{"id":63918,"date":"2022-07-12T12:59:57","date_gmt":"2022-07-12T09:59:57","guid":{"rendered":"http:\/\/infois.ro\/?p=63918"},"modified":"2022-07-12T12:59:57","modified_gmt":"2022-07-12T09:59:57","slug":"cnair-anunta-scoaterea-la-licitatie-a-contractelor-pentru-constructia-tronsonului-bacau-pascani-al-autostrazii-a7","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=63918","title":{"rendered":"CNAIR anun\u021b\u0103 scoaterea la licita\u021bie a contractelor pentru construc\u021bia tronsonului Bac\u0103u \u2013 Pa\u0219cani al Autostr\u0103zii A7"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/07\/autostrada-bacau-pascani.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-63919\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/07\/autostrada-bacau-pascani.jpg\" alt=\"\" width=\"443\" height=\"234\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2022\/07\/autostrada-bacau-pascani.jpg 640w, https:\/\/infois.ro\/wp-content\/uploads\/2022\/07\/autostrada-bacau-pascani-300x158.jpg 300w\" sizes=\"(max-width: 443px) 100vw, 443px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Compania Na\u021bional\u0103 de Autostr\u0103zi \u0219i Infrastructur\u0103 Rutier\u0103 (CNAIR) a transmis ast\u0103zi spre validare la Agen\u021bia Na\u021bional\u0103 pentru Achizi\u021bii Publice (ANAP) documenta\u021biile \u00een vederea atribuirii contractelor necesare pentru construc\u021bia celor trei loturi tronsonului Bac\u0103u-Pa\u0219cani al Autostr\u0103zii Moldova (A7), cu o lungime de 77,39 de kilometri.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Valoarea estimat\u0103 a celor trei contracte finan\u021bate prin Planul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR) este de 5,858 miliarde de lei (f\u0103r\u0103 TVA).<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">* Lotul 1 (30,3 km), cuprins \u00eentre S\u0103uce\u0219ti (Bac\u0103u) \u0219i Trife\u0219ti, are o valoare estimat\u0103 de 2,04 miliarde de lei (f\u0103r\u0103 TVA).<\/p>\n<p style=\"text-align: justify;\">* Lotul 2 (18,99 km), cuprins \u00eentre Trife\u0219ti \u0219i Gher\u0103ie\u0219ti, are o valoare estimat\u0103 de 1,60 miliarde de lei (f\u0103r\u0103 TVA).<\/p>\n<p style=\"text-align: justify;\">* Lotul 3 (28,09 km), cuprins \u00eentre Mirce\u0219ti \u0219i Pa\u0219cani, are o valoare estimate de 2,21 miliarde de lei (f\u0103r\u0103 TVA).<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Constructorii care vor c\u00e2\u0219tiga aceste contracte trebuie s\u0103 finalizeze lucr\u0103rile \u00een cel mult 30 de luni.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Potrivit legii, ANAP are la dispozi\u021bie maximum zece zile, conform legii, pentru verificarea documentelor, iar dup\u0103 validare CNAIR va putea lansa licita\u021biile propriu-zise ale contractelor pentru execu\u021bia lucr\u0103rilor.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Compania Na\u021bional\u0103 de Autostr\u0103zi \u0219i Infrastructur\u0103 Rutier\u0103 (CNAIR) a transmis ast\u0103zi spre validare la Agen\u021bia&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=63918\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":63919,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,41],"tags":[74,2755,12303,40,846],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/63918"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=63918"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/63918\/revisions"}],"predecessor-version":[{"id":63920,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/63918\/revisions\/63920"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/63919"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=63918"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=63918"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=63918"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}