{"id":62086,"date":"2022-05-03T15:48:06","date_gmt":"2022-05-03T12:48:06","guid":{"rendered":"http:\/\/infois.ro\/?p=62086"},"modified":"2022-05-03T15:48:06","modified_gmt":"2022-05-03T12:48:06","slug":"proiectul-smart-grid-carmen-a-devenit-oficial-proiect-de-interes-comun-al-uniunii-europene","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=62086","title":{"rendered":"Proiectul Smart Grid CARMEN a devenit oficial Proiect de Interes Comun al Uniunii Europene"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/05\/smart-grid-carmen.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-62087\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/05\/smart-grid-carmen.jpg\" alt=\"\" width=\"455\" height=\"256\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2022\/05\/smart-grid-carmen.jpg 640w, https:\/\/infois.ro\/wp-content\/uploads\/2022\/05\/smart-grid-carmen-300x169.jpg 300w, https:\/\/infois.ro\/wp-content\/uploads\/2022\/05\/smart-grid-carmen-140x80.jpg 140w\" sizes=\"(max-width: 455px) 100vw, 455px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Proiectul Smart Grid Carpathian Modernized Energy Network (CARMEN), dezvoltat de c\u0103tre Delgaz Grid SA \u0219i CNTEE Transelectrica SA \u00een parteneriat cu operatorul de transport maghiar, MAVIR Magyar Villamosenergia-ipari\u00c1tviteliRendszerir\u00e1ny\u00edt\u00f3ZRt, a primit aprobarea final\u0103 de la Uniunea European\u0103, fiind inclus pe lista a cincea a Proiectelor energetice de Interes Comun (PIC). \u00cen 29 aprilie 2022 a intrat \u00een vigoare Regulamentul delegat al Comisiei, 564\/2022 din 19 noiembrie 2021,\u00een urma aprob\u0103rii de c\u0103tre Parlamentul European\u0219i Consiliu,prin care Proiectul CARMEN devine oficial Proiect de Interes Comun \u00een aria tematic\u0103 Smart Grid.<\/p>\n<p style=\"text-align: justify;\">Proiectele de Interes Comunsunt proiecte-cheie de infrastructur\u0103 energetic\u0103 transfrontalier\u0103 pentru construirea unei pie\u021be europene interne a energiei mai integrat\u0103 \u0219i mai rezilien\u021b\u0103 \u0219i pentru urm\u0103rirea obiectivelor \u00een materie de energie \u0219i clim\u0103. Actuala List\u0103 PIC cuprinde 98 de proiecte: 67 de proiecte \u00een domeniul transportului \u0219i stoc\u0103rii energiei electrice, 20 \u00een domeniul gazelor naturale, 6 proiecte de re\u021bele de CO2 \u0219i 5 proiecte de re\u021bele electrice inteligente.<\/p>\n<p style=\"text-align: justify;\">Proiectul CARMEN are o valoare de aproximativ 150 milioane euro, cererea de finan\u021bareurm\u00e2nd a fi depus\u0103 \u00een a doua jum\u0103tate a anului 2022. Implementarea se va derula pe o perioad\u0103de 6 ani, \u00eencep\u00e2nd cu anul 2023 \u0219i p\u00e2n\u0103 \u00een 2028.<\/p>\n<p style=\"text-align: justify;\">\u201eFaptul c\u0103 proiectul CARMEN a ob\u021binut statutul de Proiect de Interes Comuneste un real succes pentru compania noastr\u0103, fiind cel mai ambi\u021bios proiect de investi\u021bii al Rom\u00e2niei \u00een infrastructura de distribu\u021bie a energiei electrice din Regiunea Nord-Est. Suntem recunosc\u0103tori colegilor din Delgaz Grid \u0219i partenerilor no\u0219tri dela Transelectrica \u0219i MAVIR pentru eforturile depuse care au condus la acest rezultat.Avem convingerea c\u0103 proiectul CARMEN va deveni un model de bun\u0103 practic\u0103 din punct de vedere al colabor\u0103rii dintre actorii sectorului electroenergetic, \u00een perspectiva adapt\u0103rii la cerin\u021beleeuropene privinddecarbonificarea, digitalizarea \u0219i securitatea energetic\u0103\u201d, declar\u0103 Volker Raffel, CEO al E.ON Rom\u00e2nia.