{"id":67831,"date":"2022-12-22T19:11:34","date_gmt":"2022-12-22T17:11:34","guid":{"rendered":"http:\/\/infois.ro\/?p=67831"},"modified":"2022-12-23T11:13:32","modified_gmt":"2022-12-23T09:13:32","slug":"documentatiile-pentru-constructia-sectiunilor-i-si-iii-din-autostrada-a8-trimise-spre-validare-la-anap","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=67831","title":{"rendered":"Documenta\u0163iile pentru construc\u0163ia sec\u0163iunilor I \u015fi III din autostrada A8, trimise spre validare la ANAP"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-67832 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2022\/12\/documentatii-proiectare-sectiuni-a8-390x287.jpg\" alt=\"\" width=\"390\" height=\"287\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2022\/12\/documentatii-proiectare-sectiuni-a8-390x287.jpg 390w, https:\/\/infois.ro\/wp-content\/uploads\/2022\/12\/documentatii-proiectare-sectiuni-a8.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\">Compania Na\u0163ional\u0103 de Administrare a Infrastructurii Rutiere (CNAIR) a trimis spre validare Agen\u0163iei Na\u0163ionale pentru Achizi\u0163ii Publice (ANAP) documenta\u021biile pentru construc\u021bia sec\u021biunilor din autostrada A8, finan\u021bate prin Planul Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 (PNRR).<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Anun\u0163ul a fost f\u0103cut de Cristian Pistol, directorul general al CNAIR \u00eentr-un mesaj postat pe pagina proprie de socializare. Este vorba despre sec\u021biunea I (\u00een lungime de 24,4 kilometri): T\u00e2rgu Mure\u0219 \u2013 Miercurea Nirajului \u0219i leg\u0103tura cu Autostrada A3 \u015fi, respectiv, de sec\u0163iunea III (\u00een lungime de 29,91 kilometri): Leghin \u2013 T\u00e2rgu Neam\u021b (Mo\u021bca).<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Dup\u0103 validarea documenta\u021biilor vom putea lansa \u00een licita\u021bie contractele pentru proiectarea \u0219i execu\u021bia acestor sec\u021biuni din Autostrada Unirii (A8), a precizat directorul general al CNAIR, care a ad\u0103ugat c\u0103 ANAP are la dispozi\u021bie maxim zece zile, conform legii, pentru a finaliza verificarea documenta\u021biilor de atribuire.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Durata fiecarui contract este de 30 de luni, din care 6 luni pentru etapa de proiectare \u0219i 24 de luni pentru etapa de execu\u021bie a lucr\u0103rilor.<\/p>\n<p style=\"text-align: justify;\">\n","protected":false},"excerpt":{"rendered":"<p>Compania Na\u0163ional\u0103 de Administrare a Infrastructurii Rutiere (CNAIR) a trimis spre validare Agen\u0163iei Na\u0163ionale pentru&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=67831\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":67832,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,11463,12303,6227,40],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/67831"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=67831"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/67831\/revisions"}],"predecessor-version":[{"id":67833,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/67831\/revisions\/67833"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/67832"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=67831"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=67831"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=67831"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}