{"id":83559,"date":"2026-05-07T12:24:50","date_gmt":"2026-05-07T09:24:50","guid":{"rendered":"https:\/\/infois.ro\/?p=83559"},"modified":"2026-05-07T12:24:50","modified_gmt":"2026-05-07T09:24:50","slug":"primaria-si-a-anuntat-intentia-de-a-colabora-cu-companiile-interesate-de-producerea-energiei-electrice-si-termice-din-deseuri","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=83559","title":{"rendered":"Prim\u0103ria \u0219i-a anun\u021bat inten\u021bia de a colabora cu companiile interesate de producerea energiei electrice \u0219i termice din de\u0219euri"},"content":{"rendered":"<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-83560 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2026\/05\/deseuri-390x260.jpg\" alt=\"\" width=\"390\" height=\"260\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2026\/05\/deseuri-390x260.jpg 390w, https:\/\/infois.ro\/wp-content\/uploads\/2026\/05\/deseuri.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\">Recuperarea energiei din de\u0219euri reprezint\u0103 o component\u0103 esen\u021bial\u0103 a economiei circulare, oferind o solu\u021bie pentru de\u0219eurile care nu pot fi reciclate, reduc\u00e2nd \u00een acela\u0219i timp dependen\u021ba de combustibilii fosili \u0219i emisiile de gaze cu efect de ser\u0103 asociate depozit\u0103rii.<br \/>\nProducerea energiei electrice \u0219i termice din RDF (Refuse Derived Fuel) reprezint\u0103 o solu\u021bie inovatoare pentru gestionarea de\u0219eurilor, a\u0219a cum sunt: de\u0219eurile municipale solide, de\u0219eurile industriale \u0219i comerciale. Din analiza cantit\u0103\u021bilor de de\u0219euri colectate \/ reciclate \/ valorificabile \u00een Municipiul Ia\u0219i \u0219i \u00een Jude\u021bul Ia\u0219i, rezult\u0103 c\u0103 anual se pot procesa 8000 tone de de\u0219euri sub form\u0103 de RDF. De asemenea cantitatea de energie termic\u0103 produs\u0103 \u00een cursul anului 2025 \u00een Municipiul Ia\u0219i a fost de 368.978,00 MWh.<br \/>\nMunicipiul Ia\u0219i inten\u021bioneaz\u0103 valorificarea superioar\u0103 a de\u0219eurilor colectate \u00een municipiu de c\u0103tre operatorul de salubritate, Salubris SA, \u00een sensul proces\u0103rii \u00een energie a de\u0219eurilor care nu pot fi recuperate \u00een alte moduri.<br \/>\nMunicipiul Ia\u0219i de\u021bine \u00een zona amplasamentului de de\u0219euri \u021au\u021bora din Comuna Holboca, Jude\u021bul Ia\u0219i, unitatea CET II Holboca, o central\u0103 de cogenerare care a func\u021bionat cu combustibil solid (huil\u0103). Capacit\u0103\u021bile energetice din CET II Holboca au fost retrase din exploatare \u00eencep\u00e2nd cu decembrie 2025, \u00een conformitate cu prevederile Ordonan\u021bei de Urgen\u021b\u0103 a Guvernului nr. 108\/2022 privind decarbonizarea sectorului energetic, cu modific\u0103rile \u0219i complet\u0103rile ulterioare.<br \/>\nPreciz\u0103m c\u0103 pe amplasamentul din CET II Holboca Municipiul Ia\u0219i implementeaz\u0103 urm\u0103toarele proiecte cu finan\u021bare european\u0103\/guvernamental\u0103:<br \/>\n&#8211; Conversia CET II Holboca de pe huil\u0103 pe gaze naturale prin instalarea unor grupuri de cogenerare (CHP) noi H2 ready : Instalarea de noi echipamente de producere energie termic\u0103 util\u0103 \u00een cogenerare (CHP) \u00een CET II Ia\u0219i are o capacitate nominal\u0103 a instala\u021biei CHP stabilit\u0103 la minim 28,16 MWt \u0219i minim 26,80 MWe. Achizi\u021bia contractului de proiectare \u0219i execu\u021bie lucr\u0103ri este \u00een derulare \u2013 evaluare ofert\u0103 depus\u0103.<br \/>\n&#8211; Amplasare panouri fotovoltaice la CET II Holboca.<br \/>\nMunicipiul Ia\u0219i a\u0219teapt\u0103 scrisori de interes din partea companiilor de profil interesate, urm\u00e2nd s\u0103 fie lansat\u0103 \u0219i o procedur\u0103 public\u0103 de selec\u021bie a unor parteneri \u00een acest demers.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Recuperarea energiei din de\u0219euri reprezint\u0103 o component\u0103 esen\u021bial\u0103 a economiei circulare, oferind o solu\u021bie pentru&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=83559\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":83560,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,333,40,928,18491,8701],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/83559"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=83559"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/83559\/revisions"}],"predecessor-version":[{"id":83561,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/83559\/revisions\/83561"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/83560"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=83559"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=83559"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=83559"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}