{"id":67750,"date":"2022-12-20T11:02:16","date_gmt":"2022-12-20T09:02:16","guid":{"rendered":"http:\/\/infois.ro\/?p=67750"},"modified":"2022-12-20T11:02:16","modified_gmt":"2022-12-20T09:02:16","slug":"municipiul-iasi-va-achizitiona-inca-18-tramvaie-noi-prin-planul-national-de-redresare-si-rezilienta","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=67750","title":{"rendered":"Municipiul Ia\u015fi va achizi\u0163iona \u00eenc\u0103 18 tramvaie noi prin Planul Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-56802 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2021\/08\/doua-tramvaie-pesa-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2021\/08\/doua-tramvaie-pesa-300x200.jpg 300w, https:\/\/infois.ro\/wp-content\/uploads\/2021\/08\/doua-tramvaie-pesa.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p style=\"text-align: justify;\">Ministerul Dezvolt\u0103rii, Lucr\u0103rilor Publice \u0219i Administra\u021biei a aprobat finan\u021barea achizi\u021bion\u0103rii pentru Municipiul Ia\u0219i, prin intermediul Planului Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR) \u2013 Componenta 10 \u201eFondul Local\u201d, a unui num\u0103r de 18 tramvaie noi cu lungimea de 22 de metri. Proiectul are o valoare total\u0103 de 177.217.200 de lei, f\u0103r\u0103 TVA, respectiv 210.888.468,00 lei, cu TVA, adic\u0103 aproape 43 de milioane de euro.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">\u00cen alt\u0103 ordine de idei, Ministerul Dezvolt\u0103rii a aprobat prin intermediul PNRR \u2013 Componenta 5 \u201eValul Renov\u0103rii\u201d a proiectelor de reabilitare termic\u0103 a cl\u0103dirilor a trei unit\u0103\u021bi \u0219colare din Municipiul Ia\u0219i. Este vorba de proiectele care vizeaz\u0103 \u0218coala Primar\u0103 \u201ePetru Poni\u201d &#8211; Corp C1 (din structura \u0218colii Gimnaziale \u201eIon Creang\u0103\u201d), \u00een valoare de 3.036.325,29 lei, Liceul Tehnologic de Transporturi \u0219i de Construc\u021bii Ia\u0219i &#8211; Corp C1 C\u0103min, \u00een valoare de 8.804.827,86 lei, \u0219i Gr\u0103dini\u021ba PN 15 &#8211; Corp C1, \u00een valoare de 1.907.369,03 lei.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Valoarea total\u0103 a proiectelor depuse de Prim\u0103ria Municipiului Ia\u0219i, la care se adaug\u0103 cele dou\u0103 spitale din subordine (de Recuperare \u0219i \u201eDr. C. I. Parhon\u201d, pe diverse componente ale PNRR \u0219i aflate \u00een diverse stadii (contractate, \u00een curs de contractare sau \u00een evaluare) este de circa 793 de milioane de lei, adic\u0103 aproximativ 160,5 milioane de euro.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Fondurile ob\u021binute prin PNRR sunt o oportunitate extraordinar\u0103 at\u00e2t pentru a face noi investi\u021bii \u00een modernizarea transportului public, c\u00e2t \u0219i \u00een proiecte de reabilitare termic\u0103 \u0219i eficientizare energetic\u0103 la unit\u0103\u021bi de \u00eenv\u0103\u021b\u0103m\u00e2nt preuniversitar \u0219i la blocuri de locuin\u021be, precum \u0219i pentru construirea de locuin\u021be pentru tineri. Avem \u0219i alte proiecte depuse \u0219i v\u0103 vom \u021bine la curent pe m\u0103sur\u0103 ce acestea sunt aprobate \u0219i semnate.<\/p>\n<p style=\"text-align: justify;\">\n","protected":false},"excerpt":{"rendered":"<p>Ministerul Dezvolt\u0103rii, Lucr\u0103rilor Publice \u0219i Administra\u021biei a aprobat finan\u021barea achizi\u021bion\u0103rii pentru Municipiul Ia\u0219i, prin intermediul&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=67750\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":56802,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,40,15116,555,388],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/67750"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=67750"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/67750\/revisions"}],"predecessor-version":[{"id":67751,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/67750\/revisions\/67751"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/56802"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=67750"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=67750"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=67750"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}