{"id":75078,"date":"2023-11-08T11:27:56","date_gmt":"2023-11-08T09:27:56","guid":{"rendered":"https:\/\/infois.ro\/?p=75078"},"modified":"2023-11-08T11:27:56","modified_gmt":"2023-11-08T09:27:56","slug":"consiliul-judetean-anunta-finalizarea-lucrarilor-de-pe-lotul-i-al-axei-rutiere-strategice-1-iasi-suceava","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=75078","title":{"rendered":"Consiliul Jude\u0163ean anun\u0163\u0103 finalizarea lucr\u0103rilor de pe Lotul I al Axei Rutiere Strategice 1 Ia\u0219i &#8211; Suceava"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-75079 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2023\/11\/finalizare-lot-1-iasi-sv-390x293.jpg\" alt=\"\" width=\"390\" height=\"293\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2023\/11\/finalizare-lot-1-iasi-sv-390x293.jpg 390w, https:\/\/infois.ro\/wp-content\/uploads\/2023\/11\/finalizare-lot-1-iasi-sv.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\">Conducerea Consiliului Jude\u021bean (CJ) Ia\u0219i \u00eempreun\u0103 cu reprezentan\u0163ii institu\u0163iilor abilitate au \u00eenceput verific\u0103rile \u00een teren \u00een vederea recep\u021bion\u0103rii lucr\u0103rilor de pe Lotul I al Axei Rutiere Strategice 1: Ia\u0219i \u2013 Suceava, proiect finan\u021bat \u00een cadrul Programului Opera\u021bional Regional (POR) 2014 \u2013 2020 al Uniunii Europene, Axa prioritar\u0103 6 \u00cembun\u0103t\u0103\u021birea infrastructurii rutiere de importan\u021b\u0103 regional\u0103 \u0219i local\u0103, Prioritatea de investi\u021bii 6.1 Stimularea mobilit\u0103\u021bii regionale prin conectarea nodurilor secundare \u0219i ter\u021biare la infrastructura TEN-T, inclusiv a nodurilor multimodale \u0219i care vizeaz\u0103 \u00eembun\u0103t\u0103\u021birea accesibilit\u0103\u021bii \u0219i mobilit\u0103\u021bii popula\u021biei, bunurilor \u0219i serviciilor, \u00een vederea dezvolt\u0103rii economice durabile, prin dezvoltarea infrastructurii rutiere interjude\u021bene.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Lotul I al Axei Rutiere Strategice 1: Ia\u0219i \u2013 Suceava include 29,584 kilometri \u0219i asigur\u0103 leg\u0103tura dintre DJ 282 limita Municipiului Ia\u0219i &#8211; Rediu &#8211; Movileni \u2013 Gropni\u021ba \u2013 DJ 281D. Lucr\u0103rile de modernizare au inclus l\u0103rgirea \u0219i consolidarea drumului, asigurarea elementelor de scurgere a apelor pluviale prin realizarea de \u0219an\u021buri, rigole \u0219i pu\u021buri absorbante, reabilitarea podurilor \u0219i pode\u021belor pe tot traseul drumului, amenajarea drumurilor laterale \u0219i a trecerilor la nivel cu cale ferat\u0103, precum \u0219i montarea unor parape\u021bi de siguran\u021b\u0103. Valoarea total\u0103 a acestei investi\u021bii este de aproximativ 79 de milioane lei (inclusiv TVA).<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">\u201eAxa Rutier\u0103 Strategic\u0103 1: Ia\u0219i \u2013 Suceava reprezint\u0103 unul dintre proiectele majore privind modernizarea infrastructurii rutiere a jude\u021bului nostru, prin care reu\u0219im s\u0103 asigur\u0103m conectivitatea interjude\u021bean\u0103, un pas important \u00een dezvoltarea jude\u021belor din regiunea Moldovei. Acest proiect a fost, \u00eenc\u0103 de la ini\u021bierea discu\u021biilor dintre Consiliul Jude\u021bean Ia\u0219i \u0219i Consiliul Jude\u021bean Suceava, o adev\u0103rat\u0103 provocare, dat fiind faptul c\u0103 discutam despre cel mai mare obiectiv de investi\u021bii derulat de o autoritate public\u0103 local\u0103. Din p\u0103cate, atunci c\u00e2nd am preluat conducerea Consiliului Jude\u021bean Ia\u0219i \u00een 2020, lucr\u0103rile de pe Lotul I al Axei Rutiere Strategice 1: Ia\u0219i &#8211; Suceava erau aproape de zero, iar lucr\u0103rile de pe toate cele 3 loturi nu \u00eencepuser\u0103. \u00cen acest timp, valoarea final\u0103 a proiectului se dublase,\u00a0 \u00eens\u0103 m\u0103 bucur c\u0103 am reu\u0219it s\u0103 finaliz\u0103m \u0219i acest lot, valorific\u00e2nd finan\u021barea european\u0103 \u0219i asigur\u00e2nd o mai bun\u0103 accesibilitate, cre\u0219terea vitezei medii de deplasare \u0219i, mai ales, siguran\u021b\u0103 \u00een trafic\u201d, a declarat Costel Alexe, pre\u0219edintele CJ Ia\u015fi.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">\u00cen luna martie, Consiliul Jude\u021bean Ia\u0219i a recep\u021bionat lucr\u0103rile de pe Lotul 2 al Axei rutiere strategice Ia\u0219i \u2013 Suceava, cu o lungime de 20,001 kilometri. Acest lot include DJ 281D \u00eentre Coarnele Caprei \u2013 Focuri \u2013 Gropni\u021ba \u0219i DJ 281 B \u00eentre Coarnele Caprei \u0219i Belce\u0219ti, valoarea final\u0103 a lucr\u0103rilor executate fiind de 64.305.090,05 lei cu TVA.<\/p>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\">Lucr\u0103rile de pe Lotul 3 al Axei rutiere strategice Ia\u0219i \u2013 Suceava, ce cuprinde peste 40 de kilometri de drum jude\u021bean de pe raza a cinci comune: DJ 281 de la Belce\u0219ti \u2013 Cepleni\u021ba \u2013 DN 28B \u0219i DJ 281 de la DN 28B \u2013 Scobin\u021bi \u2013 Lespezi se afl\u0103 \u00een acest moment la un stadiu de execu\u021bie de 90%, acestea urm\u00e2nd a fi finalizate p\u00e2n\u0103 la sf\u00e2r\u0219itul acestui an.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Conducerea Consiliului Jude\u021bean (CJ) Ia\u0219i \u00eempreun\u0103 cu reprezentan\u0163ii institu\u0163iilor abilitate au \u00eenceput verific\u0103rile \u00een teren&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=75078\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":75079,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,12506,40,7187],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/75078"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=75078"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/75078\/revisions"}],"predecessor-version":[{"id":75080,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/75078\/revisions\/75080"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/75079"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=75078"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=75078"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=75078"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}