{"id":77609,"date":"2024-04-04T18:38:39","date_gmt":"2024-04-04T15:38:39","guid":{"rendered":"http:\/\/infois.ro\/?p=77609"},"modified":"2024-04-05T10:43:45","modified_gmt":"2024-04-05T07:43:45","slug":"iasul-va-avea-inca-18-tramvaie-noi","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=77609","title":{"rendered":"Ia\u0219ul va avea \u00eenc\u0103 18 tramvaie noi"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-77610 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2024\/04\/lot-18-doi-390x293.jpg\" alt=\"\" width=\"390\" height=\"293\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2024\/04\/lot-18-doi-390x293.jpg 390w, https:\/\/infois.ro\/wp-content\/uploads\/2024\/04\/lot-18-doi.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\">\u00cen prezen\u0163a primarului Mihai Chirica \u015fi a reprezentan\u0163ilor companiei\u00a0Bozankaya, Emrah Dal \u2013 vicepre\u015fedinte \u015fi Ula\u015f Be\u015ftepe \u2013 manager de\u00a0proiect, la Ia\u015fi a fost semnat joi contractul privind achizi\u0163ionarea\u00a0de c\u0103tre Municipiul Ia\u015fi a \u00eenc\u0103 18 tramvaie noi prin intermediul Planului\u00a0Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 (PNRR) &#8211; Componenta 10 \u201eFondul\u00a0Local\u201d. Oferta depus\u0103 de firma Bozankaya a fost de 141.390.00 lei f\u0103r\u0103 TVA\u00a0(168.254.100 lei cu TVA), superioar\u0103 din punct de vedere financiar celei\u00a0\u00eenaintat\u0103 de cealalt\u0103 societate \u00eenscris\u0103 la licita\u0163ie. Potrivit contractului, turcii\u00a0vor trebui s\u0103 livreze tramvaiele p\u00e2n\u0103 cel t\u00e2rziu la data de 30 iunie 2026. P\u00e2n\u0103\u00a0acum, firma turc\u0103 Bozankaya a mai livrat municipiului Ia\u015fi alte 16 tramvaie.<\/p>\n<p style=\"text-align: justify;\">\u201eEste un nou pas \u00een modernizarea transportului de c\u0103l\u0103tori din\u00a0municipiul Ia\u0219i. Ast\u0103zi am parafat \u0219i am demarat efectiv un nou\u00a0contract de achizi\u021bie pentru un num\u0103r de 18 tramvaie noi. Partenerul\u00a0nostru, firma Bozankaya, vine al\u0103turi de noi \u0219i dore\u0219te s\u0103 ne furnizeze\u00a0aceste tramvaie. Noi le-am exploatat timp de doi ani, \u0219tim foarte bine\u00a0cum se comport\u0103 ele \u00een trafic, cunoa\u0219tem toate metehnele \u0219i tot ceea ce\u00a0ele au nevoie pentru a fi c\u00e2t mai prezente al\u0103turi de noi. Sunt bune,\u00a0func\u021bioneaz\u0103 foarte bine, la fel ca \u0219i celelalte din lotul polonez, sper\u0103m\u00a0s\u0103 le avem c\u00e2t mai repede la Ia\u0219i, pentru c\u0103 ele reprezint\u0103 totodat\u0103 \u0219i o\u00a0form\u0103 de atractivitate pentru c\u0103l\u0103tori\u201d, a declarat primarul Mihai Chirica, care s-a declarat foarte mul\u021bumit de modul \u00een care tramvaiele produse de firma turc\u0103 se comport\u0103 \u00een trafic.<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-77611 alignright\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2024\/04\/lot-18-trei-390x176.jpg\" alt=\"\" width=\"390\" height=\"176\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2024\/04\/lot-18-trei-390x176.jpg 390w, https:\/\/infois.ro\/wp-content\/uploads\/2024\/04\/lot-18-trei.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\">Potrivit acestuia, cele 18 tramvaie contractate de Municipiul Ia\u0219i vor intra \u00een produc\u021bie anul viitor. \u201eAnul acesta urmeaz\u0103 s\u0103 fie finalizat\u0103 faza de proiectare, iar de la anul ele vor intra \u00een produc\u021bie \u0219i testare \u0219i sper\u0103m ca p\u00e2n\u0103 la sf\u00e2r\u0219itul anului viitor, cele mai multe dintre ele s\u0103 fi ajuns deja la Ia\u0219i\u201d, a spus edilul. \u0218eful municipalit\u0103\u021bii a subliniat c\u0103, gra\u0163ie atragerii fondurilor europene prin Planul Na\u021bional de Redresare \u0219i Rezlilien\u021b\u0103 (PNRR) \u0219i a Programului Opera\u0163ional Regional (POR) al Uniunii Europene, Ia\u0219ul va avea, \u00een final, \u00een total, 119 mijloace de transport electrice noi (50 de tramvaie \u015fi 69 de autobuze), \u00een valoare total\u0103 de aproximativ 744 de milioane de lei, respectiv circa 150 de milioane de euro. \u201eVom investi \u00een continuare \u00een programul\u00a0de modernizare a transportului public \u015fi de transformare a acestuia\u00a0\u00eentr-unul verde, modern, inteligent\u201d, a afirmat edilul.