{"id":83934,"date":"2026-06-19T15:11:21","date_gmt":"2026-06-19T12:11:21","guid":{"rendered":"http:\/\/infois.ro\/?p=83934"},"modified":"2026-06-19T15:11:21","modified_gmt":"2026-06-19T12:11:21","slug":"cel-mai-amplu-program-de-modernizare-a-transportului-public-din-istoria-iasului","status":"publish","type":"post","link":"https:\/\/infois.ro\/?p=83934","title":{"rendered":"Cel mai amplu program de modernizare a transportului public din istoria Ia\u0219ului"},"content":{"rendered":"<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-83935 alignleft\" src=\"http:\/\/infois.ro\/wp-content\/uploads\/2026\/06\/transport-390x260.jpg\" alt=\"\" width=\"390\" height=\"260\" srcset=\"https:\/\/infois.ro\/wp-content\/uploads\/2026\/06\/transport-390x260.jpg 390w, https:\/\/infois.ro\/wp-content\/uploads\/2026\/06\/transport.jpg 640w\" sizes=\"(max-width: 390px) 100vw, 390px\" \/><\/p>\n<p style=\"text-align: justify;\">\u200bPrim\u0103ria Municipiului Ia\u0219i \u0219i Compania de Transport Public (CTP) Ia\u0219i au organizat joi, 18 iunie 2026, Ia\u0219i Urban Mobility Summit 2026\u2014un eveniment strategic de anvergur\u0103 dedicat mobilit\u0103\u021bii urbane \u0219i metropolitane, digitaliz\u0103rii infrastructurii \u0219i finan\u021b\u0103rii inteligente.<br \/>\n\u200b\u00cen deschiderea summitului, al\u0103turi de companiile partenere, a fost organizat\u0103 conferin\u021ba de pres\u0103 ce marcheaz\u0103 finalizarea cu succes a unor proiecte majore de transport finan\u021bate prin Planul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR).<br \/>\n\u200b\u00cen ultimii ani, Ia\u0219ul a implementat unul dintre cele mai ambi\u021bioase programe de modernizare din \u021bar\u0103: 25 de autobuze electrice Karsan noi, achizi\u021bionate printr-un contract de 70.657.625,61 lei (finan\u021bare PNRR total\u0103 de ~14,4 milioane de euro). Proiectul a inclus, pe l\u00e2ng\u0103 cele 25 de autobuze de 10 metri ajunse deja \u00een totalitate la Ia\u0219i, \u0219i instalarea a 25 de sta\u021bii de \u00eenc\u0103rcare lent\u0103 \u00een garaj \u0219i a 8 sta\u021bii de \u00eenc\u0103rcare rapid\u0103 pe traseu; 18 tramvaie noi Bozankaya: o investi\u021bie masiv\u0103 de 210.888.468 lei (~42,7 milioane de euro) prin PNRR. Toate cele 18 tramvaie moderne de 22 de metri au fost livrate \u0219i se afl\u0103 deja \u00een serviciul ie\u0219enilor.<br \/>\nDe asemenea, pe 118 tramvaie au fost finalizate instal\u0103rile \u0219i calibr\u0103rile sistemelor de avertizare \u0219i asisten\u021b\u0103 anti-coliziune dezvoltate de renumitul concern german Bosch (investi\u021bie de 21.967.548,75 lei). Pe 140 de autobuze a fost pus \u00een func\u021biune sistemul de avertizare \u0219i asisten\u021b\u0103 anti-coliziune furnizat de Xceza SRL Bucure\u0219ti (\u00een valoare de 6.150.872 lei).<br \/>\nIa\u0219ul beneficiaz\u0103 \u00een prezent de o flot\u0103 verde impresionant\u0103: 119 mijloace de transport 100% electrice (50 de tramvaie \u0219i 69 de autobuze), o investi\u021bie total\u0103 care se ridic\u0103 la aproximativ 744 de milioane de lei (circa 150 de milioane de euro).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u200bPrim\u0103ria Municipiului Ia\u0219i \u0219i Compania de Transport Public (CTP) Ia\u0219i au organizat joi, 18 iunie&#8230; <a class=\"meta-more\" href=\"https:\/\/infois.ro\/?p=83934\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":83935,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,41],"tags":[74,40,15116,18548,982],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/83934"}],"collection":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=83934"}],"version-history":[{"count":1,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/83934\/revisions"}],"predecessor-version":[{"id":83936,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/posts\/83934\/revisions\/83936"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=\/wp\/v2\/media\/83935"}],"wp:attachment":[{"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=83934"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=83934"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infois.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=83934"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}