{"id":51345,"date":"2020-11-23T18:48:08","date_gmt":"2020-11-23T16:48:08","guid":{"rendered":"http:\/\/infois.ro\/?p=51345"},"modified":"2020-11-23T18:30:21","modified_gmt":"2020-11-23T16:30:21","slug":"restrictii-si-devieri-de-circulatie-rutiera-in-zona-tudor-vladimirescu","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=51345","title":{"rendered":"Restric\u0163ii \u015fi devieri de circula\u0163ie rutier\u0103 \u00een zona Tudor Vladimirescu"},"content":{"rendered":"<p style=\"text-align: justify;\"><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2020\/11\/lucrari-tudor-vladimirescu.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-51066\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2020\/11\/lucrari-tudor-vladimirescu.jpg\" alt=\"\" width=\"358\" height=\"238\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2020\/11\/lucrari-tudor-vladimirescu.jpg 640w, https:\/\/infois.ro\/wp-content\/uploads\/2020\/11\/lucrari-tudor-vladimirescu-300x199.jpg 300w\" sizes=\"(max-width: 358px) 100vw, 358px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">\u00cen cursul nop\u0163ilor de luni, 23 noiembrie, spre mar\u021bi, 24 noiembrie, \u015fi, respective, a celei de mar\u021bi, 24 noiembrie, spre miercuri, 25 noiembrie, \u00eentre orele 21.00 \u0219i 6.00, constructorii contracta\u021bi de municipalitate (asocierea SC Conest &#8211; SC Marivila Com SRL) vor face o serie de lucr\u0103ri necesare pentru racordarea intersec\u021biilor dintre bd. Chimiei \u0219i bd. Prof. Dimitrie Mangeron \u0219i dintre Splai Bahlui Mal Drept \u0219i rampele Podului Tudor Vladimirescu.<\/p>\n<p style=\"text-align: justify;\">\u00a0Interven\u021biile constructorilor vor genera o serie de restric\u021bii \u0219i devieri de circula\u021bie rutier\u0103, dup\u0103 cum urmeaz\u0103:<\/p>\n<p style=\"text-align: justify;\">\n<ul style=\"text-align: justify;\">\n<li>luni, 23 noiembrie, spre mar\u021bi, 24 noiembrie: pe sensul dinspre Calea Chi\u0219in\u0103ului spre Buc\u0219inescu \u0219i Splai Bahlui Mal Drept circula\u021bia se va face pe linia de tramvai; pe traseul Pod Metalurgiei &#8211; Bulevardul Chimiei c\u0103tre Pod Tudor Vladimirescu circula\u021bia va fi deviat\u0103 c\u0103tre str. Vasile Lupu, iar accesul riveranilor se va face de pe bd. Chimiei c\u0103tre aleea Vasile Petrescu \u2013 aleea Profesor Gheorghe Alexa cu ie\u0219ire \u00een bd. Tudor Vladimirescu \u0219i obligatoriu dreapta c\u0103tre Buc\u0219inescu;<\/li>\n<li>mar\u021bi, 24 noiembrie, spre miercuri, 25 noiembrie: traseul bd. Chimiei \u2013 bd. Tudor Vladimirescu &#8211; Splai Bahlui Mal Drept &#8211; bd. Prim\u0103verii va fi deviat pe traseul bd. Chimiei \u2013 bd. Prof. Dimitrie Mangeron &#8211; Podu Ro\u0219 &#8211; bd. \u021au\u021bora; pe sensul dinspre Calea Chi\u0219in\u0103ului spre Buc\u0219inescu \u0219i Splai Bahlui Mal Drept circula\u021bia se va face pe linia de tramvai.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">Interven\u021biile men\u021bionate au avizele Companiei Na\u021bionale de Administrare a Infrastructurii Rutiere (Sec\u021bia Drumuri Na\u021bionale Ia\u0219i &#8211; Direc\u021bia Regional\u0103 de Drumuri \u0219i Poduri Ia\u0219i), Poli\u021biei Rom\u00e2ne (Serviciul Rutier Ia\u0219i) \u0219i Prim\u0103riei Municipiului Ia\u0219i.<\/p>\n<p style=\"text-align: justify;\">Lucr\u0103rile de modernizare a bulevardului Tudor Vladimirescu cuprind urm\u0103toarele activit\u0103\u021bi: execu\u021bia lucr\u0103rilor de construc\u021bii \u0219i instala\u021bii aferente liniei de tramvai pe traseul Buc\u0219inescu \u2013 bd. Tudor Vladimirescu \u2013 intersec\u021bie Calea Chi\u0219in\u0103ului (cu o lungime de 2.444 de metri de cale simpl\u0103 de rulare), reabilitarea celor dou\u0103 peroane din sta\u021bia Tudor Vladimirescu, reabilitarea podului Tudor Vladimirescu (pe o suprafa\u021b\u0103 de 1.196 metri p\u0103tra\u021bi) \u0219i construirea a dou\u0103 sta\u021bii de tramvai.<\/p>\n<p style=\"text-align: justify;\">Proiectul general include \u0219i achizi\u021bionarea a \u0219apte tramvaie.<\/p>\n<p style=\"text-align: justify;\">Valoarea total\u0103 a proiectului este 114.197.308,33 lei (aproape 24 de milioane de euro), iar suma este asigurat\u0103 prin Programul Opera\u021bional Regional \u2013 Axa 4.1.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00cen cursul nop\u0163ilor de luni, 23 noiembrie, spre mar\u021bi, 24 noiembrie, \u015fi, respective, a celei&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=51345\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":51066,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,9590,40,13874,5938],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/51345"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=51345"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/51345\/revisions"}],"predecessor-version":[{"id":51346,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/51345\/revisions\/51346"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/51066"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=51345"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=51345"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=51345"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}