<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-77612 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2024\/04\/bozankaya-390x260.jpg\" alt=\"\" width=\"390\" height=\"260\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2024\/04\/bozankaya-390x260.jpg 390w, https:\/\/infois.ro\/wp-content\/uploads\/2024\/04\/bozankaya.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\">\u201ePentru noi, acest proiect a fost deja demarat. Lucr\u0103m deja la faza de proiectare \u0219i design, cu echipa de speciali\u0219ti de la Ia\u0219i. \u00centr-un termen de 18 luni dorim s\u0103 livr\u0103m primele unit\u0103\u021bi, P\u00e2n\u0103 acum, am mai livrat Municipiului Ia\u0219i alte 16 unit\u0103\u021bi de acela\u0219i tip, c\u0103rora le asigur\u0103m \u0219i mentenan\u021ba \u00een exploatare. Pentru acest nou lot de tramvaie plec\u0103m de la experien\u021ba pe care deja am acumulat-o, \u00eencerc\u00e2nd s\u0103 folosim acela\u0219i tipuri de piese, pentru a avea costuri de \u00eentre\u021binere c\u00e2t mai sc\u0103zute \u0219i pentru a asigura o mentenan\u021b\u0103 c\u00e2t mai sigur\u0103\u201d, a declarat Emrah Dal, vicepre\u0219edintele\u00a0Bozankaya. Potrivit acestuia, designul realizat pentru tramvaiele livrate\u00a0municipiului Ia\u0219ului este unul specific doar acestui ora\u0219, speciali\u0219tii\u00a0companiei acord\u00e2nd o mare importan\u021b\u0103 ca designul interior s\u0103 fie unul c\u00e2t\u00a0mai confortabil \u0219i \u00een conformitate cu cerin\u021bele beneficiarului.<\/p>\n<p style=\"text-align: justify;\">Cele 18 unit\u0103\u021bi au o lungime de circa 22 de metri \u0219i o capacitate de transport\u00a0total\u0103 de aproximativ 230 de locuri. Tramvaiele au podea joas\u0103 \u0219i sunt\u00a0echipate cu instala\u021bie de aer condi\u021bionat, instala\u021bie de \u00eenc\u0103lzire\u00a0corespunz\u0103toare pentru sezonul rece, sistem de num\u0103rare a c\u0103l\u0103torilor,\u00a0instala\u021bie audio \u2013 video \u00een interior, anun\u021buri vocale exterioare \u00een sta\u021bii,\u00a0instala\u021bie pentru echipamentele de ticketing etc. Dup\u0103 cum a declarat Cristian Stoica, directorul general al Companiei de Transport Public (CTP),\u00a0noul lot de tramvaie va contribui la \u00eembun\u0103t\u0103\u021birea transportului public din\u00a0municipiul Ia\u0219i. \u201e\u00cen acest moment, la Ia\u0219i mai avem \u00eenc\u0103 70-80 de\u00a0tramvaie rulate, pe care \u00een viitor, cu ajutorul altor proiecte europene,\u00a0sper\u0103m s\u0103 le re\u00eennoim complet. \u00cen ceea ce prive\u0219te traseele pe care urmeaz\u0103 s\u0103 fie introduse aceste tramvaie noi, nu exist\u0103 o regul\u0103, ele urm\u00e2nd s\u0103 fie introduse treptat pe toate traseele\u201d, a declarat Cristian Stoica.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00cen prezen\u0163a primarului Mihai Chirica \u015fi a reprezentan\u0163ilor companiei\u00a0Bozankaya, Emrah Dal \u2013 vicepre\u015fedinte \u015fi Ula\u015f&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=77609\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":77610,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,12850,3905,40,15116,388],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/77609"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=77609"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/77609\/revisions"}],"predecessor-version":[{"id":77613,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/77609\/revisions\/77613"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/77610"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=77609"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=77609"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=77609"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}