{"id":64686,"date":"2022-08-16T15:02:56","date_gmt":"2022-08-16T12:02:56","guid":{"rendered":"http:\/\/infois.ro\/?p=64686"},"modified":"2022-08-17T09:04:51","modified_gmt":"2022-08-17T06:04:51","slug":"reteaua-de-canalizare-a-comunei-miroslava-va-fi-extinsa-cu-fonduri-din-programul-guvernamental-anghel-saligny","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=64686","title":{"rendered":"Re\u021beaua de canalizare a comunei Miroslava va fi extins\u0103 cu fonduri din Programul guvernamental \u201cAnghel Saligny\u201d"},"content":{"rendered":"<p><a href=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/08\/canalizare-miroslava.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-64687\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/08\/canalizare-miroslava.jpg\" alt=\"\" width=\"382\" height=\"274\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2022\/08\/canalizare-miroslava.jpg 640w, https:\/\/infois.ro\/wp-content\/uploads\/2022\/08\/canalizare-miroslava-300x215.jpg 300w\" sizes=\"(max-width: 382px) 100vw, 382px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Comuna Miroslava din jude\u021bul Ia\u0219i a ob\u021binut o finan\u021bare \u00een valoare de de 38 milioane lei \u00een vederea extinderii re\u021belei de canalizare. Fondurile sunt asigurate prin Programul Na\u021bional de Investi\u021bii \u201eAnghel Saligny\u201d, cererea de finan\u021bare fiind depus\u0103 \u00een luna noiembrie 2021. Lucr\u0103rile se vor desf\u0103\u0219ura \u00een satele G\u0103ureni, Miroslava, Uricani, Valea Ad\u00e2nc\u0103, Valea Ursului \u0219i Vorove\u0219ti, urm\u00e2nd a fi realizate \u00een aproximativ doi ani, a anun\u021bat primarul Dan Ni\u021b\u0103, \u00eentr-o postare pe pagina proprie de socializare.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">\u201c\u00cen aproximativ trei ani, canalizarea nu va mai fi o problem\u0103 \u00een comuna Miroslava. Vom reu\u0219i acest lucru prin intermediul a trei proiecte majore, finan\u021bate prin intermediul Programului Opera\u021bional Infrastructur\u0103 Mare, Programului Na\u021bional de Investi\u021bii \u201eAnghel Saligny\u201d, respectiv Programului Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103. Primul proiect, realizat de ApaVital, este deja \u00een desf\u0103\u0219urare. \u00cen cazul celui de-al doilea proiect urmeaz\u0103 ca \u00een cel mult dou\u0103 luni s\u0103 semn\u0103m contractul de finan\u021bare \u0219i s\u0103 d\u0103m ordinul de \u00eencepere a lucr\u0103rilor. Sper\u0103m s\u0103 ob\u021binem finan\u021barea c\u00e2t mai repede \u0219i pentru cel de-al treilea proiect\u201d, afirm\u0103 primarul Dan Ni\u021b\u0103.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><strong>PROGRAMUL OPERA\u021aIONAL INFRASTRUCTUR\u0102 MARE<\/strong><\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Primul proiect de acest fel este deja \u00een desf\u0103\u0219urare \u0219i vizeaz\u0103 satele Balciu, Horpaz, Miroslava \u0219i Valea Ad\u00e2nc\u0103. Acesta este realizat de ApaVital, prin Programul Opera\u021bional Infrastructur\u0103 Mare. Valoarea contractului este de circa 33,8 milioane lei, durata de execu\u021bie fiind de 20 de luni de la ordinul de \u00eencepere a lucr\u0103rilor. \u00cen total vor fi realiza\u021bi 23.189 metri de re\u021bea de canalizare, 15 sta\u021bii de pompare, 931 de racorduri \u0219i 7.229 metri de conducte de refulare ape uzate.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><strong>PROGRAMUL NA\u021aIONAL DE INVESTI\u021aII \u201eANGHEL SALIGNY\u201d<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>\u00a0<\/strong><\/p>\n<p style=\"text-align: justify;\">Proiectul desf\u0103\u0219urat prin Programul Na\u021bional de Investi\u021bii \u201eAnghel Saligny\u201d va \u00eensemna efectuarea de lucr\u0103ri \u00een satele G\u0103ureni, Miroslava, Uricani, Valea Ad\u00e2nc\u0103, Valea Ursului \u0219i Vorove\u0219ti. La licita\u021bia pentru achizi\u021bia serviciilor de proiectare \u0219i execu\u021bie lucr\u0103ri au depus oferte cinci asocieri de firme, procedura afl\u00e2ndu-se \u00een etapa final\u0103 a evalu\u0103rii tehnico-economice. La final vor fi realiza\u021bi 31.205 metri de re\u021bea de canalizare gravita\u021bional\u0103, 5.353 metri de conducte de refulare \u0219i 13 sta\u021bii de pompare ape uzate.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><strong>PROGRAMUL NA\u021aIONAL DE REDRESARE \u0218I REZILIEN\u021a\u0102<\/strong><\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Al treilea proiect urmeaz\u0103 a fi realizat prin intermediul Programului Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 \u0219i vizeaz\u0103 extinderea sistemului de canalizare pe str\u0103zile din celelalte zone aglomerate care nu au fost incluse \u00een primele dou\u0103 proiecte.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Cele trei proiecte vor fi de durat\u0103 \u0219i vor presupune inclusiv devieri de circula\u021bie \u0219i racord\u0103ri ale propriet\u0103\u021bilor. Prim\u0103ria Comunei Miroslava roag\u0103 insistent locatarii de pe str\u0103zile incluse \u00een cadrul proiectelor men\u021bionate s\u0103 realizeze c\u00e2t mai repede racordarea propriet\u0103\u021bilor la celelalte sisteme de utilit\u0103\u021bi, adic\u0103 ap\u0103 potabil\u0103, gaze naturale \u0219i energie electric\u0103. Carosabilul va fi adus la forma ini\u021bial\u0103 doar dup\u0103 finalizarea lucr\u0103rilor privind utilit\u0103\u021bile ale tuturor propriet\u0103\u021bilor de pe respectivele str\u0103zi.<\/p>\n<p style=\"text-align: justify;\">\n","protected":false},"excerpt":{"rendered":"<p>Comuna Miroslava din jude\u021bul Ia\u0219i a ob\u021binut o finan\u021bare \u00een valoare de de 38 milioane&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=64686\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":64687,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,40,1503,15650,3112,15661],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/64686"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=64686"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/64686\/revisions"}],"predecessor-version":[{"id":64688,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/64686\/revisions\/64688"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/64687"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=64686"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=64686"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=64686"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}