{"id":69170,"date":"2023-03-05T10:45:39","date_gmt":"2023-03-05T08:45:39","guid":{"rendered":"http:\/\/infois.ro\/?p=69170"},"modified":"2023-03-06T10:51:00","modified_gmt":"2023-03-06T08:51:00","slug":"autostrada-moldovei-vazuta-din-avion-imagini-in-premiera-cu-traseul-viitoarei-artere-de-mare-viteza","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=69170","title":{"rendered":"Autostrada Moldovei, v\u0103zut\u0103 din avion. Imagini \u00een premier\u0103 cu traseul viitoarei artere de mare vitez\u0103"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-69171 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/03\/a-7-din-avion-1-390x293.jpg\" alt=\"\" width=\"390\" height=\"293\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2023\/03\/a-7-din-avion-1-390x293.jpg 390w, https:\/\/infois.ro\/wp-content\/uploads\/2023\/03\/a-7-din-avion-1.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\">&#8220;Dac\u0103 zbura\u0163i de la Bucure\u015fti la Ia\u015fi, pute\u0163i vedea cum prinde contur Autostrada Moldovei A7 pe toat\u0103 lungimea traseului de la Ploie\u015fti la Pa\u015fcani. \u0162inta noastr\u0103 este finalizarea celor 322 de kilometri p\u00e2n\u0103 la Pa\u015fcani p\u00e2n\u0103 \u00een anul 2025, cu un an mai devreme dec\u00e2t este prev\u0103zut termenul \u00een Planul Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 PNRR&#8221;, scrie Irinel Ionel Scrio\u015fteanu, secretar de Stat \u00een Ministerul Transporturilor, pe pagina proprie de socializare. Textul este \u00eenso\u0163it de mai multe fotografii f\u0103cute din avion pe \u015fantierul Autostr\u0103zii A7.<\/p>\n<p style=\"text-align: justify;\">Autostrada A7 (Autostrada Moldovei) are o lungime total\u0103 de 445 de kilometri, \u00eentre Ploie\u015fti \u015fi Siret. Lucr\u0103rile la tronsonul Ploie\u015fti &#8211; Pa\u015fcani (335 de kilometri) sunt\u00a0 finan\u0163ate prin Planul Na\u0163ional de Reedresare \u015fi Rezilien\u0163\u0103 (PNRR), termenul de finalizare a investi\u0163iei fiind 31 decembrie 2026. Traseul cuprins \u00eentre Ploie\u015fti \u015fi Pa\u015fcani a fost \u00eemp\u0103r\u0163it \u00een 13 loturi, lucr\u0103rile la 7 dintre acestea fiind adjudecate de firma UBB, apar\u0163in\u00e2nd omului de afaceri Dorinel Umbr\u0103rescu.<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-69172 alignright\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/03\/a-7-din-avion-2-390x293.jpg\" alt=\"\" width=\"390\" height=\"293\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2023\/03\/a-7-din-avion-2-390x293.jpg 390w, https:\/\/infois.ro\/wp-content\/uploads\/2023\/03\/a-7-din-avion-2.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\">\u00cen ceea ce prive\u015fte tronsonul Pa\u015fcani &#8211; Siret, pentru care documenta\u0163ia se afl\u0103 \u00een acest moment la stadiul de elaborare a studiului de fezabilitiate \u015fi apoi a proiectului tehnic, lucr\u0103rile ar urma s\u0103 fie finan\u0163ate de Uniunea European\u0103, prin Programul Opera\u0163ional de Transport (POT) 2021 &#8211; 2027.<\/p>\n<p style=\"text-align: justify;\">Cele trei loturi de pe tronsonul Bac\u0103u \u2013 Pa\u015fcani al Autostr\u0103zii A7 (Autostrada Moldovei), \u00een lungime total\u0103 de 77,39 kilometri, vor fi construite de firma UMB, aceea\u015fi care a c\u00e2\u015ftigat licita\u0163ia \u015fi pentru loturile de pe tronsonul Buz\u0103u \u2013 Bac\u0103u.<\/p>\n<p style=\"text-align: justify;\">Parametrii tehnici ai celor trei loturi sunt urm\u0103torii: lotul 1 S\u0103uce\u015fti (Bac\u0103u) \u2013 Trife\u015fti T\u00e2rg (30,30 km), lotul 2 Trife\u015fti \u2013 Gher\u0103ie\u015fti (18,99 km), lotul 3 Mirce\u015fti \u2013 Pa\u015fcani (28,09 km).<\/p>\n<p style=\"text-align: justify;\">\u00cen total, sectorul Bac\u0103u &#8211; Pa\u015fcani cuprinde 112 poduri, pasaje, viaducte, structuri casetate, 9 noduri rutiere, 4 parc\u0103ri securizate, 4 parc\u0103ri de scurt\u0103 durat\u0103, un centru de \u00eentre\u021binere \u0219i coordonare, 50 de spa\u021bii de \u00eenc\u0103rcare pentru autovehiculele electrice \u0219i 140 de hectare de perdele forestiere cu rol de protec\u021bie.<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-69173 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/03\/a-7-din-avion-3-390x293.jpg\" alt=\"\" width=\"390\" height=\"293\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2023\/03\/a-7-din-avion-3-390x293.jpg 390w, https:\/\/infois.ro\/wp-content\/uploads\/2023\/03\/a-7-din-avion-3.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\">Conform proiectului tehnic, la intersec\u0163ia A7 cu A8 este prev\u0103zut un nod rutier de tip turbion, respectiv o intersec\u0163ie cu bretele de vitez\u0103 pentru toate direc\u0163iile. Din cei 77 de kilometri, 30 kilometri sunt pe teritoriul jude\u021bului Ia\u0219i, respectiv pe raza localit\u0103\u021bilor Mirce\u0219ti, H\u0103l\u0103uce\u0219ti, Mogo\u0219e\u0219ti-Siret, Stolniceni-Pr\u0103jescu \u0219i Pa\u0219cani, valoarea investi\u0163iei ridic\u00e2ndu-se la 1,8 miliarde de lei,<\/p>\n<p style=\"text-align: justify;\">Cele trei tronsoane ale autostr\u0103zii Bac\u0103u \u2013 Pa\u015fcani au o valoare total\u0103 \u00a0estimat\u0103 a lucr\u0103rilor de 4,7 miliarde lei, f\u0103r\u0103 TVA, termenul de realizare a investi\u0163iei fiind de 30 de luni de la semnarea contractului. \u00cen total, UMB urmeaz\u0103 s\u0103 construiasc\u0103 255,735 de kilometri, \u00eemp\u0103r\u0163i\u0163i \u00een zece loturi, din Autostrada A7, \u00eentre Buz\u0103u \u0219i Pa\u0219cani.<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-69174 alignright\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/03\/a-7-din-avion-4-390x293.jpg\" alt=\"\" width=\"390\" height=\"293\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2023\/03\/a-7-din-avion-4-390x293.jpg 390w, https:\/\/infois.ro\/wp-content\/uploads\/2023\/03\/a-7-din-avion-4.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#8220;Dac\u0103 zbura\u0163i de la Bucure\u015fti la Ia\u015fi, pute\u0163i vedea cum prinde contur Autostrada Moldovei A7&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=69170\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":69171,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,41],"tags":[74,15371,40,2936,15116,4721],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/69170"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=69170"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/69170\/revisions"}],"predecessor-version":[{"id":69175,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/69170\/revisions\/69175"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/69171"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=69170"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=69170"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=69170"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}