<\/p>\n<p style=\"text-align: justify;\">\u201eOb\u021binerea calit\u0103\u021bii de Proiect de Interes Comun pentru proiectul CARMEN marcheaz\u0103 un punct de referin\u021b\u0103 \u00een ceea ce prive\u0219te dezvoltarea infrastructurii energetice transfrontaliere \u00een contextul cooper\u0103rii operatorilor de transport \u0219i distribu\u021bie. Pentru a face fa\u021b\u0103 tuturor transform\u0103rilor din sectorul energetic sus\u021binute de agenda european\u0103, este necesar\u0103 o abordare global\u0103, \u00een spiritul colabor\u0103rii \u0219i al \u00eemp\u0103rt\u0103\u0219irii informa\u021biilor. Ne afl\u0103m \u00een contextul \u00een care doar implement\u00e2nd interoperabilitatea \u00eentre sistemele noastre, printr-o cooperare pragmatic\u0103 \u0219i curajoas\u0103, putem adapta re\u021belele la noile configura\u021bii ale sistemelor electroenergetice \u00een contextul tranzi\u021biei energetice. Suntem m\u00e2ndri c\u0103 Transelectrica este parte a acestui obiectiv investi\u021bional de importan\u021b\u0103 major\u0103 la nivel european \u0219i le mul\u021bumim partenerilor no\u0219tri din cadrul Delgaz Grid pentru colaborarea extraordinar\u0103 \u00een efortul de a da via\u021b\u0103 acestui proiect\u201d, afirm\u0103 Gabriel Andronache, CEO al CNTEE Transelectrica SA.<\/p>\n<p style=\"text-align: justify;\">Prin intermediul proiectului CARMEN, partenerii vizeaz\u0103 modernizarea \u0219i dezvoltarea re\u021belelor de transport \u0219i de distribu\u021bie energie electric\u0103, precum \u0219i cre\u0219terea interoperabilit\u0103\u021bii acestora, at\u00e2t la nivel na\u021bional, c\u00e2t \u0219i european, \u00een sensul atingerii obiectivelor de interes comun.<\/p>\n<p style=\"text-align: justify;\">Astfel, se estimeaz\u0103 modernizarea de sta\u021bii \u0219i posturi de transformare, a liniilor aeriene de \u00eenalt\u0103 tensiune, implementarea tehnologiilor IT \u0219i de comunica\u021bii specifice, precum \u0219i instalarea \u00een re\u021beaua electric\u0103 de transport a unor mijloace moderne de control al tensiunii la nivelul sistemului energetic.<\/p>\n<p style=\"text-align: justify;\">CARMEN va contribui \u00een mod direct la cre\u0219terea capacit\u0103\u021bii de preluare \u00een re\u021beaua de joas\u0103 tensiune a electricit\u0103\u021bii produse din surse regenerabile de c\u0103tre prosumatori, proiectul reprezent\u00e2nd un pas extrem de important \u00een direc\u021bia acceler\u0103rii decarbonific\u0103rii \u015fi digitaliz\u0103rii re\u021belei de transport \u015fi distribu\u021bie a energiei electrice gestionate de cei trei parteneri.<\/p>\n<p style=\"text-align: justify;\">\n","protected":false},"excerpt":{"rendered":"<p>Proiectul Smart Grid Carpathian Modernized Energy Network (CARMEN), dezvoltat de c\u0103tre Delgaz Grid SA \u0219i&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=62086\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":62087,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[333,410,40,15282],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/62086"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=62086"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/62086\/revisions"}],"predecessor-version":[{"id":62088,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/62086\/revisions\/62088"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/62087"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=62086"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=62086"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=62086"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}