{"id":6553,"date":"2013-07-29T14:10:05","date_gmt":"2013-07-29T11:10:05","guid":{"rendered":"http:\/\/infois.ro\/?p=6553"},"modified":"2013-07-29T14:10:05","modified_gmt":"2013-07-29T11:10:05","slug":"sinele-de-tramvai-puse-pe-pozitii-in-rondul-de-la-piata-mihai-eminescu","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=6553","title":{"rendered":"\u0218inele de tramvai, puse pe pozi\u021bii \u00een rondul de la Pia\u021ba \u201dMihai Eminescu\u201d"},"content":{"rendered":"<p style=\"text-align: justify;\"><a class=\"highslide\" onclick=\"return vz.expand(this)\" href=\"http:\/\/infois.ro\/wp-content\/uploads\/2013\/07\/sine.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-large wp-image-6554\" title=\"sine\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/cache\/2013\/07\/sine\/3235952131.jpg\" alt=\"\" width=\"600\" height=\"449\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Lucr\u0103rile la pasajul subteran de la Funda\u021bie continu\u0103 \u00eentr-un ritm sus\u021binut, av\u00e2nd \u00een vedere c\u0103 investi\u021bia se afl\u0103 \u00eentr-o oarecare \u00eent\u00e2rziere, cauzat\u0103, printre altele, \u0219i de vestigiile descoperite \u00een zon\u0103, care au necesitat evaluarea lor, potrivit legii, de c\u0103tre speciali\u0219ti. \u00cen urma vizitei de lucru efectuate la sf\u00e2r\u0219itul s\u0103pt\u0103m\u00e2nii trecute de primarul Gheorghe Nichita, constructorul a promis c\u0103 muncitorii vor lucra zi lumin\u0103 pentru recuperarea restan\u021belor fa\u021b\u0103 de graficul ini\u021bial al lucr\u0103rilor, astfel \u00eenc\u00e2t investi\u021bia s\u0103 poat\u0103 fi finalizat\u0103 la timp. \u00centre timp, lucr\u0103torii din cadrul Regiei Autonome de Transport Public au montat \u0219inele de tramvai peste deasupra pasajului, care urmeaz\u0103 s\u0103 fac\u0103 leg\u0103tura \u00eentre strada Gavril Musicescu \u015fi Copou. Astfel, liniile de tramvai au fost aduse p\u00e2n\u0103 \u00een dreptul Bibliotecii Centrale Universitare. Mai mult, constructorii au scos \u015fina de l\u00e2ng\u0103 statuia lui Eminescu. Inten\u0163ia edililor \u015fi a constructorilor este ca lucr\u0103rile la \u015fin\u0103 s\u0103 fie finalizate p\u00e2n\u0103 \u00een toamn\u0103, astfel \u00eenc\u00e2t, la reluarea cursurilor, elevii \u015fi studen\u0163ii s\u0103 poat\u0103 urca Copoul \u015fi \u00een tramvaie. \u00cen paralel, continu\u0103 lucr\u0103rile la pasajul subteran, o mare parte a \u00a0muncitorilor \u015fi utilajelor fiind relocate la por\u0163iunea de pasaj de pe bulevardul Independen\u0163ei. Potrivit declara\u0163iile constructorilor, finalizarea acestei p\u0103r\u0163i a pasajului este programat\u0103 pentru jum\u0103tatea lunii august, urm\u00e2nd ca ulterior echipajele s\u0103 se mute pe por\u0163iunea din mijloc, ultima r\u0103mas\u0103 a fi construit\u0103. Realizarea pasajului subteran \u201cMihai Eminescu\u201d face parte din cadrul proiectului \u201eDezvoltarea axei de transport est-vest in municipiul Ia\u015fi\u201d, \u00een valoare total\u0103 de 21 milioane de euro. Proiectul prevede construirea \u00een zona Funda\u0163ie \u2013 R\u00e2pa Galben\u0103 a unui pasaj subteran cu lungimea de 286 metri, l\u0103\u0163imea de 10 metri \u015fi \u00een\u0103l\u0163imea de cinci metri, cu c\u00e2te dou\u0103 benzi pe fiecare sens de circula\u0163ie \u015fi rampe de acces dinspre str. P\u0103curari \u015fi B-dul Independen\u0163ei. Cu aceast\u0103 ocazie va fi ref\u0103cut\u0103 \u00eentreaga re\u0163ea stradal\u0103 pe \u015fos. P\u0103curari, str. P\u0103curari, zona Pie\u0163ei Eminescu, str. Elena Doamna, se va reface \u015fi moderniza trama stradal\u0103 prin reabilitarea spa\u0163iilor pietonale aferente acestor str\u0103zi, vor fi amenajate piste de bicicli\u015fti, se va \u00eembun\u0103t\u0103\u0163i sistemul de marcaj rutier, dar va fi reabilitat\u0103 \u015fi linia de tramvai pe str. Elena Doamna pe un tronson de 1186 metri liniari de cale simpl\u0103. Se vor amenaja de asemenea peste 10.000 mp de spa\u0163ii verzi \u00een arealul proiectului. Conform proiectului, lucr\u0103rile ar trebui s\u0103 fie finalizate \u00een aproximativ doi ani de la semnarea contractului, respective \u00een toamna anului 2014.\u00a0<em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lucr\u0103rile la pasajul subteran de la Funda\u021bie continu\u0103 \u00eentr-un ritm sus\u021binut, av\u00e2nd \u00een vedere c\u0103&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=6553\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":6554,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,1519,530,296,2775],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/6553"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6553"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/6553\/revisions"}],"predecessor-version":[{"id":6555,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/6553\/revisions\/6555"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/6554"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6553"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6553"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6553"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}