{"id":70384,"date":"2023-04-14T09:52:53","date_gmt":"2023-04-14T06:52:53","guid":{"rendered":"https:\/\/infois.ro\/?p=70384"},"modified":"2023-04-18T09:55:25","modified_gmt":"2023-04-18T06:55:25","slug":"un-nou-pas-in-vederea-inceperii-lucrarilor-la-autostrada-moldovei","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=70384","title":{"rendered":"Un nou pas \u00een vederea \u00eenceperii lucr\u0103rilor la Autostrada Moldovei"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-70385 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/04\/autostrada-mircesti-pascani-390x182.jpg\" alt=\"\" width=\"390\" height=\"182\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2023\/04\/autostrada-mircesti-pascani-390x182.jpg 390w, https:\/\/infois.ro\/wp-content\/uploads\/2023\/04\/autostrada-mircesti-pascani.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\">Joi, 13 aprilie, a fost emis\u0103 Autoriza\u021bia de Construire pentru lotul 3 al tronsonului Mirce\u015fti &#8211; Pa\u015fcani (sec\u021biunea Bac\u0103u-Pa\u0219cani) al Autostr\u0103zii A7 (Autostrada Moldovei), urm\u00e2nd ca pe data de 2 mai s\u0103 fie semnat ordinul de \u00eencepere a lucr\u0103rilor, a scris Andrei Cazacu, administratorul public al jude\u0163ului Ia\u015fi, pe contul propriu de socializare. Potrivit acestuia, pe lotul 3 al tronsonului Mirce\u015fti &#8211; Pa\u015fcani, \u00een lungime de 28,09 kilometri vor fi construite trei noduri rutiere, \u015fapte poduri, dou\u0103 pasaje \u0219i 32 de pode\u021be, constructorul rom\u00e2n care a c\u00e2\u015ftigat licita\u0163ia av\u00e2nd la dispozi\u021bie 30 de luni \u0219i 1,76 miliarde de lei (f\u0103r\u0103 TVA) pentru execu\u021bia lucr\u0103rilor, finan\u021bate prin Planul Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 (PNRR). Autostrada Moldovei, din care face parte \u0219i sec\u021biunea Bac\u0103u &#8211; Pa\u015fcani, are o lungime de 320 de kilometri, iar lucr\u0103rile trebuie finalizate p\u00e2n\u0103 \u00een anul 2026. \u00cen acest moment, toate cele 13 loturi ale Autostr\u0103zii Moldovei au Autoriza\u021bie de Construire.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Joi, 13 aprilie, a fost emis\u0103 Autoriza\u021bia de Construire pentru lotul 3 al tronsonului Mirce\u015fti&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=70384\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":70385,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,6421,16479,40],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/70384"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=70384"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/70384\/revisions"}],"predecessor-version":[{"id":70386,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/70384\/revisions\/70386"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/70385"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=70384"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=70384"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=70384"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}