{"id":50770,"date":"2020-10-30T14:50:54","date_gmt":"2020-10-30T12:50:54","guid":{"rendered":"http:\/\/infois.ro\/?p=50770"},"modified":"2020-10-30T14:50:54","modified_gmt":"2020-10-30T12:50:54","slug":"cele-doua-pasaje-supraterane-din-intersectia-de-la-podu-ros-vor-fi-realizate-cu-fonduri-europene","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=50770","title":{"rendered":"Cele dou\u0103 pasaje supraterane din intersec\u0163ia de la Podu Ro\u015f vor fi realizate cu fonduri europene"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2020\/10\/pasaj-suprateran-podu-ros.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-50771\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2020\/10\/pasaj-suprateran-podu-ros.jpg\" alt=\"\" width=\"396\" height=\"206\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2020\/10\/pasaj-suprateran-podu-ros.jpg 640w, https:\/\/infois.ro\/wp-content\/uploads\/2020\/10\/pasaj-suprateran-podu-ros-300x156.jpg 300w\" sizes=\"(max-width: 396px) 100vw, 396px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Prim\u0103ria Municipiului Ia\u015fi anun\u0163\u0103 organizarea pe data de 3 decembrie a licita\u0163iei \u00een vederea \u00eentocmirii proiectului tehnic de realizare a celor dou\u0103 pasaje supraterane care urmeaz\u0103 s\u0103 fie construite \u00een intersec\u0163ia de la Podu Ro\u015f \u00een vederea decongestion\u0103rii traficului auto din zon\u0103. Potrivit primarului Mihai Chirica, fondurile necesare pentru realizarea investi\u0163iei \u201eFluidizare trafic intersec\u0163ia Podu Ro\u015f cu Splai Bahlui Mal Drept \u015fi Bulevardul Profesor Dimitrie Mangeron, prin dou\u0103 pasaje supraterane unidirec\u0163ionale cu o singur\u0103 band\u0103\u201d sunt asigurate prin Programul de rezilien\u0163\u0103 al Uniunii Europene pentru infrastructur\u0103, cu o valoare total\u0103 de \u015fapte miliarde de euro. Pentru \u00eentocmirea proiectului tehnic \u015fi a studiului de fezabilitate pentru cele dou\u0103 investi\u0163ii, bugetul municipalit\u0103\u0163ii este de 84 de milioane de lei, a anun\u0163at edilul, ast\u0103zi, \u00eentr-o conferin\u0163\u0103 de pres\u0103. Proiectul tehnic prevede ca pasajele s\u0103 fie construite\u00a0deasupra albiei\u00a0\u0219i\u00a0r\u00e2ul Bahlui \u0219i nu \u00een prelungirea actualelor benzi de circula\u021bie de pe cele dou\u0103 splaiuri. Potrivit documentului, pasajele vor avea\u00a0dou\u0103 sensuri giratorii suspendate, care vor asigura zone de \u00eentoarcere, pe ambele pasaje fiind circula\u021bie \u00een sens unic: cel de pe mal drept va asigura circula\u0163ia \u00een sens unic pe direc\u0163ia\u00a0Podul de Piatr\u0103\u00a0\u2013\u00a0bd. Tudor Vladimirescu, iar cel de pe mal st\u00e2ng pe direc\u0163ia\u00a0bd. Mangeron\u00a0\u2013\u00a0Podul de Piatr\u0103. Fiecare pasaj va avea o l\u0103\u0163ime de\u00a0\u015fapte metri, lungimea fiind \u00eens\u0103 difer\u0103. Astfel, pasajul mal drept va avea o lungime de 552 de metri, iar cel de pe mal st\u00e2ng ajunge 547 de metri. Pasajele vor avea o zon\u0103 de siguran\u021b\u0103 pe o l\u0103\u021bime de 1,5 metri (refugiu \u00een caz de avarii), o pist\u0103 de biciclete cu o l\u0103\u0163ime de 1,5 metri, iar restul va fi destinat circula\u021biei rutiere. Pasajele nu vor avea trotuare, circula\u021bia urm\u00e2nd s\u0103 fie deschis\u0103 exclusiv autovehiculelor \u0219i bicicletelor. Amplasamentul propus pentru executarea obiectivului de investi\u0163ie se \u00eencadreaz\u0103 \u00eentr-o suprafa\u0163\u0103 de circa 16.000 mp, zon\u0103 de \u015fes situat\u0103 \u00een proximitatea albiei Baluiului \u015fi delimitat\u0103 de parcul de l\u00e2ng\u0103 Biserica Lipoveneasc\u0103, sensul giratoriu propriu-zis al intersec\u0163iei Podu Ro\u015f, esplanada c\u0103tre \u015fos. Nicoli\u00adna \u015fi Facultatea de Construc\u0163ii \u00eempreun\u0103 cu parcul aferent. Primarul Mihai Chirica a anun\u0163at c\u0103 proiectul tehnic ar trebui s\u0103 fie gata p\u00e2n\u0103 la sf\u00e2r\u015fitul anului 2021, \u00een timp ce data limit\u0103 pentru finalizarea investi\u0163iei este 31 decembrie 2026.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Prim\u0103ria Municipiului Ia\u015fi anun\u0163\u0103 organizarea pe data de 3 decembrie a licita\u0163iei \u00een vederea \u00eentocmirii&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=50770\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":50771,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,40,846,6816,4721,9624],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/50770"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=50770"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/50770\/revisions"}],"predecessor-version":[{"id":50772,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/50770\/revisions\/50772"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/50771"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=50770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=50770"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=50770"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}