16 tramvaie este de 140.964.270 lei, f\u0103r\u0103 TVA (167.747.481,3 lei, cu TVA), adic\u0103 circa 35.241.000 euro, respectiv 2.202.566 euro pentru fiecare tramvai. Licita\u021bia pentru achizi\u021bia celor 16 tramvaie a fost \u00eemp\u0103r\u021bit\u0103 \u00een trei loturi, corespunz\u0103toare a trei proiecte cu finan\u021bare european\u0103 care privesc \u0219i lucr\u0103ri de modernizare a liniilor de tramvai, refacere a carosabilului \u0219i trotuarelor \u0219i construirea de sta\u021bii. pe mai multe tronsoane: intersec\u021bie Buc\u0219inescu \u2013 bulevardul Tudor Vladimirescu \u2013 intersec\u021bie Calea Chi\u0219in\u0103ului, Cinci Drumuri \u2013 strada P\u0103durii \u2013 strada Nicori\u021b\u0103, Pia\u021ba Podu Ro\u0219 \u2013 intersec\u021bie cu bulevardul Prim\u0103verii, bulevardul Virgil S\u0103hleanu \u2013 intersec\u021bie cu bulevardul Metalurgiei \u2013 rond \u021au\u021bora \u0219i Ia\u0219i &#8211; Dancu. Licita\u021bia pentru toate cele trei loturi a fost adjudecat\u0103 de compania turceasc\u0103 dup\u0103 cum urmeaz\u0103:<\/p>\n<ul style=\"text-align: justify;\">\n<li>Lotul 1, aferent proiectului \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i \u2013 Reorganizarea circula\u021biei pe bulevardul Tudor Vladimirescu\u201d cu o valoare total\u0103 de 114,197,308.33 lei (aproximativ 24 de milioane de euro): \u0219apte tramvaie, cu o valoare a achizi\u021biei de 61.658.350 lei, f\u0103r\u0103 TVA (73.373.436,5 lei, cu TVA, adic\u0103 16.451.443 euro).<\/li>\n<li>Lotul 2, aferent proiectului \u201eReabilitarea infrastructurii de tramvai \u00een Municipiul Ia\u0219i\u201d (3T) cu o valoare total\u0103 de 114.359.729,95 lei (aproape 24 milioane de euro): cinci tramvaie, cu o valoare a achizi\u021biei de 44.072.920 lei, f\u0103r\u0103 TVA (52.446.774,8 lei, cu TVA, adic\u0103 11.018.230 euro).<\/li>\n<li>Lotul 3, aferent proiectului \u201eReabilitarea infrastructurii de tramvai Ia\u0219i \u2013 Dancu\u201d cu o valoare total\u0103 de 104.022.632 lei (circa 22 milioane de euro): patru tramvaie, cu o valoare a achizi\u021biei de 35.233.000 lei, f\u0103r\u0103 TVA (41.927.270 lei, cu TVA, adic\u0103 8.808.250 euro).<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Acest din urm\u0103 lot fusese atribuit cu clauz\u0103 suspensiv\u0103, cele patru tramvaie urm\u00e2nd a fi livrate \u00een func\u021bie de semnarea contractului de finan\u021bare pentru proiectul \u201eReabilitarea infrastructurii de tramvai Ia\u0219i \u2013 Dancu\u201d. Astfel, odat\u0103 cu semnarea contractului de finan\u021bare european\u0103, primarul Mihai Chirica a semnat \u0219i contractul pentru furnizarea celor patru tramvaie incluse \u00een proiect.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">\n","protected":false},"excerpt":{"rendered":"<p>Primarul Mihai Chirica a semnat \u00een aceast\u0103 s\u0103pt\u0103m\u00e2n\u0103 contractul de lucr\u0103ri de construire aferent proiectului&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=48676\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":48678,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,10881,1400,40,13518],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/48676"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=48676"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/48676\/revisions"}],"predecessor-version":[{"id":48679,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/48676\/revisions\/48679"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/48678"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=48676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=48676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=48676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}